Customer Charge On behalf of all DNs 25 October 2010.

Slides:



Advertisements
Similar presentations
July 2003 Structure of Electricity Distribution Charges Update and Proposals Martin Crouch Director, Distribution.
Advertisements

Funding UKLink Process changes (User Pays). 2 Purpose of Presentation  Review of User Pays  Principles  Application to date  National Grid NTS observations.
RIIO-T1 impact on allowed revenues and network charges 6 September 2012.
Proposal to Change the UNC AQ ‘Backstop Date’ to accommodate the 2010 Seasonal Normal Review DESC – 2nd October 2009 NOTE: Instances where TBC is stated.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
Retail Energy Forum Andrew Neves Central Networks - CMG Chair 2 March | Energy Networks Association.
21 May 2015 GAZ DE FRANCE ESS Mod 115 An alternative view Phil Broom Gaz de France ESS.
1 Project Nexus Market Differentiation Topic Workgroup 14 th & 15 th July 2009.
Mod 0445 – Amendment to the Arrangements for Daily Metered Supply Point Capacity Ofgem Direction to Provide Further Evidence National Grid Distribution.
Capacity trade and transfer mechanism and the next AMSEC auction Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 9 May 2007.
Industry Dialogue on xoserve Services Progress Report for Ofgem 5 th December 2006.
A layman’s guide to the structure of LDZ gas charges 27 July 2009 Please note – in the interests of clarity and accessibility, simplifications have been.
EHV generation charging methodology change Harvey Jones.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
DN Update 24 th May 2007 LDZ System Charges Capacity/Commodity Split and Interruptible Discounts.
1 EHV DG Charging Nigel Turvey. 2 Background Our current EHV charging methodology was not vetoed on 18 th February 2010 with the following treatment of.
Provision of third party access to licence exempt electricity and gas networks Andy Pace 4 October | Energy Networks Association - DCMF.
Nexus Workgroup CSEP Transition Topic June
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
National Grid UK Distribution Update Gas Customer Forum 29 th January 2007 Kerri Matthews.
UNC Proposal 329 – Review of Industry Charging & Contractual Arrangements - DM SHQs and DM SOQs Joel Martin – 21/09/10.
Delivering Connections and Capacity RIIO-T1 and associated commercial changes - Summary June 7th 2012.
LDZ System Charges – Structure Methodology 26 April 2010.
11 User Pays User Committee 12th November Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Governance and Charging Methodology for User Pays Services 10 th January 2007.
Presented by : Steven J Edwards, Head of Income and Pricing, Wales & West Utilities GDN Allowed and collected revenue awareness presentation for Shippers.
DNPC08 Review of Standard LDZ System Charges 6 September 2010.
11 User Pays User Committee 11th January Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Moving the QSEC and AMSEC Auctions Update. 2  Presented proposal at October Workstream  Questions / suggestions received, mainly around  Over & Under.
EDCM update Mo Sukumaran On behalf of DNOs ( WSB Chair) 1 December | Energy Networks Association - DCMF.
Structure of Charges Year-end review for DCMF 22 November 2007.
1 v1 iGT CSEP Billing Solution ScottishPower Proposals April 08.
Gas Distribution Transportation Charging What are the Risks to Pricing predictability? Stephen Marland Pricing Manager
11 User Pays User Committee 16th February Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Emergency Cashout Prices and Emergency Curtailment Quantity (ECQ) Adjustment Ritchard Hewitt Gas Code Development Manager.
Draft Modification Proposal: Population and Maintenance of Market Sector Code within Sites & Meters Simon Trivella –25 th February 2010 Distribution Workstream.
Code Governance Review UNC Modification Proposals Beverley Viney - National Grid NTS.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th March 2009.
DNPC08 Review of Standard LDZ System Charges Consultation Responses 25 October 2010.
1 UNC Review Group 175 – Encouraging Participation in the Elective Daily Metered Regime 26 th June 2008.
11 User Pays User Committee 10th August Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Industry Dialogue on xoserve Services 14 th September 2007.
PN UNC Workgroup Invoicing 10 th January Objectives of the Workgroups To determine business principles for future Invoicing processes –Consider/review.
Proposal to modify Standard Special Conditions A4, A5 and D11 of the Gas Transporter licence Distribution Charging Methodology Forum (DCMF) 13 August 2007.
DNPC05 Consultation Paper Balance of Revenue Recovery between LDZ System Charges and Customer Charges Steve Armstrong 27 th July 2009.
Draft Modification Proposal: Population and Maintenance of Market Sector Code within Sites & Meters Simon Trivella –26 th November 2009 Distribution Workstream.
1 Modification 0152V Implementation Matters 25 October 2007.
IGT and Shipper Workgroup meeting 28 th February 2011.
Customer Charge On behalf of all DNs 19 November 2010.
Background Current balance of LDZ System and Customer charges
Supply Point Register 7th December 2011
Supply Point Register 10th January 2012
UNC Modification Proposal 0202 National Grid Distribution
Consideration of issues raised by UNC Modification Proposal 0244
Code Governance Review UNC Modification Proposals
Mod 0621 Amendments to Gas Transmission Charging Regime
Modification th July 2008.
The Proposals Change the LDZ system charges target capacity/commodity split from 50:50 to 95:5 Introduce partial capacity charges for Interruptible supply.
Rebecca Hailes For 15 March 2018
Joint Office Presentation for Modification 0678
Presentation on behalf of all DNs Lorraine Goodall - SGN
UNC Modification Proposal 0385 Inclusion of DNOs as Users in User Pays Arrangements Phil Lucas 7 June 2011.
Mod Proposal 0268 : AQ Backstop Date
Modification Proposal 115 – ‘Correct Apportionment of NDM Error’
AUG Query Responses 21st November 2013.
Current situation The submission of AQ Appeals and AQ Amendments using two alternative dates and reads that provide a more realistic indication of the.
SSP – PROVISIONAL LSP – SSP AMENDMENT RULES
CAM: Next Steps UNC Transmission Workgroup Lisa Martin 9 January 2014.
Modification Proposal 136
Presentation transcript:

