July 2, 2010 10th ATF2 Project Meeting Philip Bambade, Andrei Seryi, Toshiaki Tauchi Summary for TB.

Slides:



Advertisements
Similar presentations
ATF2: Status Update Glenn Christian (on behalf of FONT group) 10 th ATF Project Meeting.
Advertisements

Brett Parker* BNL-SMD *For the ATF2 Superconducting Magnet Upgrade Collaboration Update on SC Magnets and Schedule.
ATF2 FB/FF layout Javier Resta Lopez (JAI, Oxford University) for the FONT project group FONT meeting January 11, 2007.
Status of IPBSM Improvement N. Terunuma, KEK 2012/July/13 ATF2 Weekly Meeting.
-brief report of October runs and some inputs for the Nov/Dec planning – Nobuhiro Terunuma, KEK, ATF ATF session on LCWS13, Tokyo Univ., Nov. 13, 2013.
ATF2 Progress Report For CLIC Workshop Kiyoshi KUBO.
ATF2 Status and Plan K. Kubo ATF2, Final Focus Test for LC Achievement of 37 nm beam size (Goal 1) – Demonstration of a compact final focus.
1.Beam Tuning Simulation 2.IP Beam Position Stability 2-1 ) Magnet Vibration 2-2 ) IP position jitter subtraction for 2 nd bunch with FONT feedback 2-3.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
Discussion on Milestone and schedule Toshiyuki Okugi ATF2 commissioning meeting 1 / 7 / 2009.
ATF2 test facility Andrei Seryi, SLAC for the ATF2 team to be presented to ILC Accelerator Advisory Panel April 19, 2009.
Accelerator R&D on LC - Activities of ATF & STF - 1. Introduction 2. ATF 3. STF 4. Summary Seiya Yamaguchi, KEK The US/Japan Collaboration in High Energy.
ATF2 Javier Resta Lopez (JAI, Oxford University) for the FONT project group 5th ATF2 project meeting, KEK December 19-21, 2007.
Personal strategy for ATF2 beam operation in 2009 Toshiyuki OKUGI 2009 / 7 /22 ATF2 weekly meeting.
ATF2 commissioning in Autumn 2009 for discussion Philip Bambade LAL & KEK LCWS09 BDS session Albuquerque, New Mexico October 1, 2009 on behalf of the commissioning.
ATF2 ILC Final Focus Test Beam Line at KEK-ATF References : ATF2 Proposal, KEK Report ATF2 Proposal Vol.2, KEK Report ホームページ:
ATF2 optics … 1 3 rd Mini-Workshop on Nano Project at ATF ATF2 optics, tuning method and tolerances of initial alignment, magnets, power supplies etc.
UK/EU Plans for ATF2 G.A. Blair ATF2-IN2P3-KEK kick-0ff meeting, Annecy, 8 th October 2006 Overview EUROTeV UK.
June 30, th ATF2 Project Meeting Andrei Seryi for the ATF2 team May 2010 Continuous Run Operation.
Continuous Run in May K.Kubo. Final Focus Test Line IP; ~40 nm beam ATF Linac (1.3 GeV) ATF Damping Ring (140 m) Extraction Line Photo-cathode.
Summary of Commissioning and Tuning session Philip Bambade LAL-Orsay 5 th ATF2 project meeting KEK, 21 December 2007.
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
ATF-II Review by GDE Marc Ross, (SLAC) For GDE Project Managers: Nick Walker and Akira Yamamoto 24 January, th ATF2 Collaboration Meeting.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
Feedback On Nanosecond Timescales (FONT): Robert Apsimon, Philip Burrows, Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Davide Gamba,
Development of a Low-latency, High-precision, Intra-train Beam Feedback System Based on Cavity Beam Position Monitors N. Blaskovic Kraljevic, D. R. Bett,
Wakefield Calculations for the ATF2 Beamline A. Lyapin, Wakefield Calculations for the ATF2 Beamline 1 S. Boogert, J. Snuverink (JAI/RHUL, UK)
4 th Meeting of the ATF Technical Board and System/Group Coordinators Cockcroft Institute Daresbury, UK May, 2007.
Mark Woodley, SLACATF2 Project March 20-21, Summary of Tuning, Corrections, and Commissioning.
Highlights and discussion at LAL FKPPL & FJPPL “Toshiko Yuasa” workshop Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay,
Technical Board “issues” Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay, France ATF2 Technical Review KEK, 3-4 April.
8 th Meeting of the ATF TB/SGC 11 June Hardware Status Fast Kicker – FID pulsers have had a reliability problem: this appears to have been solved.
