TOWN OF NORTH EAST NEW TOWN HALL AND HIGHWAY FACILITY October 2015.

Slides:



Advertisements
Similar presentations
Capital Improvement Plan Financial Options September 12, 2013 Presented by: City Administration Finance Department.
Advertisements

Capital Project Presentation As approved through formal resolution by the RCS Board Of Education on March 11,2015. This new presentation outlines the $750,000.
Lakewood School District REFERENDUM SEPTEMBER 30, 2014.
2 Water and Waste Loans and Grants United States Department of Agriculture??? Rural Development: Mandate to improve the quality of life in Rural America.
Remsenburg – Speonk Union Free School District Elementary School Bond Planning Presentation October 12, 2010 BBS Architects and Engineers and Triton Construction.
Tax Increment Financing Town Center Project Midwest City, OK.
2010 C ITY OF E LMIRA B UDGET P ROPOSAL November 2009 John J. Burin, City Manager David Vandermark, City Chamberlain C ITY OF E LMIRA 2010 BUDGET PROPOSAL.
Why We Need It?  Lack of Space  Need to Meet Code Requirements  Inadequate Communications & Technology  Facility Maintenance Issues.
How to Hit a Homerun Saving Energy and Updating Facilities Presented by Shirley McNutt.
 Pay-as-you-go (cash) or Pay-as you-use (debt)?  Which approach is feasible given project costs, fund balances, debt burden, tax rates?  How will decision.
2011 PROPOSED PROPERTY TAX RATE Funding the 2011/12 General Fund Budget Public Hearing – August 9, 2011.
Amateur Sports Development at Bojangles Coliseum & Ovens Auditorium June 5, 2014 Economic Development & Global Competitiveness Committee.
KINGWOOD UDGET PRESENTATION TOWNSHIP OF KINGWOOD 2012 BUDGET PRESENTATION.
Proposed Budget Presentation APRIL 21, 2015.
STATE ROAD 100 CORRIDOR COMMUNITY REDEVELOPMENT AGENCY Bulldog Drive Improvements Right-of-Way and Design September 21, 2010 Presentation for SR 100 CRA.
Avon High School Proposed Renovations and Additions September 7, 2006.
Buying a Home. Renting a House AdvantagesDisadvantages.
Property Appraiser and Tax Collector Office Space Update July 8, 2014.
Financing Tools for Capital Projects Marshall Public Schools School Board Work Session 1 February 2, 2015.
Municipal Tax Increment Financing
Street Maintenance. The Town of Bayfield maintains centerline miles of road.
Tax Increment Thomas Chapman Raymond James John Repsholdt Ehlers Steven Langert Consolidated High School District 230.
Municipal Tax Increment Financing Daniel Stevenson, Office of the Commissioner, DECD Phone:
TOWN OF TYNGSBOROUGH Article 6 Capital Exclusion Overview.
Pasadena Water and Power APPROVE A PROJECT CONTINGENCY AMOUNT OF $2,500,000 FOR EXISTING CONTRACTS RELATED TO THE LOCAL GENERATION REPOWERING PROJECT -
City of West Linn Fiscal Year 2009 Budget Tuesday.
$18 million bond Construction of new Junior High campus Construction of safety improvements at Elementary School campus  Storm Shelter  Fire Safety.
Mt. Lebanon Public Works Facility Master Planning March 11, 2014 Update.
GC-4 April 2011 Bond Issue  Questions And Answers… 1.
Welcome Co-Owners Our Agenda for This Evening General Review of 2004 & 2005 to dateGeneral Review of 2004 & 2005 to date What “Your Board” has accomplished…
TOWN OF NORTH EAST NEW TOWN HALL AND HIGHWAY FACILITY September 2015.
Property Appraiser and Tax Collector Office Space Search Update Administrative Services Department February 25, 2014.
MOORESTOWN TOWNSHIP MUNICIPAL COMPLEX 3/22/10 Update.
1 Convention Center Authority Republican Policy Group Presentation March 23 rd 2015.
October 2011 Schlumberger Site Assessment 36 Old Quarry Road Ridgefield.
