1 News and Miscellaneous UPO Apr 05 2013 Didier Contardo, Jeff Spalding News from Oct. RRB HL-LHC Pile-up for simulation Upcoming events: DESY week – Taipei.

Slides:



Advertisements
Similar presentations
Mandate of Parameter and Lay out Committee (PLC) of the HL-LHC project L. Rossi HL-LHC PC.
Advertisements

P. Allport, D. Contardo Workshop organization matters
1 News and Miscellaneous UPO May Didier Contardo, Jeff Spalding -Phase 2 Scope and Cost exercise.
O. Buchmueller, Imperial College, W. Smith, U. Wisconsin, UPO Meeting, July 6, 2012 Trigger Performance and Strategy Working Group Trigger Performance.
Upgrading the CMS simulation and reconstruction David J Lange LLNL April CHEP 2015D. Lange.
1 DOE Annual Review -June 15,2005 An Overview of Conventional Facilities (Civil Construction) U. S. ILC Civil studies and cost issues for Snowmass Fred.
ECFA Preparatory Group "Shutdown constraints and radiation and activation effects”. W. Zeuner, W. Riegler, R. Lindner, B. Di Girolamo, G. Corti, C. Schaeffer,
February 19th 2009AlbaNova Instrumentation Seminar1 Christian Bohm Instrumentation Physics, SU Upgrading the ATLAS detector Overview Motivation The current.
F. Gianotti, AFP kick-off meeting, 20/9/2012 Recommendations for the next steps Reports from the:  Technical Review A.Henriques  Physics Review R.Hawkings.
CBM Constitution (By-law) Mihai Petrovici, CBM-Meeting, GSI-Darmstadt, October 5-7, Short history - Why do we need a Constitution ? - Present draft.
1 News and Miscellaneous UPO Mar Didier Contardo, Jeff Spalding o General news o ESP and Manpower needs o Reviews o Document to RRB o DESY week.
M. Gilchriese ATLAS Upgrade Introduction January 2008.
Roger Rusack – The University of Minnesota 1.
ATLAS muon endcap 1 layer of tracking chambers (MDT) 3 layers of trigger chambers (TGC) which we are working on ATLAS TGC installation and commissioning.
Executive Session Director’s CD-1 Review of the Mu2e Project April 3, 2012 Elaine McCluskey.
Octobre MPI Munich FCAL Workshop in Munich W. Lohmann, DESY The 14 mrad X-angle, two IPs The push-pull option The next calendar dates Where we are.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting.
Plan. 12/05/ Who are we? PM (Project Management and Resource Planning) – APT – IMPACT – PPTEU2 – Plan LS1 – 2012 –…–… Plan V2 – From LS1 to LS2.
Recent news from CLIC C&S WG and CLIC-ILC WG on General Issues Ph. Lebrun CLIC Project Meeting 1 June 2011.
1 News and Miscellaneous UPO Mar Didier Contardo, Jeff Spalding o General news o ESP and Manpower needs o Cost scale for phase 2 o June Upgrade.
Director’s Review 5/5/03 Spalding DRAFT RLS 1 Project Planning  Documentation to DOE June 1  DOE Review ~July 22 Documents Summary Project Overview,
Philip Burrows SiD meeting, Chicago 15/11/081 Progress on the LoI Philip Burrows John Adams Institute Oxford University Thanks to: Hiro Aihara, Mark Oreglia.
25-Oct-2013 Upgrades Week “Muon plans for the Phase 2 TP” J. Hauser, UCLA  Phase 2 muon plans (presented at ECFA),  What’s new since Upgrade Week  New.
ECFA European Committee for Future Accelerators Report from the chairman M. Krammer HEPHY, Vienna, Austria July 24, 2014RECFA DESY1.
Exec/Board Paris February 2008 WP3.1 Infrastructure Roadmap: Progress Report.
IEEE Session # 3 Closing Plenary Mark Klerer, Jerry Upton Vice-Chairs 24 July 2004 IEEE /13r1.
1 13 June 2011 ALICE ITS Upgrade Proposal Work organization  Document scope  Timeline  Editorial board and work organization  Status (next presentations)
February, INP PAN FCAL Workshop in Cracow W. Lohmann, DESY The BCD (Baseline Configuration Document) The next calendar dates Where we are with FCAL.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
Upgrade Result Approval: CMS and Tracker Frank and Andrea 21/5/14Pixel phase 1 MB1.
1 ECFA HL-LHC Experiments Workshop Aix-les-Bains Oct. 1-3 D. Contardo, P. Allport CERN June 10 Status from Preparatory Groups and Discussion of Agenda.
