Development Report Engineering Node August 2006

Slides:



Advertisements
Similar presentations
Configuration management
Advertisements

Technical update on ISO 9001:2015 Colin MacNee Duncan MacNee Limited
Transformations at GPO: An Update on the Government Printing Office's Future Digital System George Barnum Coalition for Networked Information December.
Graduate System for Management of Admissions, Alumni & Records Tracking (Grad SMAART) January 8, 2007 Office of Graduate Studies.
July 18, 2003SA, HRMS, FIN Unit Liaison Meeting1 Training Approach Project Initiative (TAPI) Update Frances Mueller Cathy Handyside July 18, 2003.
System Design/Implementation and Support for Build 2 PDS Management Council Face-to-Face Mountain View, CA Nov 30 - Dec 1, 2011 Sean Hardman.
Release & Deployment ITIL Version 3
This chapter is extracted from Sommerville’s slides. Text book chapter
Financials – Phase II Kick-Off Meeting September 11, 2008 Brenda Bolander, State Comptroller Michael Grisser, Project Manager.
Web Development Process Description
2-3 April 2009PDS MC Rapid-prototyping tools. 2-3 April 2009PDS MC Rapid-prototyping tools Legend: Gray – Existing tool effort; White – Proposed tool.
PDS4 Project Lifecycle Support for LADEE, MAVEN April 3, 2013.
ASPERA-3 April. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 4_25/ Page 1 Monthly Status Report Report due 4/25/01 Schedule statused.
PDS 2010 Project Update Dan Crichton MC Face-to-Face Washington DC March 25-26, 2010.
Geosciences Node Ed Guinness MC Face-to-Face Meeting Washington, DC March 27-28, 2012.
Update from the Data Integrity & Tracking WG Management Council F2F UCLA Los Angles, CA August 13-14, 2007
Planetary Science Archive PSA User Group Meeting #1 PSA UG #1  July 2 - 3, 2013  ESAC PSA Archiving Standards.
July 9, 2007 TPTF Meeting Texas Nodal Program Update Jerry Sullivan.
PDS4 and Build 5a Update Dan Crichton, Emily Law November
PDS Geosciences Node Page 1 Archiving Mars Mission Data Sets with the Planetary Data System Report to MEPAG Edward A. Guinness Dept. of Earth and Planetary.
Timeline for the oneM2M Partnership Project Timeline and Milestones [Joachim Koss, ETSI] Contribution to oneM2M plenary, 05 Mar 2012 Doc: Source: ETSI.
PDS4 Project Report PDS MC F2F Columbia, MD Dan Crichton April 2-3,
Atmospheres Node Report Reta Beebe Nancy Chanover Lyle Huber Lynn Neakrase Jim Murphy Irma Trejo Matias Roybal Shannon Rees.
Label Design Tool Management Council F2F Washington, D.C. November 29-30, 2006
Data Standards and Build 3b Plans Steve Hughes MC Face-to-Face UCLA, Los Angeles, CA November 28-29, 2012.
Lead from the front Texas Nodal 1 Registration Market Call June Data Collection Window Aug 14, 2009.
PDS M/C August 2012 PPI Node Report PDS Management Council August 28-29, 2012 R. J. Walker S. P. Joy T.A. King J. Mafi.
System Design and Deployment Status PDS Management Council Face-to-Face UCLA, Los Angeles, California November 28-29, 2012 Sean Hardman.
Validation Tool (VTool) PDS Management Council Meeting Washington, D.C. November 2006
Data Integrity Issues: How to Proceed? Engineering Node Elizabeth Rye August 3, 2006
Operations Report PDS Management Council Meeting Flagstaff, Arizona August 2006
Data Standards Development August 29, Topics 1.Current Status 2.What was delivered for Build 2c 3.How was IPDA supported 4.What mission support.
PDS Geosciences Node Page 1 Archive Status MRO and Phoenix Ed Guinness PDS Management Council August 13, 2007 Ed Guinness.
PDS Geosciences Node Page 1 Archiving LCROSS Ground Observation Data in the Planetary Data System Edward Guinness and Susan Slavney PDS Geosciences Node.
Software Development and Deployment PDS Management Council Face-to-Face Los Angeles, California August 26-27, 2014 Sean Hardman.
System/SDWG Update Management Council Face-to-Face Flagstaff, AZ August 22-23, 2011 Sean Hardman.
1 Chapter 12 Configuration management This chapter is extracted from Sommerville’s slides. Text book chapter 29 1.
Cassini Archive Tracking System (CATS) Report Engineering Node November 30, 2006
State of Georgia Release Management Training
Software Development and Deployment PDS Management Council Face-to-Face Berkeley, California November 18-19, 2014 Sean Hardman.
Small Bodies Node Ludmilla Kolokolova Carol Neese, Mike A’Hearn, Anne Raugh MC Face-to-Face Meeting Westwood, California 26,27 August 2014.
Physical Media WG Update November 30, Fall 2006 WG Status Initial technology plan Use Cases Decision Matrix Media Testing NMSU Website Physical.
PDS4 Demonstration Management Council Face-to-Face Flagstaff, AZ August 22-23, 2011 Sean Hardman.
Data Integrity Management Council F2F Washington, D.C. November 29-30, 2006
PDS4 Build 3b System Readiness PDS Management Council Face-to-Face Columbia, Maryland April 2-3, 2013 Sean Hardman.
Assessment of Build 1d PDS4 Standards Reta Beebe Dan Crichton.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
Tools Report Engineering Node March 2007
PDS4 Deployment Planning (Discussion) PDS MC F2F Columbia, Maryland Dan Crichton August 28,
PDS4 Project Report PDS MC F2F UCLA Dan Crichton November 28,
PDS4 Project Report PDS MC F2F University of Maryland Dan Crichton March 27,
IEEE /r5 Submission November 2008 John Notor, Cadence Design Systems, Inc.Slide 1 IEEE IMT-Advanced Review Process Date:
Baseline The baseline at July Previously there was a lack of consistency for: Pathways into specialist clinics; Policies, procedures and guidelines.
International Planetary Data Alliance Registry Project Update September 16, 2011.
Page 1 Enterprise Data Warehouse Project Executive: Barbara Chmielewski Project Manager: Anita Sharma.
IPDA Registry Definitions Project Dan Crichton Pedro Osuna Alain Sarkissian.
Tools Report Engineering Node August 2007
IPDA Standards Identification Project - Report B Gopala Krishna Elizabeth Rye Dan Crichton Steve Hughes Dave Heather Navita Thakkar.
Power of Choice (PoC) Program Overview
Jan 2016 Solar Lunar Data.
<workgroup name>
IPDA PDS4 Report PDS Team July 2015.
Banner Project Update for Division Deans
PROGRAM CONSULTATIVE FORUM Meeting pack
CIM Model Manager Report

