1 Global Design Effort: Control System Vancouver GDE Meeting, July 2006 Controls Global System Review John Carwardine, ANL (For Controls Global Group Team)

Slides:



Advertisements
Similar presentations
Distributed Data Processing
Advertisements

Upgrading the Oracle Applications: Going Beyond the Technical Upgrade Atlanta OAUG March 19, 1999 Robert Cooney.
Wednesday July 19 GDE Plenary Global Design Effort 1 Instrumentation Technical System Review Marc Ross.
This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC Michigan State.
CMMI – Continuous as well as staged model CMMI capability levels – Incomplete, performed, managed, defined, quantitatively managed, optimized Example.
Hamid Shoaee LCLS FAC Controls June 17, LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.
Business Intelligence Dr. Mahdi Esmaeili 1. Technical Infrastructure Evaluation Hardware Network Middleware Database Management Systems Tools and Standards.
9 1 Chapter 9 Database Design Database Systems: Design, Implementation, and Management, Seventh Edition, Rob and Coronel.
DITSCAP Phase 2 - Verification Pramod Jampala Christopher Swenson.
Chapter 4 After Green Light. After the Green Light Contractual Agreement Marketing Requirements Document (MRD) Project DefinitionBudget Project Approval.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 2 Slide 1 Systems engineering 1.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 18 Slide 1 Software Reuse 2.
Effective Methods for Software and Systems Integration
BIS310: Structured Analysis and Design Introduction and Systems Planning Week 1.
October 24, 2000Milestones, Funding of USCMS S&C Matthias Kasemann1 US CMS Software and Computing Milestones and Funding Profiles Matthias Kasemann Fermilab.
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
High Level RF Technical System Review GDE Cost Review July Vancouver Canada Shigeki Fukuda & Ray Larsen For the HLRF Cost Team C. Adolphsen,
ILC Control and IHEP Activity Jijiu. Zhao, Gang. Li IHEP, Nov.5~7,2007 CCAST ILC Accelerator Workshop and 1st Asia ILC R&D Seminar under JSPS Core-University.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
CERN Accelerators Topology Configuration and Change Management Engineering Department Thomas Birtwistle, Samy Chemli – EN/MEF/DC.
Controls & LLRF ILC Controls Telecon September 20, 2006 John Carwardine 1.Reports from ESRF Meetings 2.Misc. Items 3.Participant “Radar” Items.
LCFOA Meeting at SLAC Linear Collider Forum of the Americas 1 LINEAR COLLIDER FORUM OF THE AMERICAS CONVENTIONAL FACILITIES OVERVIEW Victor R. Kuchler.
Stephen Schuh Vacuum Controls SCR and 16 November 2005 Vacuum Controls System Concept Review and Preliminary Design Review.
Robotics & Engineering Design Projective Management Chin-Sung Lin Eleanor Roosevelt High School.
Controls & LLRF ILC Controls Telecon August 17, 2006 John Carwardine RDR Report Writing.
International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
Information Systems Engineering. Lecture Outline Information Systems Architecture Information System Architecture components Information Engineering Phases.
LHC Cryogenics Control: INTEGRATION OF THE INDUSTRIAL CONTROLS (UNICOS) AND FRONT-END SOFTWARE ARCHITECTURE (FESA) APPLICATIONS Enrique BLANCO Controls.
VLCW July Global Design Effort1 Installation Global System Review F. Asiri W. Bialowons, T. Shidara Acknowledgment: C. Hauviller, R. Sugahara C.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Operations, Test facilities, CF&S Tom Himel SLAC.
