MANAGEMENT SYSTEM GHANA SC GROUPE 1 TUNISIA, MOROCCO, CANADA, SWITZERLAND, TURKEY, HUNGARY, EGYPT, ESTONIA LUXEMBOURG.

Slides:



Advertisements
Similar presentations
AIR OPERATOR CERTIFICATION
Advertisements

AIR OPERATOR SURVEILLANCE. OBJECTIVES Determine compliance with regulatory requirements - safe practices Detecting changes in operational environment.
1 Welcome Training Programme Karachi Training Plan The objective of the workshop is to initiate the establishment of a training programme The.
Session No. 4 Implementing the State’s Safety Programme Implementing Service Providers SMS
THE CERTIFYING AUTHORITY
IAEA International Atomic Energy Agency Introductions; Objectives and Scope of the Course Tr aining course on Authorization and Inspection of Uranium Mining.
Checking & Corrective Action
Implementation Guidance for AMP Competency Standards Chris Webster Meteorological Service of New Zealand Limited.
Audit file reviews ordered by ACCA Audit file review orders Key features Basis of ACCA’s audit file assessment Guidance for firms (and “hot” reviewers)
Environmental Management Systems An Overview With Practical Applications.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.7 Commissioning Geoff Vaughan University of Central.
Developing a Chemical Risk Management Program
1 Work Health Safety Presented by Mitch Bates. 2 What is WHS? The WHS Act 2011 replaced the Occupational Health and Safety Act 2000… WHS came into legislation.
SAS No. 70 BADM 559 Jong Choi. Overview of SAS 70 Definition ▫SAS 70 helps service auditors to assess operational and technical controls of a service.
ToR of GEOSAF2 WG on Operational Safety Review of WG2.
Internal Auditing and Outsourcing
QSIT Management Controls QSIT Workshops. Management Controls u Importance u Assessment u Demonstration of Compliance.
Inclusion Ireland Annual Conference 28 March 2009 “Living Life to the Full” So where do Standards come in? Niall Byrne Deputy Director Office of the Chief.
1 Effective Safety & Health Assessments: Audits and Inspections Disclaimer: These safety materials, resources and PowerPoint ® presentations are not intended.
SMS Operation.  Internal safety (SMS) audits are used to ensure that the structure of an SMS is sound.  It is also a formal process to ensure continuous.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Staffing and Training.
GLP & Quality Assurance
Software Quality Assurance Lecture #2 By: Faraz Ahmed.
APLA ORGULLO DE PERTENECER.
Module N° 8 – SSP implementation plan. SSP – A structured approach Module 2 Basic safety management concepts Module 2 Basic safety management concepts.
School for drafting regulations Nuclear Safety Operation Vienna, 26 November -7 December 2012 Tea Bilic Zabric.
PERSONNEL LICENCING REGULATIONS  Afiland adapts ICAO Annex 1 SARPS  Except  Flight Navigator,  Flight Engineers  Flight Radio telephony Operators.
The views expressed in this presentation do not necessarily reflect those of the Federal Reserve Bank of New York or the Federal Reserve System Association.
ISO14001 Registration - Should we register How to select a registrar What to expect How to prepare Suzanne W. Sessoms, PE Excel Partnership (910)
Privacy Project Framework & Structure HIPAA Summit Brent Saunders
Prime Responsibility for Radiation Safety
The Audit as a Management Tool Vermont State Auditor’s Office – April 2009.
ACADEMIC PERFORMANCE AUDIT ON AREA 1, 2 AND 3 Prepared By: Nor Aizar Abu Bakar Quality Academic Assurance Department.
BSA PROGRAM REQUIREMENTS.  Written, approved by the board of directors, and noted in the board minutes.  Based on the risk assessment  Fully implemented.
Programme Performance Criteria. Regulatory Authority Objectives To identify criteria against which the status of each element of the regulatory programme.
Management System Part I: Quality System. Management system Objectives To understand the importance of a management system to ensure effectiveness of.