News Y2K June 25, Summary of June 12 Face-to-Face Meeting.
On S1Global Writeup S1G Writeup Meeting Nobu Toge 1.
Doc.: IEEE /1394r0 Submission November 2008 Jose Puthenkulam (Intel)Slide 1 Summary of m Development Process Date: Authors:
General Muon Meeting, 03-March-2014 Jay Hauser “Update on Phase 2 muon Technical Proposal”  Recent developments:  ME0 inserted into HGCAL as for other.
News and Miscellaneous UPO Jan Didier Contardo, Jeff Spalding 1 UPO Jan Workshop on Upgrade simulations in 2013 (Jan. 17/18) -ESP in.
Costing review Extract from slide of Philippe: The Panel was impressed by the quality of the presentations and degree of detail to which the value.
ECFA European Committee for Future Accelerators Report from the chairman M. Krammer HEPHY, Vienna, Austria May 4, 20131RECFA Copenhagen.
ECFA - European Commitee for Future Accelerators Tatsuya Nakada – EPFL, Switzerland– prepared for CERN September Council presented by.
1 HL-LHC Experiment ECFA Workshop, Aix-les-Bains Oct Preparatory group meeting May P. Allport, D. Contardo Steering committee of the workshop:
News and Misc Didier Contardo, Jeff Spalding UPO 3/2/12 1 UPO 2/2/12 o The MM, cost estimates and reporting o Milestones and scheduling o Chamonix Meeting.
1 Towards Phase 2 TP releases 2013 Didier Contardo, Jeff Spalding Status of current simulations studies and ongoing issues Needs for TP preparation.
30 April 2014FCC-ee Physics Coordination meeting1 FCC-- ee coordination meeting 12 Nov 2015 Brief news.
Project X Collaboration Plan Steve Holmes Accelerator Advisory Committee Meeting May 6-8, 2008.
CLIC 23 rd Project Meeting: news and updates Philip Burrows John Adams Institute Oxford University 1.
W. Smith, U. Wisconsin, Upgrade MB, Sept. 9, 2011 Proposal Reviews - 1 Upgrade Peer Review Report Wesley H. Smith U. Wisconsin CMS Upgrade Peer Review.
News and Miscellaneous UPO Nov Didier Contardo, Jeff Spalding 1 UPO Nov L1-Trigger TDRs -Upcoming Proposals for Phase 1 -CMS week Dec.
R&D per l’LHC upgrade di fase 2 1 Iniziative verso la fase 2 : USA: Snowmass, (Jul 29 - Aug 6, 2013) HL-LHC Experiment ECFA Workshop, Aix-les-Bains Oct.
1 ECFA HL-LHC Experiments Workshop Aix-les-Bains Oct. 1-3 D. Contardo, P. Allport CERN 3 rd September ECFA steering committee and preparatory group meeting.
1 ECFA HL-LHC Experiments Workshop Aix-les-Bains Oct. 1-3 D. Contardo, P. Allport CERN June 10 Status from Preparatory Groups and Discussion of Agenda.
Introduction to the Electronics and Readout Systems Session Ph. Farthouat, CERN.
27-Jan-2014 Upgrade Steering Group “Update on Phase 2 TP - muons” J. Hauser, UCLA  Update on progress for TP:  2 slides follow to be shown at USG02 (Upgrade.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
K. Long, 25 June, 2016 IDR: structure and overall timeline: Slides are to introduce discussion of how we prepare IDR. Propose to revise slides as we discuss.
News and Miscellaneous Didier Contardo, Jeff Spalding UPO August 03/ UPO 08/03/12.
29 October 2015 B. Di Girolamo. B. Di Girolamo – Collider-Experiments Day – 5 th HiLumi Annual Meeting 2 Collider-Experiments Interactions There is a.
TDR and planning session
News and Misc UPO Meeting Jan 16, 2012
UPO meeting Nov. 29, 2013 D. Contardo, J. Spalding News
Status of the Planning Working Group’s (PWG) Efforts
Ralph Aßmann (DESY) 2nd collaboration week November 24th, 2017, Lisbon
Process of the 2nd update of the European Strategy for Particle Physics FCC week, 29 May 2017, Berlin Sijbrand de Jong, President of the CERN Council (slides.
Francesco Forti University and INFN, Pisa
The DBD: Outline and Scope
Preparations for a Lehman Review
The Two Most Common Types of Contemporary Planning Techniques
<month year> doc.: IEEE ptc November 2012
The Two Most Common Types of Contemporary Planning Techniques
Presentation transcript:

1 News and Miscellaneous UPO Apr Didier Contardo, Jeff Spalding News from Oct. RRB HL-LHC Pile-up for simulation Upcoming events: DESY week – Taipei week - ECFA workshop Upgrade Conference committee and editorial board

News from Oct. RRB o The process followed by CMS to establish the phase 2 scope and cost estimate in a Technical Proposal by end of 2014 was discussed in details and well received o We are however expected to report on the progress at the Oct. RRB – This involves writing a document describing development of the scope for phase 2, including Motivation and advantage in physics performance Cost scale Size of effort / resources needed Impact on shutdown plan/duration – This will be a relatively brief document, not an LoI, it anticipates the schedule of our studies targeting decision on scope early next year – The timescale for the document is presentation to the collaboration at the end of July (MB/FB) then CWR and approval by CB during Sept. week in Taipei. We need to define baseline scenarios (2?) and options during the DESY week converging on the following questions: – Detectors that need replacement (when - staging?) – Inter-relationship between tracker-trigger-calorimeter electronics upgrades – Requirements on granularity and resolution for calorimetry – Motivation of options: extended coverage in tracking, calorimetry, muon systems – Motivation of options: high precision timing – Eliminating unrealistic scenarios with respect to criteria outlined above o We are preparing a framework for preparing the document, with the cost exercise 2

HL-LHC Pile-up for simulation o Common CMS and Atlas note in preparation, first draft released – Summary of elastic/inelastic/total cross section measurements  81±3 mb at 14TeV – Nominal HL-LHC parameters  2808 bunches (could be 2760) Hz/cm 2 constant – Bunch luminosity fluctuation from current beams  8% RMS  Including uncertainties expect PU of 115 to 140  Proposal to simulate at conservative value of 140 to harmonize with ATLAS (agree at XEB) – investigate performance degradation at PU 200 ( Hz/cm 2 ) 3

Upcoming events o Upgrade week at DESY Monday-Friday June – Finalizing agenda and set of topics to be addressed Need to define list of presentations and name of speakers – Do not forget to register – Do not forget Poster session conferences/conferences/conf_display.aspx?cid= conferences/conferences/conf_display.aspx?cid=1160 o ECFA workshop Oct. 1 – 3 – Preparatory group with 4 experiments being formed CMS contributors: Physics goals and reach: C. Hill, M. Klute, I. Melzer-Pellmann Tracking devices: J. Christiansen, F. Vasey, S. Mersi Calorimetry: P. De Barbaro, D. Barney, M. Mannelli Muon systems: A. Safonov, M. Abbrescia, K. Hoepfner/P. Checchia Trigger/DAQ/Offline/Computing: W. Smith, C. Schwick, I. Fisk, P. Elmer Electronics and read-out systems: M. Hansen Long Shutdown constraints and radiation effects: W. Zeuner, C. Schaeffer Accelerator and Experiment interface: W. Zeuner, M. Chamizo Llatas (CMS) o CMS week in Taipei Monday-Friday SEPT – Upgrade plenary dedicated to presentation of material for the ECFA workshop 4

Upgrade conference - editorial committee o Need arising to approve conference material – Two main categories of presentations in CINCO under general Upgrade or under Projects with overlap and sometimes wrong assignment Proposal to set-up a small common committee to approve abstracts and presentations based on current projects conference committee members plus UC, WG and Cross- coordination representatives 5