SNS Integrated Control System Timing Clients at SNS DH Thompson Epics Spring 2003.
1 Global Design Effort Beijing GDE Meeting, February 2007 Controls for Linac Parallel Session 2/6/07 John Carwardine ANL.
Cost Model including Civil Engineering and Conventional Facilities Hans-H. Braun, CLIC ACE, June 20, 2007  Cost model goals  Methodology  Scaling assumptions.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
The fourth Baseline Technical Review (BTR) - Conventional Facilities and Siting March 2012 All changes made to the CFS 2007 Reference Design during.
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
Global design effort DOE meeting 8/10/06 Global design effort Americas 1 FY07 DOE ILC Budget recommendations G. Dugan ILC-GDE/Cornell University GDE Americas.
Architecture View Models A model is a complete, simplified description of a system from a particular perspective or viewpoint. There is no single view.
Managed by UT-Battelle for the Department of Energy SCL Vacuum Control System Upgrade Derrick Williams
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
1 Global Design Effort Beijing GDE Meeting, February 2007 Global Controls: RDR to EDR John Carwardine For Controls Global Group.
Global Design Effort - CFS AD & I Meeting - DESY AD & I Meeting - DESY 1 AD&I Meeting CONVENTIONAL FACILITIES AND SITING GROUP Main Linac Tunnel.
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
SLAC NLC & ILC Cost Modeling Ray Larsen January 28, 2006.
Controls Global Group Report John Carwardine ANL Presentation to GDE Bangalore Meeting, 10 March, 2006.
1 The ILC Control Work Packages. ILC Control System Work Packages GDE Oct Who We Are Collaboration loosely formed at Snowmass which included SLAC,
John Carwardine, Ewan Paterson, Marc Ross 14/15 July 2009 Availability Task Force: Subgroup #2.
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
Tor Raubenheimer KEK Mtg Goals KEK January 19 th, 2006.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
Timing System R+D for the NLC Josef Frisch. NLC and PEPII Phase and Timing Requirements (approximate)
Project X RD&D Plan Controls Jim Patrick AAC Meeting February 3, 2009.
January 9, 2006 Margaret Votava 1 ILC – NI/FNAL/ANL Brief overview of Global Design Effort (GDE) plans, dates, and organization: –Changes since Industrial.
Development Project Management Jim Kowalkowski. Outline Planning and managing software development – Definitions – Organizing schedule and work (overall.
1 Global Control System J. Carwardine (ANL) 6 November, 2007.
Personnel Safety Systems Stuart Birch Senior Engineer, Personnel Safety Systems November 6 th, 2014.
LECTURE 5 Nangwonvuma M/ Byansi D. Components, interfaces and integration Infrastructure, Middleware and Platforms Techniques – Data warehouses, extending.
Creating a Work Breakdown Structure with Microsoft Project.
Operations WBS Dictionary Integrated Control Systems Henrik Carling ESS/ICS Date:
RDR Controls Design Walk- Through Controls and LLRF EDR Kick-Off Meeting August 20-22, 2007.
Second SPL Collaboration Meeting, Vancouver May 2009
The ILC Control Work Packages
Accelerator Physics Technical System Group Review
Design and Implementation
Project Management Process Groups
RF System (HLRF, LLRF, Controls) EDR Plan Overview
Chapter 2: Building a System
Presentation transcript:

1 Global Design Effort: Control System Vancouver GDE Meeting, July 2006 Controls Global System Review John Carwardine, ANL (For Controls Global Group Team)

Vancouver GDE Meeting, July 2006 Global Design Effort: Control System 2 Outline Scope of controls costing exercise. Status of design. Assumptions. Bases of estimates. Manpower and M&S pie-chart breakdowns. Plans.

Vancouver GDE Meeting, July 2006 Global Design Effort: Control System 3 Included in the costing… –Global Control System hardware and software. –Computing for the accelerator control system. –Control system databases. –Control system network infrastructure. –5Hz feedback infrastructure. –Control system front-end electronics and cabling. –Personnel Protection System logic –Machine Protection System logic. –LLRF electronics and cabling.

Vancouver GDE Meeting, July 2006 Global Design Effort: Control System 4 Not included… Out of scope –Local control electronics for technical systems. –Local protection logic for technical systems. Not included …but not out of scope –Control systems for on-site test facilities for technical equipment. Out of scope for controls, but is being costed by FNAL: –Computing infrastructure for everything else: desktop computing, technical/scientific computing, Information Systems, CAD/CAE, etc

Vancouver GDE Meeting, July 2006 Global Design Effort: Control System 5 Design & costing status: controls Conceptual design done for all sub-systems but MPS. Simplified costing model developed for front-end electronics. Initial device counts are known for all area systems. Area System costing details and roll-ups are complete. Global control system costing details and roll-ups are complete.

Vancouver GDE Meeting, July 2006 Global Design Effort: Control System 6 Design & costing status: LLRF LLRF for Main Linac and RTML are well understood. Crab Cavities and Damping Ring LLRF are less well defined but are a small percentage of the total system. Key components exist as prototypes at DESY and FNAL –Designs will progress for test stands in all regions and will be upgraded as technology improves. RF phase reference specs are beyond state of the art –Design concepts in the costing model have been tested, but performance is not demonstrated –Will require simple harmonic relationships between 1.3GHz and other generated frequencies.

Vancouver GDE Meeting, July 2006 Global Design Effort: Control System 7 Assumptions: standardization A standard LLRF building block is assumed across all machine areas and HLRF technologies. A high level of standardization is assumed for the technical system interfaces to the control system –Not just defined as “Ethernet”, but also specify protocols, equipment behavior, functionality, etc Standardization is necessary to… –Reduce controls manpower. –Have consistent look/feel for similar equipment. –Ensure that equipment can be fully integrated.

Vancouver GDE Meeting, July 2006 Global Design Effort: Control System 8 Assumptions: High Availability HA is inherent in the control system baseline. Impact on overall controls methodology (QA): –More formalism in the design process. –Greater emphasis on standards, standardization, testing, and configuration control. Impact on design choices –HA compliant front-end platform (ATCA). –Additional functionality to support automated diagnosis and recovery from failures. –HA for computing & networking infrastructure.

Vancouver GDE Meeting, July 2006 Global Design Effort: Control System 9 Assumptions: manufacturing Individual components manufactured off site, either to specification, COTS, or “built to print.” Where possible, equipment assembly, integration, testing will be done on site and on the surface –Deliver fully assembled and pre-tested electronics relay racks to Installations Group. –Deliver pre-terminated, pre-tested cables.

Vancouver GDE Meeting, July 2006 Global Design Effort: Control System 10 Basis of estimates: controls Global Integrated Control System –Conceptual design uses a 3-tier architecture. –Assume control system will be founded on an existing well-established software framework. Front-end electronics –High level interfaces assumed in most cases (“Ethernet”) rather than discrete I/O. –Costing model uses ATCA, redundant processors. –Bottom-up estimates from AS device counts.

Vancouver GDE Meeting, July 2006 Global Design Effort: Control System 11 Bases of estimates: LLRF LLRF –Cost estimates are extrapolations of current systems at DESY, KEK, SNS, and FNAL. –Consolidated estimates from all three regions. RF Phase reference distribution –Global (fiber): costing of conceptual design component parts. –Local (copper): extrapolated from SNS design. –Assumes simple harmonic relationships between 1.3GHz and all other frequencies.

Vancouver GDE Meeting, July 2006 Global Design Effort: Control System 12 Basis of estimates: computing Computing and network infrastructure –Costing model derived from assumptions about data rates, processing, and 5Hz feedback needs. –Component costs come from COTS products. Control Rooms –Costs based on recent designs for other facilities.

Vancouver GDE Meeting, July 2006 Global Design Effort: Control System 13 Basis of estimates: PPS, MPS Personnel Protection System –Conventional dual-chain PLC-based system. –Costing based on existing equipment with assumed zone sizes (eg 500m in linac) Machine Protection System –“Pre-conceptual” design stage. –Made assumptions about numbers of electronics modules and data distribution links.