ATF2 Kiyoshi KUBO Accelerator Test Facility (ATF) at KEK ATF – Designed as a prototype of damping ring and injector of LC – Achieved low vertical.
Brett Parker* BNL-SMD *For BNL Superconducting Magnet Division and the ATF2 Superconducting Magnet Upgrade Collaboration ILC Superconducting Final Doublet.
1 FONT R&D status Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford University.
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
Low emittance tuning in ATF Damping Ring - Experience and plan Sendai GDE Meeting Kiyoshi Kubo.
Design of the ATF2 FB/FF Systems Javier Resta Lopez (JAI, Oxford University) for the FONT project group Final EUROTeV Scientific Workshop Uppsala, 25-27th.
Greeting for 10 th ATF2 project and TB/SGC joint meeting 1.
Status of ATF Collaboration The unique test facility for ILC with a low emittance beam. Junji Urakawa, KEK LCPAC at KEK
Design and Simulation of Intra-train Feedback Systems at ATF2: Current Status and Future Plans Javier Resta Lopez (JAI, Oxford University) for the FONT.
Global Design Effort Introduction and goals of the meeting Andrei Seryi, Toshiaki Tauchi Fifth ATF2 Project Meeting December 19-21, 2007.
Future ATF Plans beyond JFY2012 (From JFY2013) After this, we have to submit final proposal to KEK directorates in May The approval process at KEK.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John.
IP instrumentation configuration for Autumn 2010 ATF2 runs Toshiyuki OKUGI, KEK 2010 / 7/ 1 10 th ATF2 project meeting.
ATF2 Tuning Summary Nov & Dec 2010 Glen White, SLAC 11 th ATF2 Project Meeting, SLAC Jan
ATF2 Software Review LAL June SHORT SUMMARY - Philip Bambade ATF2 weekly meeting July
Task Lists of ATF2 commissioning Toshiyuki Okugi ATF2 Project Meeting 12 / 17 / 2008.
ATF2: Summary of Scheduling Strategy Session Grahame Blair Feedback and Feedforward systems Fast Kicker for ILC bunch train structure Laser-wire Shintake.
ATF2 beam operation status Toshiyuki OKUGI, KEK The 9 th TB&SGC meeting KEK, 3-gokan Seminar Hall 2009/ 12/ 16.
Summary of Tuning, Corrections, and Commissioning ( Short summary of ATF2 meeting at SLAC in March 2007 ) and Hardware Issues for beam Tuning Toshiyuki.
ATF2 Software Review LAL June 2008 Philip Bambade & Glen White ATF2 weekly meeting June
Accelerator Activities at Spain Madrid CIEMA T CMAM Valencia IFIC Bilbao ESS Barcelona ALBA UPC Sevilla CNA 1 PAC-ILC May 2010.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John.
Global Design Effort Progress and Plans of the Beam Delivery Systems and Machine Detector Interface WG Daniel Schulte (CERN), Brett Parker (BNL), Andrei.
IoP HEPP/APP annual meeting 2010 Feedback on Nanosecond Timescales: maintaining luminosity at future linear colliders Ben Constance John Adams Institute,
Collaborations on Beam Instrumentation R&D – A personal view – Manfred Wendt Fermilab 11/21/2008Project X Instrumentation WG1.
Technical Board Summary Preliminary Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay, France ATF2 project meeting, Technical.
ATF2 Software tasks: - EXT Bunch-Bunch FB - IP Bunch-Bunch FB - FB Integration Status and plans Javier Resta-Lopez JAI, Oxford University ATF2 commissioning.
ILC R&D Activities at KEK Superconducting Linac Development Beam-handling Technology Development.
Status of ATF2 linear collider focus prototype emphasizing France-China joint contributions Philip Bambade Laboratoire de l’Accélérateur Linéaire Université.
Simulation for Lower emittance in ATF Damping Ring Kiyoshi Kubo Similar talk in DR WS in Frascati, May 2007 Most simulations were done several.
Special ATF Session - ATF/ATF2 day on 28th September -
Expected hardware status and Priority of the commissioning task
Philip Bambade, Andrei Seryi, Toshiaki Tauchi
Oversea collaborators
report from 12th ATF TB & SGC meeting and trip to KEK
Summary of the ATF2 project meeting at LAL (Jan.13-15, 2016)
Progress towards nanometre level beam stabilisation
ATF ICB meeting, LCWS08, UIC, Chicago, 11/18/2008
Presentation transcript:

July 2, th ATF2 Project Meeting Philip Bambade, Andrei Seryi, Toshiaki Tauchi Summary for TB

10 th ATF2 Proj. Mtg. Summary: 2 Sessions, 1-st day … Intro –Greetings, Junji Urakawa –Goal of the meeting, Toshiaki Tauchi Instrumentation –Ring BPM upgrade & Orbit analysis, Nathan Eddy, Eliana Gianfelice-Wendt –FONT 5 status, Glenn Christian, et al –C/S-band cavity BPMs, Stewart Boogert, et al –IPBSM status, Masahiro Oroku, et al –IPBPM status, Youngim Kim, et al –ATF2/Extraction line Laserwire, Alexander Aryshev, et al –Stripline Fast kicker, Takashi Naito, et al –ATF2 extraction line Stripline BPM upgrade, Glen White, et al –Multi OTR, Angeles Faus-Golfe, Glen White, et al

10 th ATF2 Proj. Mtg. Summary: 3 … Sessions, 1-st day Beam tuning –EXT beam measurements and corrections, Mark Woodley –Beam-Based Alignment, Eduardo Marin –Beam Orbit Feedbacks in EXT and FFS, Glen White –IP tuning with multiknobs, Glen White –May 2010 Continuous Run Operations, Andrei Seryi –Re-Alignment of QF1FF, Ryuhei Sugahara –Plans for continuous run operations in 2010, Toshiyuki Okugi

10 th ATF2 Proj. Mtg. Summary: 4 Sessions, 2-nd day … Toward the first goal –IP instrumentation configuration and FD field quality issues for Autumn 2010 ATF2 runs, Toshiyuki Okugi –Review and status of software tools for ATF2, Shigeru Kuroda –Background study plan toward goal 1 in , Marc Verderi –Priority issues to study for goal 1, Glen White –Discussion Future plan after April 2013 –International workshop on physics in intense field, Tohru Takahashi –Permanent Q at IP as well as at the upstream, Yoshihisa Iwashita –KEK cryogenics system for SC-FF, Nobuhiro Kimura –American regional team recommendation for the focus of efforts with respect to superconductive final doublet development, Andrei Seryi –Discussion

10 th ATF2 Proj. Mtg. Summary: 5 … Sessions, 2-nd day Toward the second goal by end of March 2013 –ATF DR beam stability (including multi-bunch), needed studies and improvements, Kiyoshi Kubo –Fast bicker performance and plans, Takashi Naito –IPBPM plans, YoungIm Kim –FONT and integrated performance, Philip Burrows –Discussion on the schedule plan or road map

10 th ATF2 Proj. Mtg. Summary: 6 Goal of the meeting

10 th ATF2 Proj. Mtg. Summary: 7 Goal of the meeting

10 th ATF2 Proj. Mtg. Summary: 8 Goal of the meeting

10 th ATF2 Proj. Mtg. Summary: 9 Goal of the meeting

10 th ATF2 Proj. Mtg. Summary: 10 Tentative research schedule for not funded, to be reviewed T. Tauchi

10 th ATF2 Proj. Mtg. Summary: 11 Instrumentation Ring BPM upgrade

10 th ATF2 Proj. Mtg. Summary: 12 Instrumentation, FONT 5 status

10 th ATF2 Proj. Mtg. Summary: 13 Instrumentation, FONT 5 status With the current ATF2 setup (existing kicker system and 3 bunches) we occasionally see good correlations, usually after a lot of tuning

