EDMEDM LANL Review of EDM Cost and Schedule Jan Boissevain for Walter Sondheim, P-25, Los Alamos February 11, 2005, at Los Alamos National Laboratory Conventional.

Slides:



Advertisements
Similar presentations
Muon g-2 Muon g-2 Experiment Quarterly Report Aria Soha All Experimenter’s Meeting March 2, 2015.
Advertisements

Jo Beth Folger MMF Site and October 14, Conventional Facilities – MMF Presentation Outline Facility Design.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 14, 2009.
MICE Video Meeting, 10 Jan 081 Spectrometer Magnet Progress Michael A. Green Lawrence Berkeley Laboratory.
Review of the mechanical design of the final focusing region of the HIF Point Design T. Brown ARIES Project Meeting January 8, 2003.
We are Here! Gluex Collaboration Meeting May Engineering Status - Presented by Tim Whitlatch1.
12 GeV Upgrade of Cryogenics at Jefferson Laboratory (Jlab) Dana Arenius Engineering Division Cryogenic Systems ILC08 Nov This work is supported.
Collab 5/26/06 #1 EDMEDM Martin Cooper, Los Alamos Co-spokesperson and Contract Project Manager for the EDM Project for presentation to The EDM Collaboration.
Slide 1 D G Haase, EDM Meeting, 5/06 Refrigeration and Heat Budget for the EDM Cryostat David G. Haase Physics Department North Carolina State University.
Status and Integration of the Spectrometer Solenoid Magnets Steve Virostek Lawrence Berkeley National Lab MICE RAL June 15, 2007.
Edgar L. Black MUCOOL ADVANCED M.T.F. & M.I.C.E. LAYOUTS August 12-13, 2002 Edgar L. Black IIT.
U N C L A S S I F I E D Progress Report on the Dual-Use Cryostat John C. Ramsey Los Alamos National Laboratory.
WBS1 SBS Basic: Magnet and Infrastructure Robin Wines 11/4/ SBS DOE Review.
2014 Shutdown Schedule & UCN FY-2013 Resources 1 February 20, 2013.
Robert Pak 1 DOE VTX Review June 2, 2009 Mechanical Integration & Safety Personnel: Walt Sondheim: Mechanical Project Engineer Don Lynch: PHENIX Chief.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
Laser IFE Program Workshop Naval Research Laboratory February 6 & 7, 2001 A. Nobile, J. Hoffer, A. Schwendt, W. Steckle, D. Goodin, G. Besenbruch and K.
David Lee, FVTX Review Nov Cost and Schedule WBS 1.0 David M. Lee Los Alamos National Lab Deputy Project Leader.
RLSR 16/4/2015 UK Financial Plan & Risks. Content Finances – Cost to Completion Risks – Top level to completion – R9 working space – Summary 2 RLSR 24/11/2014.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
EDMEDM EDM Fast Start, May 23, 2006He3S, Steven Williamson EDM Fast Start Helium-3 Services (He3S) Steven Williamson May 23, 2006.
January 4, 2007 Project Overview RHIC II Project Internal Cost Review Roberto Than Cryogenics Systems January 4, 2007.
Collab 4/15/04 #1 EDMEDM UIUC meeting 12/3/2004 Walter Sondheim, P-25, Los Alamos for presentation to The EDM Collaboration UIUC meeting, Urbana, IL UCN.
1Page # Machine Assembly WBS 700 By: James H. Chrzanowski January 24, 2001.
EDMEDM EDM Collaboration Meeting 3-06 Jan Boissevain, P-25 March 2, 2006 NCSU EDM Experiment Design Status.
MICE RF Cavities and RFCC Module Update Allan DeMello and Derun Li Lawrence Berkeley National Laboratory MICE CM32 at RAL, UK February 9, 2012 February.
Collab Store 6/6/07 #1 EDMEDM Martin Cooper, Los Alamos Co-spokesperson for the EDM Project for presentation to The EDM Collaboration Los Alamos, NM June.
P25 Interface 5/19/08 #1 Martin Cooper, Los Alamos Co-spokesperson for the EDM Project for presentation to The nEDM Subsystem Managers Duke University,
Extraction Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design and Safety Review.
SBS Magnet and Infrastructure Status Robin Wines July 2015.
RSVP AGS Upgrade Projects MECO RSVP Preliminary Baseline Review Brookhaven National Lab April 6-8, 2005 D. Phillips.
Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs Cost Schedule.
EDM Engineering Issues General Mechanical Considerations EDM Cryostat Plan D ANSYS EMAG Calculations ANSYS MECH Calculations 3 June ‘03 J. Boissevain.
Takeyasu Ito University of Tennessee/Oak Ridge National Laboratory EDM Cost and Schedule Review February, 2005 Beam Splitter / State Selector, Polarizing.
Resources, Timeline & Contingency UCN CDR (Sept/2010)
Engineering Approach EDM Collaboration Meeting 2-07 Jan Boissevain.
SC Project Review of NCSX, April 8-10, 2008 NCSX Machine Assembly E. D. Perry.
EDM in ER2 at LANSCE Jan Boissevain LANSCE ER-2 Stake Holder Meeting
EDMEDM LANL Review of EDM Cost and Schedule Jan Boissevain, P-25 February 11, 2005, Los Alamos National Laboratory EDM Reference Design Tour of the Reference.
1 Re-gas compressors to 2.20 Mpa - Me New oil mist adsorbers in compressors at 20k hrs - Me Service cold heads - Sumitomo Replace broken insulating vac.
EDMEDM C&S Review 2/11/05 #1 Martin Cooper, Los Alamos Co-spokesperson for the EDM Project for presentation to LANL Cost and Schedule Review Committee.
Robert Pak, FVTX Annual Review, Nov WBS Mechanical Integration Personnel: Walt Sondheim: Mechanical Project Engineer Don Lynch: PHENIX Chief.
EDM Fast Start Presentation WBS 11 – Assembly and Commissioning Vince Cianciolo, Paul Huffman May 23, 2006.
EDMEDM EDM Collaboration Meeting 6-05 Jan Boissevain, P-25 June 20, 2005, Los Alamos National Laboratory EDM Reference Design.
Status of Engineering Preparations for CD2/3A nEDM Collaboration Meeting – MIT Bates Jan Boissevain November 2, 2007.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
Assembly 12/14/06 #1 Assembly and Commissioning Paul Huffman.
NML - RF Unit Test Facility Jerry Leibfritz Fermilab.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
Thomas Jefferson National Accelerator Facility Page 1 Dana Arenius Cryogenics Control Account Manager 12 GeV Upgrade Project X Collaboration September.
Agriculture Mechanics as a Profession Mechanics A branch of physics that deals with motion and the action of forces on bodies.
Attempting to Cost Estimate the nEDM Upper Cryostat Larry Bartoszek, PE Bartoszek Engineering 12/2/04.
LANL Cost and Schedule Review 02/11/05 1 Cryostat (lower half) WBS 3.1, 3.5, 3.6, 3.7, 3.8, 3.10 Paul Huffman, Chris O’Shaughnessy North Carolina State.
HTS-2 – FY17 Budget Request Joe Ozelis, Sr. Eng. Physicist PIP-II Budget Retreat 26 April, 2016.
NEDM Cost and Schedule Review, February 11, 2005 Upper Cryostat and Valves Cost and Schedule for WBS 3.2, 3.3, 3.4, and 8.2 L. M. Bartoszek D. H. Beck.
Cryovessel Engineering David Haase, Jan Boissevain, Ernie Ihloff WBS long lead time items Cryovessel Dilution Refrigerator Helium Liquefier.
MICE Coupling Coil Vacuum Vessel Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Schedule Steve Sawch Asst. Director, Construction Management CF Advisory Committee Review of the.
Collab_NSAC 4/2/03 #1 EDMEDM Martin Cooper, Los Alamos Co-spokesperson for the EDM Project for presentation to EDM Collaboration Meeting Los Alamos, NM.
WBS 1-7 System Assembly & Installation John Voirin August 10-11, 2011.
Integration of the Spectrometer Solenoid Magnets
EDM engineering review Oak Ridge, TN , Infrastructure sub-system,
CBETA Technical Review
FRIB Cryogenic Support
Integrating a Data Center into an Engineering Laboratory Building
Dana M. Arenius Jefferson Laboratory Cryogenics Dept Head
Detector Hall Tom Lackowski ILD Workshop 2011 LAL, Paris
Camera to Top End Assembly Integration Travis Lange Camera I&T M. E
Experimental equipment Edgar L. Black February 17, 2019
Presentation transcript:

EDMEDM LANL Review of EDM Cost and Schedule Jan Boissevain for Walter Sondheim, P-25, Los Alamos February 11, 2005, at Los Alamos National Laboratory Conventional Construction WBS 12.1Platforms WBS 12.2Electrical Plant WBS 12.3Plumbing WBS 12.4Mechanical Supports WBS 12.5Counting House

EDMEDM WBS 12.1 Platforms Design Platforms $24.3K –Layout Platform ME 40h, MD 40h –Work w/ vendor ME 40h Procure Platforms$114K –LiaisonME 40h –Materials$65K Installation of Platforms $21.5K –Install S Tech 40h, Tech 40h

EDMEDM LANL Review of EDM Cost and Schedule Platforms: Possible vendor, meets OSHA and PE reviews Hydraulic lift platform

EDMEDM LANL Review of EDM Cost and Schedule Platform vendor:

EDMEDM WBS 12.2 Electrical Plant Design Electrical Plant $54.6K –LayoutME 120h –Electrical DesignEE 40h, ED 120h Procure Electrical Plant$121.2K –Materials$75K Installation of Electrical Plant$123.1K –InstallS Elect 480h, Elect 480h 250KW Electrical Power Plant 480VAC 3Ø 5 wire 208VAC 3Ø 5 wire clean and dirty

EDMEDM EDM Electrical Utilities Summary

EDMEDM WBS 12.3 Plumbing Plumbing Layout Design $94.2K –LayoutME 280h –DrawingsMD 200h Procure Plumbing$129.3K –Materials$80K Installation of Plumbing$116.9K –InstallS Plumber 320h, Plumber 320h –WeldWelder 200h Chilled water system for 250KW Helium Liquefier

EDMEDM EDM Mechanical Supports Mechanical Supports for EDM experiment assembly and maintenance: –Main mandrel to assembly cosine-theta coils plus shielding in Target Cryostat and Upper Cryostat –Assemble vacuum can and magnetic shielding –Assembly of Helium 3 source – sled –Jig to interface Helium 3 source to upper cryostat –Alignment jig for dilution refrigerator insert and maintenance –Assembly of Upper Cryostat to Target Cryostat –Jigs and Fixtures to assemble high voltage system in target cryo. –Assembly of re-entrant insert, interface to SNS beamline

EDMEDM WBS 12.4 Mechanical Supports Section Design Mechanical Supports $185K Cryostat SupportsME 200h Ancillary SupportsME 200h Jigs and FixturesME 200h DraftingMD 320h Section Procure Mechanical Supports $193.9K Materials$120K Section Install Mechanical Support$78K InstallME 80h, S Tech 240h, Tech 200h

EDMEDM WBS 12.5Counting House EDM possible counting house solution, GE Modular Space, Approximately $50.00 sq. ft.