Vancouver GDE Meeting, July 2006 Global Design Effort: Control System 14 Basis of estimates: manpower Top-down estimate based on ‘typical’ functional needs –Common core software development. –Applications engineers embedded in each technical area (eg PS, RF, Vac, Cryo, MPS, …) –Engineering & technical support functions. –Manufacturing function for relay rack assembly. –LLRF hardware and software. We did not include any additional manpower overhead for managing a globally distributed controls effort.

Vancouver GDE Meeting, July 2006 Global Design Effort: Control System 15 Manpower ramp-up The following tasks are assumed to have been completed prior to project start: –Essential R&D has been completed. –Critical state-of-the-art requirements have been demonstrated through prototyping. –Major hardware and software design tasks have been completed. –Controls standards & interface specifications have been communicated to technical groups. –Requirements from the technical groups are broadly known.

Vancouver GDE Meeting, July 2006 Global Design Effort: Control System 16 Manpower by category (no LLRF)

Vancouver GDE Meeting, July 2006 Global Design Effort: Control System 17 Many Assumptions Not all shelves and racks are expected to be fully populated in all areas - utilization factors incorporated into model, but may be too general LLRF, Cryo, Timing not included here General networking and computing not included here Medium/large power supplies have their own embedded local control Packaging of signals into actual cables with connectors not handled here Every ATCA shelf has 2 cpu’s, 1 shelf manager, 1 event receiver Controls front-end equipment by AS

Vancouver GDE Meeting, July 2006 Global Design Effort: Control System 18 M&S by category (no LLRF)

Vancouver GDE Meeting, July 2006 Global Design Effort: Control System 19 Cost impact of High Availability HA-specific M&S costs in baseline (~20% of total): –ATCA with redundant processors vs VME/VXI. –Redundant networks. –Redundant RF phase distribution links. HA-specific manpower in baseline (~7% of total): –HA framework management, QA, testing. –HA specific core software development. Further R&D is required to better assess the cost of HA implementation.

Vancouver GDE Meeting, July 2006 Global Design Effort: Control System 20 Potential for cost optimizations Local RF phase reference distribution. Front-end electronics rack utilization –Could reduce the total number of relay racks. Technical System interfaces –Add a low-complexity front-end for equipment with signal-level interfaces. Cabling and connector costs –Optimize selections and manufacturing costs. Place electronics in the accelerator tunnel –eg mixers. Custom vs COTS electronic modules

Vancouver GDE Meeting, July 2006 Global Design Effort: Control System 21 Cross-checks on our costing Benchmarking against common “rules of thumb” –Control system costs as a percentage of accelerator technical system costs. –Cost per I/O channel. Peer reviews –Estimates have been reviewed by team members in all three regions. –Limited informal external reviews of top-level estimates and costing methodology. Informal comparisons have been made with other facilities: SNS, NLC, Fermilab, NIF, LHC,...

Vancouver GDE Meeting, July 2006 Global Design Effort: Control System 22 R&D activities with cost implications High precision local & global RF phase reference distribution. Implementing High Availability. Implementing system level automated diagnosis and recovery.

Vancouver GDE Meeting, July 2006 Global Design Effort: Control System 23 Plans… At Vancouver: –Resolve any issues regarding our assumptions or scope with technical systems groups. By Valencia –Develop conceptual design for MPS. –Refine costing model for cable plant. –Rack optimization (depends on how well we know the technical system interfaces). –Update BCD with the latest design information. –Respond to feedback/assignments from DCB.

Vancouver GDE Meeting, July 2006 Global Design Effort: Control System 24 Towards the TDR Continue to develop the engineering design –Refine integrated control system design. –Develop integrated detailed views of MPS, Timing, beam-based feedback, etc –Further refine the technical interfaces. –Define site-wide controls infrastructure: networks, timing, etc Establish basis for standards for controls hardware, software, protocols, etc. Define controls expectations of the technical systems. Implement an R&D program to address critical issues.