Customer Charge On behalf of all DNs 25 October 2010

History of the Customer Charge ______________________________________________________________________________________________________________________________ Originally determined by Transco Subsequent adjustments for: Removal of Meter reading costs, 1997 (PC17) Removal of Metering costs, 2000 (PC58) SSP conversion to capacity charge, 2007 (DNPC01) All current DN charges are based on these original National basis charging structures

The current Customer Charge ______________________________________________________________________________________________________________________________ Customer Charges generate around 30% of Collected Revenue; over 90% is collected from SSPs (circa £30/ SSP annually). Supply Points with an AQ above 732 MWh have a capacity based power function. Supply Points with an AQ between 732 MWh and 73.2MWh have a fixed unit capacity charge and an additional per supply point element. Supply Points with an AQ less than 73.2MWh have a fixed unit capacity charge.

Recent activity ______________________________________________________________________________________________________________________________ Final area of methodology in the 2006 Ofgem report to be reviewed Relevant costs were identified in DNPC05 DNs have prepared to consult on this area prior to change of governance DNPC08 responses suggest that some shippers may not be happy to see further changes close to the point of governance change

Proposed way forward ______________________________________________________________________________________________________________________________ Move forward with the review of the customer charge under the new governance regime Start the review process now, in order to not “lose” 3 months, and provide as much time as possible between decision and implementation. Requires buy-in from shipper community to engage in the process in advance of January.

Potential Timeline ______________________________________________________________________________________________________________________________ DateActionGovernance October 2010Presentation of issue and some potential solutions to DCMFExisting DCMF November 2010Receive feedback and further ideas, to enable development of UNC Modifications Existing DCMF December 2010DNs develop Modifications and circulate in draft for comment/discussion at DCMF Existing DCMF 2 January 2011DNs and/or shippers issue Modifications to JO for inclusion at next Modification Panel, recommending issue for consultation UNC 20 January 2011Modification Panel decides pathway:  Workgroup  Consultation (15 WD) (if consultation…) UNC 11 February 2011Final date for representationsUNC 17 February 2011FMR not ready for 5 days in advance due to close out dateUNC 17 March 2011Modification Panel votes on recommendationUNC ??Ofgem decision (KPI 25 days)UNC ASAP after decisionJO update UNC with legal text if it includes transitional arrangementsUNC 1 April 2012Implementation DateUNC

Relevant objectives ______________________________________________________________________________________________________________________________ (a) that compliance with the charging methodology results in charges which reflect the costs incurred by the licensee in its transportation business; (b) that, so far as is consistent with (a), the charging methodology properly takes account of developments in the transportation business; (c) that, so far as is consistent with (a) and (b), compliance with the charging methodology facilitates effective competition between gas shippers and between gas suppliers.

