EuCARD WP 7 – High Field Magnets Task 7.2.1 – Radiation certification Status report EuCARD WP 7 – High Field Magnets Task 2 – Support studies Task 7.2.1.

Slides:



Advertisements
Similar presentations
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Advertisements

Liquid H 2 Absorber Production Contents (1)MICE Absorber Status (2)MICE Absorber Modification (3)Plan/Schedule (4)Summary MICE CM-23 in HARBIN Shigeru.
Coupling Coil Test Facility Update Ruben Carcagno Fermilab September 20, 2012.
Status of the AFC at RAL Tom Bradshaw John Cobb Wing Lau Matt Hills Elwyn Baynham Mike Courthold Victoria Bayliss MICE Project Board 28 th June 2011.
Spectrometer Solenoid Design and Procurement Review Steve Virostek Mike Green Mike Zisman Lawrence Berkeley National Lab MICE Collaboration Meeting October.
Spectrometer Solenoid Report and Coupling Coil Update Michael S. Zisman MICE Operations Manager Center for Beam Physics Lawrence Berkeley National Laboratory.
Spectrometer Solenoid Update Steve Virostek - LBNL MICE Video Conference #145 December 15, 2011.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM24 at RAL June 1, 2009.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
SLHC-PP – WP7 Critical Components for Injector Upgrade Plasma Generator – CERN, DESY, STFC-RAL Linac4 2MHz RF source Thermal Modeling Gas Measurement and.
WUT Experience in Measurements of the Heat Transfer Thought SC Cable Electrical Insulation Jaroslaw Polinski*, Maciej Chorowski*, Michal Strychalski*,
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
Status and Integration of the Spectrometer Solenoid Magnets Steve Virostek Lawrence Berkeley National Lab MICE RAL June 15, 2007.
Workshop on Beam losses, heat deposition and quench levels for LHC magnets, Geneva, 3-4 March 2005 Liquid helium heat transfer in superconducting cable.
MQXF Cold-mass Assembly and Cryostating H. Prin, D. Duarte Ramos, P. Ferracin, P. Fessia 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014.
EuCARD WP 7 – High Field Magnets Task 7.2 – Support Study Status report EuCARD WP 7 – High Field Magnets Task 2 – Support studies Task 7.2 – Support Study.
HL-LHC/LARP, QXF Test Facility Workshop– R. Carcagno QXF Test Requirements Ruben Carcagno BNL Workshop December 17, 2013.
CARE-HHH-AMT Workshop on Heat Generation & Transfer in Superconducting Magnets Paris, November 190th Experience at CEA Experience at CEA Jaroslaw.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2 WP-10 Status.
Arnaud Vande Craen (TE-MSC) 27/02/20131 EUCARD : ESAC Review – CEA Saclay.
1 Numerical study of the thermal behavior of an Nb 3 Sn high field magnet in He II Slawomir PIETROWICZ, Bertrand BAUDOUY CEA Saclay Irfu, SACM Gif-sur-Yvette.
WA104 Cryogenics Design Status David Montanari / Johan Bremer May 21, 2015 Rev. 1.
Irradiation of insulators for EuCARD Workshop on Accelerator Magnet, Superconductor, Design and Optimization CERN Maciej Chorowski, Jaroslaw.
S. Caspi, LBNL HQ Progress and Schedule Shlomo Caspi LBNL LARP Collaboration Meeting – CM13 Port Jefferson November 4-6, 2009.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM25 at RAL November 6, 2009.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
HFM-EuCARD, GdR, 14 October EuCARD magnet development Gijs de Rijk CERN EUCARD - HE-LHC'10 ACCNET MINI-WORKSHOP ON A “HIGH-ENERGY LHC” Malta,