Permitting and Inspection. 1. When is decentralization effective? Delegate most permit writing and inspection functions to lowest possible level to effectively.
Quality Control Review The Institute of Chartered Accountants of India.
Understanding the EHS Management System Development Process David Downs President EHS Management Partners,Inc.
European Commission IDEAS - New Delhi 14 April 2005 European Commission DG Budget – Evaluation Unit.
ISO DOCUMENTATION. ISO Environmental Management Systems2 Lesson Learning Goals At the end of this lesson you should be able to:  Name.
Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin 6-1 Chapter Six Internal Control in a Financial Statement Audit.
STAGE #5: CLOSING 5 Process Stages of Project Management.
Recommendation of the European Parliament and of the Council of 4 April 2001 providing for Minimum Criteria for Environmental Inspections in the Member.
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Management Systems Part I.
INTERDEPENDENCY Ghana SC Morocco, Tunisia, Hungary, Egypt, Ghana, Turkey, Canada, Switzerland, Estonia.
Update: Inspection Demonstration Program Helen J. Barr, M.D. Deputy Director, Division of Mammography Quality and Radiation Programs.
RIC 2009 Construction Inspection Program: Industry Perspectives Russ Bell Director, New Plant Licensing March 11, 2009.
Environmental Management System Implementation. Practices, Aspects, Impacts- Concepts Mission Resource Impact Resource Impact Activities/ Operations Practices.
Copyright © 2007 Pearson Education Canada 9-1 Chapter 9: Internal Controls and Control Risk.
ISO RECORDS. ISO Environmental Management Systems2 Lesson Learning Goals At the end of this lesson you should be able to:  Describe.
Radiation Safety Regulations Part VIII: Management requirements and other requirements.
Internal Control Process at Geneseo. Objectives Understand the objectives of effective internal controls Describe Geneseo’s internal control program Accurately.
1 Vereniging van Compliance Officers The Compliance Function in Banks Amsterdam, 10 June 2004 Marc Pickeur CBFA CBFA.
Safety Management Systems Session Four Safety Promotion APTA Webinar June 9, 2016.
OVERVIEW OF THE MEDITERRANEAN PROJECT INT/9/176 "STRENGTHENING CRADLE-TO-GRAVE CONTROL OF RADIOACTIVE SOURCES IN THE MEDITERRANEAN REGION” Soumia ZEROUAL.
Audit of predetermined objectives
GD211 Training Module 5 Conclusions.
IRRS REFRESHER TRAINING Lecture 5
Sound Financial Management
ETPRES MISSION Conducted: in Jakarta, June 2012
AFILAND FEDERAL CIVIL AVIATION REGULATIONS
Privacy Project Framework & Structure
MARKETING, PURCHASING AND PRODUCTION (7 - 9%)
Developing of Licensing Process for NPP
Development of a Process for Conducting review & Assessment of PSAR of a NPP Group I.
PFMA audit outcomes Portfolio – Minister of Police
Commission Regulation (EC)
ESS Handbook for Radiation Protection
Presentation transcript:

MANAGEMENT SYSTEM GHANA SC GROUPE 1 TUNISIA, MOROCCO, CANADA, SWITZERLAND, TURKEY, HUNGARY, EGYPT, ESTONIA LUXEMBOURG

Opportunities for Improvement Job description of the staff involved in waste management Training and refresher program Audit function Quality assurance – Local rules? – Waste identification and treacability? – Process control? – Audit?

Oppurtunities for Improvement Delegation of authority Demonstration of budget management performance Level of details in supporting documentation ( consideration of process based regulatory control ) Continous improvement process

Conduct of operations  Modification  Procurment  Inspection  Maintenance  Incident and reporting  Record management  Etc….

MS Assessment MS system was assessed by internal committee Concluded MS was adequate However, more details required to substantiate conclusion

FUTURE WORK CRAFT II PROJECT Formal review of SC ( operator, regulator, …) Establishment of autorisation Review criteria Establishment of compliance assurance programme Development of a Case Study for different phases