Lobby 2190 sf Core 530 sf Rest 2190 sf Main Floor: Option 1 Key Separate
Lobby 2190 sf Core 530 sf Rest 2190 sf Main Floor: Option 2 Key Separate
Kitchen 2190 sf Bar 530 sf Seating 2190 sf Restaurant Key Separate Bar 530 sf Bar 530 sf
Creating the block Kitchen 2190 sf Bar 530 sf Seating 2190 sf Bar 530 sf Bar 530 sf
Conferencing 3980 sf Kitchen 2190 sf Bar 530 sf Seating 2190 sf Reception 2190 sf Mgmt suite 740 sf Core Move bubbles around, recolor
Seating 2190 sf Kitchen 2190 sf Bar 530 sf Reception 2190 sf Mgmt suite 740 sf Core Conferencing 3980 sf Convert to boxes and fill plan
Seating 2190 sf Kitchen 2190 sf Bar 530 sf Reception 2190 sf Mgmt suite 740 sf Core Conferencing 3980 sf Add circulation (and key if needed) Circulation
Upstairs, include: Handicapped rooms Small suites Medium suites Large suites Janitorial/housekeeping Fitness center Cores (2)
Precedent studies Need two (one can be from this summer) Find a project you like (because of similar size, program, location, or aesthetic) Format: single board
Include: Identify architect/interior designer, location, date Plan: simplified program/circulation diagrams (same as block diagram) Materials: create a materials board Lighting: photos of effects or equipment used Detail: (logo, menu, material usage, silverware design, etc)
What’s in this presentation? – Ideas board (collage of inspirational images, without words) – Metaphor/concept/partí board (word, phrase or sentence and a non-design image) – Concept model – Bubble diagrams for all floors and stacking (block) diagrams – Precedent studies (2) – Site analysis and view studies – Code analysis: accessibility
Homework: This Wednesday: read CMR 521, chapter 8 Next class we’ll talk about accessibility, board composition, and presentation techniques For Wednesday the 30 th : presentations due