10 th ATF2 Proj. Mtg. Summary: 14 Summary of Collaboration discussion K. Kubo

10 th ATF2 Proj. Mtg. Summary: 15 Summary of Collaboration discussion T. Naito

10 th ATF2 Proj. Mtg. Summary: 16 Instrumentation, Fast kicker

10 th ATF2 Proj. Mtg. Summary: 17 Instrumentation, EXT Stripline BPM upgrade

10 th ATF2 Proj. Mtg. Summary: 18 Instrumentation, C/S-band cavity BPMs

10 th ATF2 Proj. Mtg. Summary: 19 Instrumentation, C/S-band cavity BPMs

10 th ATF2 Proj. Mtg. Summary: 20 Tuning, discussion of continuous run Best result of continuous tune week: May 17-21, 2010 Yoshio Kamiya and Shintake monitor group. Modulation Depth = 8.0 deg. mode Beam Size is (stat.) (syst.) nm First dedicated attempt at tuning ATF2 beamline in the week of May was proven to be very useful 300nm vertical beam size at IP waist achieved –Factor of ~4 from the intermediate “ILC scaled” milestone of ~80nm The 300nm size measured by 8deg mode and reproduced by measurement with 30deg BSM mode Improvements discussed & some being implemented

10 th ATF2 Proj. Mtg. Summary: 21 Instrumentation, IPBSM status

10 th ATF2 Proj. Mtg. Summary: 22 Instrumentation, IPBPM status Low-Q IP BPM electronics: latency : 17 ns; Sensitivity : -80 dBm; Expected resolution : 10 nm; Desired resolution : 2 nm (More development is required) Position sensitivity : 64.7 DDC/μm

10 th ATF2 Proj. Mtg. Summary: 23 Instrumentation, EXT Laserwire

10 th ATF2 Proj. Mtg. Summary: 24 Instrumentation, EXT Laserwire

10 th ATF2 Proj. Mtg. Summary: 25 Instrumentation, Multi-OTR May 2010: the 4 OTRs were installed in the EXT line

10 th ATF2 Proj. Mtg. Summary: 26 Instrumentation, Multi-OTR OTR Beam Tests - Target Damage Seen And was then understood

10 th ATF2 Proj. Mtg. Summary: 27 Tuning, EXT emittance M. Woodley

10 th ATF2 Proj. Mtg. Summary: 28 Tuning, BBA

10 th ATF2 Proj. Mtg. Summary: 29 Tuning, Orbit feedbacks

10 th ATF2 Proj. Mtg. Summary: 30 Cont. run: Identified issues, ideas & prospects Need to ease “jumping” from 8deg to 30deg mode –Can we enlarge angle for 8ded mode to ~10deg? (NO) –Use beta-squeeze to jump between modes, but ensure in advance that beta- squeeze works within single BSM mode (BBA for quads done, etc) –Need to reduce drift (increase) of beam size (both e-beamline & laser lines issue) Final doublet mounting & alignment precision (rotation) Additional possibilities for tuning (not yet tried) –Minimize sigma_x from time to time –Measure & check chromaticity (& verify values of sextupoles) –Analysis and correction of critical R matrix elements Apparently need a more handy online tool –to quickly verify how various knobs, suggested to be tried, are expected to act –This may become a more comprehensive online model with guesstimated errors, which would be gradually reduced, based on measurements and analysis

10 th ATF2 Proj. Mtg. Summary: 31 Tuning, QF1 realignment Discussion of KEK and SLAC colleagues followed by , recommendation is being prepared

10 th ATF2 Proj. Mtg. Summary: 32 Tuning, plans for Cont Oper Discussions of FD issues (rotation, strength) and IP-BPM installation are ongoing

10 th ATF2 Proj. Mtg. Summary: 33 Summary of Collaboration discussion A workshop to review software tools’ status ?