MICE Coupling Coil Testing at Fermilab All Experimenters Meeting Ruben Carcagno March 19, R. Carcagno - MICE CC Testing at Fermilab3/19/2012.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab NFMCC at LBNL January 25, 2009.
MICE/MuCool Coupling Magnets to 22 ICST/HIT MICE/Muool Coupling Magnets Progress Li Wang for MICE Group Institute of Cryogenics.
MICE RF Coupling Coil Magnets Update Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory October 6, 2010 Sofia, Bulgaria.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
A. BallarinoLASA, Milano,18/09/2012 High-Tc Superconducting Link Status of Task 7.5 FP7 Meeting at LASA-Milano A.Ballarino, CERN for the Task 7.5 Collaboration.
A. BallarinoEucard, 8 th WP7 HFM Annual MeetingWarsaw,24/04/2012 High-Tc Superconducting Link Status of Task 7.5 Eucard 2012, 8 th WP7 HFM Collaboration.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Video Conference 120 May 7, 2009.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
Mike Struik / LHC-CRI INSTRUMENTATION FEEDTHROUGH SYSTEM FOR LHC MACHINE ARC QUADRUPOLE MAGNETS. 123rd LHC Vacuum Design Meeting 19 April 1999.
MICE/MuCool Coupling Magnets ICST/HIT Progress and Schedule for the MICE/MuCool Coupling Coil Project HIT MICE CC Project Group.
EuCARD WP 7 – High Field Magnets Task 7.2 Status report EuCARD WP 7 – High Field Magnets Task 2 – Support studies Task 7.2 Status report EuCARD HFM collaboration.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
Status of the Spanish contribution to CTF3 L. García-Tabarés, F. ToralCERN, 17/9/2006.
CERN/CEA Collaboration agreement No. KE2275/TE WP5 – HTS insert Meeting 04/09/2015.
17-18 December 2013 LARP VTF Workshop BNL Proposal 1 A.Marone
KEK-CEA Superconducting Magnet Co-operation Program The FJPPL workshop LAPP, Annecy-Le-Vieux (France), June LHC-3 Superconducting Magnets.
J. Polinski, B. Baudouy -The NED heat transfer program at CEA CEA Saclay, January 11th NED heat transfer program at CEA NED heat transfer program.
MICE CC Magnet Cryostat Design Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE CC Cryostat Design Review LBNL, February.
EuCARD WP 7 – High Field Magnets EuCARD WP 7 – High Field Magnets Task 2 – Support studies Status report after M6 EuCARD HFM collaboration meeting – CERN.
EuCARD WP 7 – High Field Magnets EuCARD WP 7 – High Field Magnets Aim and goals Mini Workshop of Accelerators Radiation Mini Workshop of Accelerators Radiation.
WBS 1-7 System Assembly & Installation John Voirin August 10-11, 2011.
Final Design Cryogenic and mechanical configurations
Cryogenic Safety- HSE seminar CERN,
CSP 25th November 2010 Technical agreement number 3: overview
MICE Meeting at RAL, Oct-23, 2005
HFM Test Station Main Cryostat
AEGIS Magnet System.
Teleconference ACS – FREIA 18th April 2017
Teleconference ACS – FREIA 10th May 2017
EuCARD WP 7 – High Field Magnets Task 2 – Support studies Task summary
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
Teleconference ACS – FREIA 17th October 2017
LARP Vertical Test Facility
Spectrometer Solenoid Fabrication Status and Schedule
HO Corrector Magnets: decapole test and future plans
Insert - dipole common issues
Cable and Strand test facility
Cryostat design Mechanical design: Thermal screens: Specifications:
Status of the PANDA Solenoid Magnet Production in BINP
Teleconference ACS – FREIA 20th February 2018
ILC Main Linac Superconducting Splittable Quadrupole
Teleconference ACS – FREIA 19th June 2017
Presentation transcript:

EuCARD WP 7 – High Field Magnets Task – Radiation certification Status report EuCARD WP 7 – High Field Magnets Task 2 – Support studies Task – Radiation certification Status report Status Update Meeting – Maciej Chorowski, Jaroslaw Polinski, Piotr Bogdan Faculty of Mechanical and Power Engineering

2 Outline Task plan Irradiation cryostat status Sample irradiation time scale Task summary

3 Task plan Achieved Oct 2010 „Sample test map” report Achieved SOLTAN Institute Warsaw has been selected Achieved Oct 2010 „Sample test map” report

4 Conceptual design of the irradiation cryostat

5 I rradiation cryostat Level regulation system Level meter350W heater

6 I rradiation cryostat Nitrogen transfer line Modified Nitrogen tank

7 Irradiation cryostat status Most of cryostat elements are fabricated and assembled Sample holder is under the production The design of inlet of electron gun need to be changed for new NCBJ gun design – new inlet is expected in week 42 The level regulation system test is foreseen for week 41

8 Irradiation time scale

9 Task Summary Irradiation cryostat – expected to be ready in week 42 Samples irradiation: Mid of Nov 2011 – August 2012 A formal agreement between PWR and TECHTRA for supply of irradiated materials (including irradiation) - signed in Oct 2011 Milestone (M24) „ Methodology for the certification of radiation resistance of coil insulation material” is expected in Oct 2011 Conceptual design of dewar and insert for the electrical tests – December 2011

10 Task plan Achieved Oct 2010 „Sample test map” report Achieved SOLTAN Institute Warsaw has been selected To be achieved within next 2 weeks Achieved Oct 2010 „Sample test map” report Start is delayed by 6 months, but finish is expected to be on time

EuCARD WP 7 – High Field Magnets Task – Thermal models Status Raport EuCARD WP 7 – High Field Magnets Task 2 – Support studies Task – Thermal models Status Raport EuCard-WP7-HFM Collaboration Meeting – – CEA Grenoble Jaroslaw Polinski, Maciej Chorowski Faculty of Mechanical and Power Engineering

12 Outline Task plan CEA Saclay thermal tests status CEA Saclay thermal modeling status Insulation test sample production at RAL PWR HeII cryostat status Task summary

13 Task plan Achieved Oct 2010 „Sample test map” report Achieved on time

14 CEA Saclay thermal tests status Unirradiated TGPAP - DETD and Cyanate Ester insulation thermal conductivity and Kapitza resistance measurement in HeII condition have been finished. To continue the work the irradiated samples have to be provided by PWR Development of the measurement rig for thermal conductivity and heat capacity in 4-300K temperature range is in the last testing phase where a known aluminum alloy is tested

15 CEA Saclay thermal modeling status Steady-state calculations and Quench simulations with the "conduction" model are finished Development of a simplified He II two-fluid model for the thermal calculation of the magnet. The results will be presented at The CHATS workshop in CERN next week Additional Deliverable (M30): “Superfluid helium transport model for the thermal design of the high field Fresca 2 magnet” is foreseen

16 Insulation test sample production at RAL RAL mix 71, RAL Mix 237 and Cyanate ester thermal and electrical laminates are produced and distributed to PWR and CEA Saclay Mechanical samples will be cut out from 0.5mm laminate to the 6 mm width Tensile Test specimens. Availability of up to 1kN Tensile Test facility at PWR Mech. Dep. is investigated LARP insulation laminates are not produced yet – all components are bought, the production can start on request

17 PWR HeII cryostat status Cryostat general view Cryostat parts in vacuum space

18 PWR HeII cryostat status Top view of the cryostat with wiring Insert Measurement vessel Instrumentation and DAQ electronic

19 PWR HeII cryostat status Measurement vesselTop cover of measurement vessel

20 PWR HeII cryostat status Sample holder center flanges Sample holder sample flanges Center flanges instrumentation Heaters T-sensor

21 PWR HeII cryostat status 4 sample holders in the measurement vessel

22 PWR HeII cryostat status Shock tests with LN2 have been done Leak tests at 4bar GHe have been done Instrumentation is installed Connection of instrumentation to DAQ system is done LabView program for cryostat operation is done 6 sample holders are instrumented 4 thickness of unirradiated 71 Mix samples are ready for thermal test The first cool-down with LHe is scheduled for week 43

23 Task Summary Thermal test of unirradiated Mix 71 in HeII conditions will be performed at PWR in week 43 A new Deliverable (M30) “Superfluid helium transport model for the thermal design of the high field Fresca 2 magnet” is foreseen and nearly completed Development of the measurement rig for thermal conductivity and heat capacity in 4-300K temperature range is in the last testing phase LARP insulation laminates production can start on request

24 Task plan Achieved Oct 2010 „Sample test map” report In progress 2 from 4 are done 3th will be done soon Achieved on time In progress, expected on time New Milestone achieved