Costs underlying the Customer Charge ______________________________________________________________________________________________________________________________ Emergency costs Service Pipe replacement costs Service pipe operational costs e.g. leakage Service Pipe depreciation A share of indirect costs

Emergency Costs ______________________________________________________________________________________________________________________________ Emergency costs are driven by the existence of service pipes in the ground. No evidence of correlation between the volume of gas flowing through a service pipe or its capacity, and the likelihood that that pipe may have an emergency situation or the level of emergency cost incurred. Therefore it seems reasonable to allocate emergency costs by supply point or meter point.

Service pipe Repex ______________________________________________________________________________________________________________________________ Service pipe Repex costs are reported on the basis of whether they are Domestic or Non Domestic pipes.

Service pipe Operational Costs Leakage Less than 2% of customer costs Overall leakage is considered to be primarily a cost related to size of network rather than throughput or capacity No evidence of relationship with supply point size

Service pipe depreciation 1 ______________________________________________________________________________________________________________________________ Most services costs in the DN asset base are those built as part of the domestic “10 metre allowance” policy. These depreciation costs could be apportioned to domestic supply points only or to all supply points. The remaining depreciation costs are made up from replaced service pipes.

Service pipe depreciation 2 ______________________________________________________________________________________________________________________________ 10 metre allowance domestic service pipes replaced pipes Could be allocated across DOMESTIC supply points Could be allocated across ALL supply points Could be allocated across DOM and NON DOM supply points, in proportion to their relative asset value

Indirect Costs ______________________________________________________________________________________________________________________________ In line with other existing areas of methodology it is suggested that these costs be allocated in proportion to all the direct costs

Costs Overview ______________________________________________________________________________________________________________________________ Customer Charge related costs for Northern Gas Networks Cost Category % Emergency 7.5% Service Repex Expensed 15.4% Regulated Service Depreciation 17.5% Operational Costs 2.8% Work Management 6.8% Other Indirect Costs 5.8% Shrinkage Service Leakage 1.7% Network Rates 11.1% License, NTS pension etc 2.8% Scaling to Adjusted Allowed Revenue 28.6% Total 100.0%

Potential issues with cost Allocation ______________________________________________________________________________________________________________________________ Service pipe costs are reported as Domestic/Non Domestic (ie Market Sector Flag), not by load size or any other basis that could be a proxy for load size. It is not possible at present to invoice by Market Sector flag The split of depreciation between original connections and replacements is not known

Market Sector Flags ______________________________________________________________________________________________________________________________ Market sector flags have been a compulsory field within UK Link for around 4 years now, and over 70% of supply points have a flag. The table shows how they correspond to SSP and LSP load categories. Market Sector Flag AQ RangeI&CDomesticBlank % of I&C sites% of Dom sites in loadband (SSP)370,57914,683,9136,213, %99.8% (LSP)219,93036,36816, %0.2% (LSP)30, %0.00%

10m allowance v replacement pipes ______________________________________________________________________________________________________________________________ Difficult to determine proportion of new connection vs replacement assets. further investigation ongoing At network sale, no distinction was made between different types of service pipe assets, and so again some kind of proxy may need to be identified.

DN ideas to date ______________________________________________________________________________________________________________________________ A single charge per supply point for each network SSP and LSP charges per supply point for each network A derived capacity charge Shipper views sought

Next steps ______________________________________________________________________________________________________________________________ Arrange November DCMF workshop for this subject Collect feedback today for an initial view on what DNs should look into further for discussion in November Shippers invited to also individually discuss any ideas with DNs for further areas to investigate ready for November