Power of Choice (PoC) Program Overview
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec ITEM 1 ITEM 2 ITEM 3
IEEE IMT-Advanced Review Process
IEEE P Wireless RANs Date:
Presentation transcript:

Development Report Engineering Node August

3 August 2006Development Report2 Topics Validation Tool Cassini Archive Tracking System (CATS) NSSDC Interface IPDA Cross-Catalog Search Prototype

Validation Tool

3 August 2006Development Report4 Accomplishments Requirements Review (Feb 2006) –Reviewed version 1.1 of the Requirements Document resulting in 66 Requests for Action. Reported status and plan to MC (Mar 2006) –Approval to move forward with level 3 requirement approved. Released version 1.2 of the Requirements Document (Apr 2006) –Resulted in 22 more RFAs. Requirements Status and Preliminary Design Telecon (Jun 2006) –Issues involving the requirements were presented. –The meeting resulted in 11 action items. External Code Walk-through (Jun 2006) –Several general comments and suggestions were offered by the review board as well as over 50 specific comments regarding the source code. Status and Beta-Test Process Telecon (Jul 2006) –Presented the test approach and plan for the renamed Alpha Test. –The meeting resulted in 8 action items. Released version 1.3 of the Requirements Document (Jul 2006) –Waiting for comments.

3 August 2006Development Report5 Requirements Status Version 1.3 of the Validation Tool Requirements document was distributed to the PDS Tech Staff on July 25, RFA Status Summary (88 Total) –16 Open Related to data object validation. –39 Addressed Incorporated into version 1.3 of the document. –03 Tabled Issues to be addressed at a later date. –30 ClosedFinally put to bed. Status Legend –OpenAn action has yet to be defined. –AddressedAn action for the RFA has been defined but not yet accepted by the author. –TabledWaiting on some other milestone before the RFA can be addressed. –ClosedThe action defined for the RFA was accepted by the author.

3 August 2006Development Report6 Outstanding Action Items June 1 Telecon (Requirements Status and Preliminary Design) 5. Command-Line Options (All Node Tech Leads; due 21-Jul-2006) Nodes will send comments on the command-line options and their preferred default state. EN will distribute the summary. 7. Release Matrix (Hardman; due 28-Jul-2006) EN will prepare a matrix detailing the requirements/capabilities targeted for the first release of the Validation Tool. 8. Label Specific Rules (Hardman; due 21-Jul-2006) EN will send a list of label specific rules to the nodes defining the rules that are included in releases of the validation tool. 9. Sample Reports (Hardman; due 28-Jul-2006) EN will send out sample reports to the nodes for review. 11. Data Object Validation (Hardman; due 28-Jul-2006) EN will provide a list of initial data objects that will be supported by the validation tool. July 13 Telecon (Status and Beta-Test Process) –All action items have been completed except for #1, which addresses the action items from the previous telecon (listed above).

