R. Bailey, PS/SPS days, January 2005 Towards the CCC.

Slides:



Advertisements
Similar presentations
2012 OLA Library Building Awards Public Libraries
Advertisements

Crescent Academy International
SESAME Radiation Safety and PSS Phase I : Microtron + Booster Morteza Mansouri on behalf of Safety group TAC SESAME TAC 2013 : Morteza Mansouri.
Luminis CONTENT MANAGEMENT SYSTEM. What is Luminis CMS? Content Management System A CMS is a computer software system for organizing and facilitating.
ADMIN SERVICES OUTCOME 2 Describe the impact of changing working practices on the modern working environment.
1 Procuring a Design Project engineers perspective on starting the design process and establishing the A/E scope of work Frank C. Quigley General Engineer.
Management’s preliminary comments to the ERC Report.
Learning Space Development Toni Kelly; Associate Director Learning Environments 1.
Control Panel in Lecture Theatre Learning Environment Services.
Crest Interior Systems Crest Interior Systems PORTFOLIO Click mouse or press Space bar to Continue.
Office Clipart Just copy and paste the images you need into your presentation, place them in layers and scale them to suit your needs.
1 Distributed Systems: Distributed Process Management – Process Migration.
Most business meetings include from two to six people and can be held in a private office or in a department conference room. When more than six participants.
By Ray Info Solutions (P) Ltd.. For hotel industry, we offer our easy to use hotel software. It is a comprehensive software suite consisting of integrated.
Chapter 4 Office Layout.
October 24, 2000Milestones, Funding of USCMS S&C Matthias Kasemann1 US CMS Software and Computing Milestones and Funding Profiles Matthias Kasemann Fermilab.
1 ISE Differences between office and factory layout Product  Offices process information  Factories produce things Physical environment  Offices.
Jüri Järs Director. Collections (volumes) Received books in printed form (2009) * Access to e-books (titles) Subscribed printed journals.
The Work Environment Ergonomics – is an attempt to look at the office environment, and its impact on the individual. As a result many organisations have.
The Hamptons Interior Design Course A Introduction to Interior Design.
CCC status report 14/12/2004D.Manglunki AB/OP 1 Status of the CERN Control Centre D. Manglunki AB/OP.
LIANZA Sept Getting it together for libraries : Designing a collaborative learning centre Karen Kealy, Manager, Planning and Projects Information.
CCC Commissioning Django Manglunki, AB/OP PS-SPS Days 18/1/2006.
OLA Library Building Award. Interior Views of Library Entrance Major Public Services Position Typical User Areas Public Spaces – Existing Light Only Major.
Chapter 46 Commercial Construction Projects. 2 Links for Chapter 46 Types of Drawings Floor Plans Elevations Site Plans.
SPEECH PRIVACY INTRODUCTION ACOUSTICAL DEMANDS ENCLOSED ROOMS OPEN PLANS SPEECH PRIVACY:  SPEECH PRIVACY DEPENDS ON THE SIGNAL-TO-NOISE RATIO BETWEEN.
Status Report – Injection Working Group Working group to find strategy for more efficient start-up of injectors and associated facilities after long stops.
PS Days, January 2001 The “Plan” B.W.Allardyce The Medium Term Plan is presented at the June FC meeting by the Management and covers 4 years (I.e. in June.
Department of Correctional PRESENTATION ON THE DEVELOPMENT OF THE “NEW GENERATION” CORRECTIONAL FACILITY PROTOTYPES DEPARTMENT OF CORRECTIONAL SERVICES.
Michel Della Negra/Karlsruhe May PbWO4 Crystals: Energy Resolution  m /m = 0.5 [  E1 /E 1   E2 /E 2  cot(  /2)  ] H   Simulation (100.
University of Bolton Timetabling and Resource Scheduling at Bolton.
7 November 2003 Status of CNGS NBI presented by K. Elsener 1 Status of CNGS Konrad Elsener CERN – Accelerators+Beams Division.
Pay attention as I present pay attention as I present slide layout and content slide layout and content pacing pacing references to book (or not) references.
Management’s preliminary comments to the ERC Report FINANCE COMMITTEE June 19, 2002.
30th March 2007A.Fabich, CERN AB-ATB1 MERIT - Status of the Experiment A. Fabich CERN AB-ATB MERIT safety review (3)
Facilities for a Quality Child Development Program Child Services II.
1 CERN IT Department CH-1211 Genève 23 Switzerland t Risk of network incident during the last LHC run CERN, 10 January 2013
Interior Design. What is it? Interior design describes projects that turn an interior space in a setting for human activities that are to take place there.
13th May 2004Uwe Epting - TS/CSE-CO1 TS-CSE Outline –TCR and TS-CSE-CO mandate –Applications –Console layout –Hardware and Operating System –Strategy –Conclusion.
LHC Section Meeting 1.eLogbook 2.LHC Controls Security Panel.
Salmon River CSD Capital Project Phase II Monthly Status Report March & April 2016.
CD Strategy Session/Briefing on Collaboration Tools: Sept. 12, Collaboration Tools Erik Gottschalk.
SCX5 – Proposed New Intermediate floor over existing CMS Rack Room J.Osborne CEMESTE 20 Feb 2008.
D.Manglunki - AB/OP CCC Ergonomics D.Manglunki - AB/OP.
I.GS Action List following the 96 th meeting held on 15 June 2012 II.CERN Hotel III.Shuttle IV.Bicycle entries V.NOVAE snack service improvement VI.Parking.
CMS CB, 22 June CMS Centre Status Lucas Taylor CMS Centre Project Manager CMS Collaboration Board CMS Week, June CMS Centre Status 2.New offices.
AB-CO Exploitation 2006 & Beyond Presented at AB/CO Review 20Sept05 C.H.Sicard (based on the work of Exploitation WG)
AB-CO Review, 23 September 2005 L. Walckiers AT-MTM p. 1 Project description  To maintain for LHC completion  Magnet Rescue Activities [MAR]  Support.
D.Manglunki / AB-OP / AB/CO review: the CERN Control Centre AB/CO review D.Manglunki / AB-OP CERN Control Centre.
E.Guschin (INR,Moscow) 20 January 2006PS/SPD meeting CERN PS/SPD LED monitoring system status In December 2005: –All splitters and drivers are delivered.
Avondale City Center & American Sports Centers Amendment No. 2 Sports Facility Construction City Council January 4, 2010.
CMS Centre Project - Green Light Meeting
PRR Activation Meeting
P. Charrue on behalf of AB/CO/IN
Interior Design – Module 7
Status of Cryogenics Facilities Design
East Hall under construction
Facilities Management
Facilities Management
Facilities Management
Facilities Management
Facilities Management
Facilities Management
Facilities Management
Facilities Management
Facilities Management
Control Panels in Classroom
Progress Report 11/10/11.
1 Operations Management Layout Strategy. 2 What is Facility Layout Location or arrangement of everything within & around buildings Determines long-run.
The Work Environment Office ergonomics attempts to look at the impact of layout, ventilation, lighting or décor. Sick building syndrome – employees believe.
Presentation transcript:

R. Bailey, PS/SPS days, January 2005 Towards the CCC

R. Bailey, PS/SPS days, January 2005 Status December 2004

R. Bailey, PS/SPS days, January 2005 Reminder of what CCC is about  Merging of PS and SL divisions into AB department in 2003  One Operations group  Only makes sense in a single control room  DG decided early in 2004 that this will be on the B874 site  Bring together under one roof  MCR operations  PCR operations  TCR operations  LHC cryogenic operations  Result; the Cern Control Centre  Operational from 2006

R. Bailey, PS/SPS days, January 2005 Issues addressed over the last year(s)  Requirements and modifications to building 874  Requirements and layout of the CCC  Interior design of the CCC  Specification and procurement of the consoles  Staff needed in the coming years  People involved;  R.Bailey, M.Bätz, B.Frammery, D.Manglunki, R.Saban, L.Serio (CCCWG)  M.Delrieux, R.Giachino, S.Knoops, E.Liénard, L.Randot, L.Stewart (IDOC)  M.Clark, D.Hartley, J.Wood (CCD)  R.Ballet, A.Bland, P.Charrue, J.J.Cloye, C.Frisk, R.Hopkins (AB/CO)  J.L.Baldy, S.Anghelone, M.Poehler, P.Vachetta (TS/CE)  L.Burguete-Oliete, M.Colin, R.Forrest, R.Lauckner ($$)

R. Bailey, PS/SPS days, January 2005 Modified building rez 625m 2

R. Bailey, PS/SPS days, January 2005 Modified building etage

R. Bailey, PS/SPS days, January 2005 CCC layout issues  Contents  35 control console modules  5 access console modules  4 Mail/etc PC tables  1 social area  Storage furniture  Consultants used  Several iterations  Criteria applied  Links between the facilities  Accessibility to different areas  Balance between open and closed  Density of people  Noise levels

R. Bailey, PS/SPS days, January 2005 CCC layout – final Laura Stewart AT/ECR SPS LHC PS TI cryo

R. Bailey, PS/SPS days, January 2005 CCC interior design issues  Lighting  7x11 direct/indirect (20%-80%) from ceiling provide background level of 200+ Lux  Task lighting at workstation level  Acoustics  Ceiling, walls, floor & furniture acoustically treated  Acoustic screens behind consoles  RT<0.6s  Interior decoration  3 Harmonious colour schemes from CCD  4 th chosen by IDOC

R. Bailey, PS/SPS days, January 2005 CCC interior design - final Mike Clark CCD

R. Bailey, PS/SPS days, January 2005 Consoles specification - final

R. Bailey, PS/SPS days, January 2005 Procurement; 4 firms invited to tender

R. Bailey, PS/SPS days, January 2005 Dates and schedules End of SPS run 2004 Building ready end 10/2005 CCC operational 02/

R. Bailey, PS/SPS days, January 2005 Staff evolution for AB/OP

R. Bailey, PS/SPS days, January 2005 Outstanding issues  Standard computers for all consoles  Different OS  2006 start-up with existing 2004 applications  When to converge ?  4 different Access systems  SPS & EA as is  PS panels emulated  LHC new system  When to converge ?  Communications in/out/within CCC  Fast analog signals in CCC  Parking space  Office space

R. Bailey, PS/SPS days, January 2005 The bottom line  Restart all machines from CCC in 2006  PS and SPS off ~ 18 months  Remote operation  Long checkout periods  In case CCC is late  Keep MCR active  Access systems ?  2006 is going to be fun!