N. BlaskovicFONT Meeting1 ATF October 2014 shift plan N. Blaskovic.

Slides:



Advertisements
Similar presentations
ATF2: Status Update Glenn Christian (on behalf of FONT group) 10 th ATF Project Meeting.
Advertisements

P.N. Burrows ATF2 Project Meeting, KEK, 14/12/091 Feedback On Nanosecond Timescales Philip Burrows Glenn Christian Hamid Dabiri Khah Javier Resta Lopez.
N. BlaskovicFONT Meeting1 Preliminary resolution study results N. Blaskovic.
N. BlaskovicFONT Meeting1 November 2013 week 2 FONT shift summary N. Blaskovic.
FONT Meeting1 Calibrations over IP LO power scan N. Blaskovic.
ATF2 FB/FF layout Javier Resta Lopez (JAI, Oxford University) for the FONT project group FONT meeting January 11, 2007.
Some simulation results on FF/FB system for ATF2 Javier Resta Lopez (JAI, Oxford University) for the FONT project group FONT meeting January 25, 2008.
FONT Meeting1 Waveforms with and without BPFs N. Blaskovic.
-brief report of October runs and some inputs for the Nov/Dec planning – Nobuhiro Terunuma, KEK, ATF ATF session on LCWS13, Tokyo Univ., Nov. 13, 2013.
Analysis of ATF EXT/FF Orbit Jitter and extrapolation to IP (Data of ) ATF2 Project Meeting K. Kubo.
Progress towards nanometre-level beam stabilisation at ATF2 N. Blaskovic, D. R. Bett, P. N. Burrows, G. B. Christian, C. Perry John Adams Institute, University.
N. BlaskovicFONT Meeting1 ATF February-March 2014 shift plan N. Blaskovic.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
N. BlaskovicFONT Meeting1 FONT5 board #2 DAC tests N. Blaskovic.
High Resolution Cavity BPM for ILC final focal system (IP-BPM) ILC2007/LCWS 2007 BDS, 2007/6/1 The University of Tokyo, KEK, Tohoku Gakuin University,
Discussion on Milestone and schedule Toshiyuki Okugi ATF2 commissioning meeting 1 / 7 / 2009.
ATF2 Javier Resta Lopez (JAI, Oxford University) for the FONT project group 5th ATF2 project meeting, KEK December 19-21, 2007.
Personal strategy for ATF2 beam operation in 2009 Toshiyuki OKUGI 2009 / 7 /22 ATF2 weekly meeting.
Status of ATF2 Cavity BPM Project Sep 29, 2005 Project Scope: Instrument both couplers ATF2 cavity BPM’s (35) Produce prototype for December cavity test.
1 FONT Results 2010 Philip Burrows Robert Apsimon, Doug Bett, Glenn Christian Michael Davis, Colin Perry, Javier Resta Lopez John Adams Institute Oxford.
Analogue BPM data analysis Calibration & resolution results.
FJPPL-FKPPL Workshop on ATF21 FONT digitisation studies of IP BPMs D. Bett, N. Blaskovic, P. Burrows, G. Christian, M. Davis, Y. I. Kim, C. Perry John.
Feedback On Nanosecond Timescales (FONT): Robert Apsimon, Philip Burrows, Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Davide Gamba,
Development of a Low-latency, High-precision, Intra-train Beam Feedback System Based on Cavity Beam Position Monitors N. Blaskovic Kraljevic, D. R. Bett,
IP BPM Shift Report FONT Meeting: 22 December 2014 Talitha Bromwich.
1 FONT R&D status Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford University.
Philip Burrows ALCPG11, Eugene 21/03/111 Performance of FONT at ATF2 Philip Burrows John Adams Institute Oxford University.
1 FONT IP Feedback System Implications of increase of L* Philip Burrows John Adams Institute Oxford University.
FONT Hardware Processing electronics and current beam tests Stephen Molloy Queen Mary, University of London.
FONT Meeting1 Charge normalisation and IP LO power scan N. Blaskovic.
Philip Burrows ATF2 project meeting 14/1/111 Plans for ATF2 IP Feedback Philip Burrows, Colin Perry John Adams Institute Oxford University.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
Feedback On Nanosecond Timescales (FONT) Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis**, Colin Perry.
IPBPM issues (Limitation of resolution) Siwon Jang (KNU)
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John.
ATF2 Tuning Summary Nov & Dec 2010 Glen White, SLAC 11 th ATF2 Project Meeting, SLAC Jan
ATF2: Summary of Scheduling Strategy Session Grahame Blair Feedback and Feedforward systems Fast Kicker for ILC bunch train structure Laser-wire Shintake.
FONT Meeting1 3-BPM resolution with digital filtering N. Blaskovic.
CALIBRATIONS IPBPM FILTER TESTS Siwon Jang Hoyeong Jeong Glenn Christian Talitha Bromwich Friday, 1 May Talitha Bromwich, FONT Group Meeting.
N. BlaskovicFONT Meeting1 ATF November 2013 shift plan N. Blaskovic.
Philip Burrows ATF2 project meeting 1/07/101 Plans for ATF2 IP Feedback Philip Burrows, Colin Perry John Adams Institute Oxford University.
NumberMikey Davis02 November 2012 Roundup of ATF Trip.
Jitter Monitor – Overview and Status Report Glenn Christian, Alexander Kalinin 30 May 2005.
FONT GROUP MEETING ATF JUNE SUMMARY Neven & Talitha Talitha Bromwich - Friday, 26 June 2015.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John.
1 IP FB tests at ATF2 Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford.
FJPPL-FKPPL ATF2 Workshop Jitter studies March 18, 2014 Beam jitter localization and identification at ATF2 Marcin Patecki Jürgen Pfingstner 18 th of March.
Overview of progress at FONT Neven Blaskovic TMD technologies CASE student John Adams Institute Oxford University.
ATF Meeting1 IP BPM studies with Honda’s electronics Neven Blaskovic with Wunghoa Park Oscar Blanco Alexis Gamelin N. Blaskovic.
1/33Mikey Davis24 January 2013 Review of 23 rd of January Shift.
1 FONT IP FB Philip Burrows Robert Apsimon, Doug Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Colin Perry John Adams Institute Oxford University.
N. BlaskovicFONT Meeting1 Feedforward runs N. Blaskovic.
N. Blaskovic, T. Bromwich, R. Ramjiawan
Roundup of Week at ATF Mikey Davis 19 April /26.
Fast Beam Collision Feedbacks for luminosity optimisation at next-generation lepton colliders Philip Burrows John Adams Institute Oxford University.
Siwon Jang Hoyeong Jeong Glenn Christian Talitha Bromwich
Further Tracking Studies and March Trip Plan
Resolution Study T. Bromwich FONT 8 September 2017.
N. Blaskovic, T. Bromwich, P. Burrows, G. Christian, C. Perry, R
Feedforward runs N. Blaskovic N. Blaskovic FONT Meeting.
ATF cable plan N. Blaskovic N. Blaskovic FONT Meeting.
Analysis of March ATF Run
N. Blaskovic, T. Bromwich & G. Christian
ATF Shift Plans Rebecca, Talitha 08/09/2017 Friday, 08 September 2017
March Trip Plan Mikey Davis 01 March /7.
Revised ATF Shift Plans
Progress towards nanometre beam stabilisation at ATF2
Progress towards nanometre level beam stabilisation
Status of Phase Feedforward Tests
FONT stripline BPM resolution
Presentation transcript:

N. BlaskovicFONT Meeting1 ATF October 2014 shift plan N. Blaskovic

Introduction Plan assumes existing IP BPMs with Honda’s electronics Two parts: –Estimating Honda’s electronics system noise by using 2 processors on one BPM –Performance of IPB and IPC with waist at IP FONT Meeting2N. Blaskovic

Shifts FONT team at ATF: –Glenn ChristianTue 21 st Oct – Sun 26 th Oct –Neven BlaskovicSun 19 th Oct – Sat 1 st Nov We have been allocated 3½ shifts for the first week: –Wednesday owl(0100–0900) –Thursday owl(0100–0900) –Friday owl and ½ day(0100–1300) FONT Meeting3N. Blaskovic

2-on-1 resolution study Use 2 processors on one BPM to estimate resolution limit due to electronics noise (Inoue et al., 2008): FONT Meeting4N. Blaskovic

2-on-1 resolution study Shift time would be required to: –Calibrate with beam waist on BPM –Get 2-on-1 resolution data on and off-waist –Get 2-on-1 resolution data vs. mover position –Study resolution vs. attenuation –Permute pairs of electronics –Repeat but have a common Honda 1 st stage and then split into two Honda 2 nd stages FONT Meeting5N. Blaskovic

2-on-1 resolution study Study requires single FONT5 board for local digitisation at IP Study also requires IP BPM mover control FONT Meeting6N. Blaskovic

IPB and IPC resolution study With waist at nominal IP, propagation of upstream P2 and P3 positions gives –8 um jitter at IPB & IPC; 9 nm jitter at IP –~100 % position correlation of IPB to IPC FONT Meeting7N. Blaskovic IPB IPC N. Blaskovic

FONT Meeting8N. Blaskovic (IPC) (IPB) N. Blaskovic

IPB and IPC resolution study Parasitic study with beam waist at IP: –Centre IPB and IPC around beam –Measure jitter at IPB and IPC vs. attenuation –Estimate system resolution vs. attenuation (given ~100% IPB-to-IPC position correlation, IPB & IPC are ~ measurements of the same) –Assess limitation of dynamic range Shift time would be required to: –Calibrate with beam waist on each BPM FONT Meeting9N. Blaskovic

IPB and IPC resolution study Digitise: –Upstream stripline BPMs P2 and P3 –IP BPMs IPB and IPC Study requires IP BPM mover control Study preferentially performed with tuned beam of known spot size FONT Meeting10N. Blaskovic

Hardware Hardware to be taken to ATF: –FONT5 board #1 –n FONT5A boards –2 ZPUL kicker amplifiers –USB device server –Variable attenuators and controller box (?) FONT Meeting11N. Blaskovic

Summary Study with 2 processors on one BPM –Requires shift time –Tuned beam not critical Performance of IPB & IPC with waist at IP –Mostly parasitic if beam within mover range –Tuned beam preferred FONT Meeting12N. Blaskovic