3 August 2006Development Report7 Alpha Test Release Release of the Validation Tool was made available to the Atmospheres, Geosciences and PPI Nodes for alpha testing. Intent of the alpha and beta testing phases –Get the tool in the hands of the users early on in development –Validate tool direction and testing strategy –Provide opportunity for the Nodes to submit test cases for the tool In conjunction with this release is the release of the Next Generation Tools web page. – –This web page contains links to all of the documentation pertaining to the definition, design, development and test of the Validation Tool to date.

3 August 2006Development Report8

3 August 2006Development Report9 Plan Alpha Test (Aug 1 - Aug 18, 2006) –Atmospheres, Geosciences and PPI Alpha Test Status Telecon (The week of Aug 21, 2006) –Present the results of the first phase of testing. Beta Test (Aug 28 - Sept 15, 2006) –Imaging, Rings and Small Bodies Post-Beta Test Telecon (The week of Sept 18, 2006) –Present the results of the second phase of testing. –Address and determine the readiness for operational delivery. Operational Delivery of version 1.0 (Oct 2006)

Cassini Archive Tracking System (CATS)

3 August 2006Development Report11 Accomplishments Installed a test instance of CATS at the EN. (Apr 2006) –The same version utilized by Cassini was installed. Configured the test instance with Phoenix policy. (May 2006) –Policy for the Phoenix mission was provided by S. Slavney. Members of Geosciences and the Phoenix Mission have performed testing. (Jun - Jul 2006) –Comments were provided by G. Furr and S. Slavney. –Minor issues with regard to the available reports and their content. –A couple of other minor nits were found. The impression is that the functionality currently provided by CATS is sufficient for use by the Phoenix Mission.

3 August 2006Development Report12 Plan Short-Term (Dec 2006) –Deploy an instance of CATS for Phoenix with minimal changes. Long-Term (?) –Evaluate CATS functionality and how it fits into PDS. –Map that functionality to PDS requirements (Level 3 and 4). –Consider expanding functionality to include tracking deliveries to NSSDC.

NSSDC Interface

3 August 2006Development Report14 Accomplishments Coordination Teleconferences (Jun, Jul, Aug, Sep, Oct 2005, Feb, Jul 2006) Initial version of the NSSDC MPGA software delivered, installed and tested at EN. (Aug Jan 2006) –Completed Test Plan tailored to award fee item. –Completed Test Phases I, II and III limited to 2-gigabyte volumes. –Completed test result capture and documentation. Follow on version of the MPGA software delivered, installed and tested at EN. (May 2006) –AIP packages of roughly 4 and 50 gigabytes in size were created verifying that the 2-gigabyte limit had been exceeded. Paper presented at the 2006 IEEE Mass Storage Systems and Technologies (MSST2006) conference. (May 2006) –“A Classification and Evaluation of Data Movement Technologies for the Delivery of Highly Voluminous Scientific Data Products”

3 August 2006Development Report15 Recent Telecon (Jul 2006) NSSDC MPGA Software Status –Not much progress since May since the main developer had been temporarily reassigned. –Work still needed for the attribute map, NSSDC ID determination and the pipeline. Action Items –Provide information to NSSDC regarding a scenario for how the PDS will utilize the MPGA software in an operational environment. (EN) –NSSDC and PDS EN will coordinate schedules in the next couple of weeks before the PDS MC meeting. (NSSDC and EN) –NSSDC will provide PDS EN with some information regarding Don Sawyer’s work on the attribute mapping. (NSSDC)

3 August 2006Development Report16 Plan Deliver a production ready version of the MPGA software (NSSDC - Oct 2006) –Incorporate PDS specific attributes in AIP generation –Incorporate determination of unique NSSDC storage identifiers –Simplify and/or provide interface for MPGA configuration and execution –Support DVD-sized (4 GB) and up to 50 gigabyte volumes. Receive and test the production ready version of the MPGA software (EN - Oct 2006) Test data transfers directly from Discipline Nodes to NSSDC (Nodes - Nov 2006) –Geosciences, Rings and Small Bodies have shown interest in participating. Prepare documentation for Distribution of Data to the NSSDC from PDS nodes (EN - Oct-Dec 2006) –Policy for electronic delivery to NSSDC. –PDS specific procedures for using the MPGA software. Obtain MC approval for release

IPDA Cross-Catalog Search Prototype

3 August 2006Development Report18 Background Simple prototype demonstrating a query capability across the PDS and ESA PSA catalogs. Leverage ongoing work with the PDAP prototype. –Reuse code for converting VOTables to Profiles. Data Set View not well suited for this prototype, but it’s workable.

3 August 2006Development Report19

3 August 2006Development Report20