10 th ATF2 Proj. Mtg. Summary: 34 Summary of Collaboration discussion M. Verderi

10 th ATF2 Proj. Mtg. Summary: 35 Summary of Collaboration discussion M. Verderi

10 th ATF2 Proj. Mtg. Summary: 36 Summary of Collaboration discussion G. White

10 th ATF2 Proj. Mtg. Summary: 37 Compatibilities, draft W0 W1 W2 W3 W4 W5 W6 W7 W0 –Prep for fast kicker W1 ( LCWS ) –Fast kicker W2 –DR multi-bunch stability –FONT W3 –Laser wire –Tuning software tests –BSM tests W4 –Mini-continuous run –Other R&D W5 –Laser wire –Any other R&D W6 –Continuous run only W7 –Any R&D –Project meeting

10 th ATF2 Proj. Mtg. Summary: 38 Summary of SC FD This recommendations was prepared by ART team, discussed and accepted at the ATF2 Project Meeting  see Andrei Seryi’s presentation

10 th ATF2 Proj. Mtg. Summary: 39 Summary of Collaboration discussion

10 th ATF2 Proj. Mtg. Summary: 40 Summary of Collaboration discussion

10 th ATF2 Proj. Mtg. Summary: 41 Messages from Suzuki-san Most of R&D need to be done by 2012 Need new proposals after 2012 One proposal relater to… ATF and STF => a proposal of mini LC at KEK as first step toward ILC

10 th ATF2 Proj. Mtg. Summary: 42 Discussion of future collaboration organization

10 th ATF2 Proj. Mtg. Summary: 43 Discussion of future collaboration organization The audience generally supported this direction. These ideas will be further developed.

10 th ATF2 Proj. Mtg. Summary: 44 Summary of Collaboration discussion ART & SLAC (Glen W., Andrei S.) –ART continues support of ATF/ATF2. Consider high priority. (FNAL – Ring BPMs, BNL – ATF2 FD (funding & schedule discussed), SLAC (…)) – Ideas of increased participation at SLAC (IP-BPMs, maybe DR dynamics and feedbacks?) CERN (Frank Z.) –Continue support; Visitors; Tuning & commissioning; Low-  ; re-opt FF with Mapclass; BBA; –Goals for 2012 depend on achievement of goals; (Frank: Need prioritization !) –CERN Council opens doors for greater integration KNU (Eun-San Kim) –Graduate student at ATF/ATF2; Hope to make R&D funds for Korea-KEK collaboration work UK (Stewart B., Andrei S.) –A lot of contribution to instrumentation, commissioning, etc; recognize importance of ATF/ATF2; discussion of the way to keep future engagement KEK (Junji U.) –Future research programs: High field physics; THz micro-wave beam for laser acceleration;  collider R&D; super-FD r&d to make smaller beam size; –Need common fund from collaborative institutes for Operation – to be proposed to ICFA

10 th ATF2 Proj. Mtg. Summary: 45 Summary Good progress toward ATF/ATF2 goals Next steps, schedules and priorities have been discussed Future directions of the research program are being discussed – accelerator science & also physics program ATF Collaboration is discussing new ways how such facilities can be supported and may pioneer their implementation

10 th ATF2 Proj. Mtg. Summary: 46 Back-up slides

10 th ATF2 Proj. Mtg. Summary: 47 Instrumentation Ring BPM upgrade

10 th ATF2 Proj. Mtg. Summary: 48 Instrumentation Ring BPM upgrade

10 th ATF2 Proj. Mtg. Summary: 49 Instrumentation Ring BPM upgrade

10 th ATF2 Proj. Mtg. Summary: 50 Summary of Collaboration discussion P. Burrows

10 th ATF2 Proj. Mtg. Summary: 51 Summary of Collaboration discussion P. Burrows

10 th ATF2 Proj. Mtg. Summary: 52 Instrumentation, C/S-band cavity BPMs

10 th ATF2 Proj. Mtg. Summary: 53 Summary of Collaboration discussion Y.I. Kim

10 th ATF2 Proj. Mtg. Summary: 54 Instrumentation, Fast kicker

10 th ATF2 Proj. Mtg. Summary: 55 Summary of Collaboration discussion T. Naito

10 th ATF2 Proj. Mtg. Summary: 56 Tuning, BBA

10 th ATF2 Proj. Mtg. Summary: 57 Summary of 2 nd day T. Okugi