Update Presentation January 12, 2015 Town of Concord School Bus Transportation and Maintenance Center Town Project Team: Christopher Whelan – Town Manager.
1 Attachment A Austin Community College District Debt Status and Financial Options January 14, 2002.
MIDDLE TOWNSHIP PUBLIC SCHOOLS BOND REFERENDUM March 8, 2016 Bond Referendum BUILDING FOR OUR FUTURE.
TOWN OF TYNGSBOROUGH Ballot Question September 14, 2010 Capital Exclusion Overview.
FEBRUARY 22, 2016 FY 2017 County Administrator’s Recommended Budget.
1 Town of Taghkanic Highway Department Highway Facility Addition and Salt/Sand Storage.
Public Works/City Hall City Council Workshop Monday, December 23 rd 5:30 p.m. 1.
Presented to the Board of Education April 26, 2016.
Board of Selectmen Meeting April 14, Outline  Overview of problems  Overview of original plan  Overview of new plan Highlights Cost Timeline.
MODERNIZATIONS MEASURE G OVERSIGHT COMMITTEE September 8, 2015.
A1 - Contract Sales Price or Existing Debt  Purchase: Contract sales price of the property  Refinance: The amount of the existing debt  HUD REO:
SMITHVILLE R-II SCHOOL DISTRICT Tradition of Excellence The Power of One … One Community … One Future! November 4, 2014 SMITHVILLE R-II SCHOOL DISTRICT.
Building Acquisition Financing 400 East Main Street Public Hearing Stockton City Council/ Stockton Public Financing Authority November 6, 2007 Agenda Item.
BUDGET HEARING II Presented to the Board of Education MAY 10, 2016.
1.  Quick Overview of the History and Need  What is Planned for the Fire Department  What is Planned for the Police Department  Financial Details.
LOCAL OPTION SALES TAX FOR EDUCATION APPROVED BY THE BOARD OF TRUSTEES SEPTEMBER 29, 2015.
“BACK TO BASICS” November 2, 2010 CITY BOND ELECTION Facilities & Infrastructure Municipal Court Courthouse (Proposition 401) Municipal Services Maintenance.
DR. Nabil Dmaidi F ACTORS THAT D ETERMINE V ARIATION IN E STIMATES.
PROPOSED CITY OF STOCKTON WATERFORD ESTATES EAST PHASE II ASSESSMENT DISTRICT PUBLIC HEARING Stockton City Council January 6, 2004.
Windsor C-1 School District Planning 2017
Community Improvement Districts County Counselors Association of Kansas Annual Meeting November 15, 2010 Janet S. Garms
Proposed School Bond Referendum September 26, 2017
Fennville Public Schools
Financing Land Development Projects
Bond Election Order “SHALL the Board of Trustees of the Rockwall Independent School District in Rockwall, Kaufman and Collin Counties, Texas be authorized.
FIVE YEAR CAPITAL FACILITIES PLAN (Five Year Plan)
UNION GROVE ELEMENTARY REFERENDUM
2007 Bond Issue Capital Improvement Program
Garden City Public Schools Capital Reserve
Capital Project Update
Delta Water Supply Project
2018 Open Space Bond August 2, 2018.
November Bond Election
Warsaw Community Schools November 2018
Presentation transcript:

TOWN OF NORTH EAST NEW TOWN HALL AND HIGHWAY FACILITY October 2015

PRESENTATION OVERVIEW u Proposition u Proposed Land Acquisition u Proposed Construction u Construction Costs u Financial Implications

Bond Proposition Shall the bond resolution dated August 26, 2015, authorizing the acquisition of two parcels of land and the buildings thereon and the reconstruction retrofitting thereof for municipal purposes, located at 6073 and Route 22 in the Town of Northeast at a maximum estimated cost of $3,150,000, and authorizing the issuance of $3,150,000 serial bonds to pay the cost thereof, providing for a period of probable usefulness of twenty five years with the maximum maturity of such bonds to exceed five years, delegating to the Supervisor the power to sell and issue such bonds and bond anticipation notes in anticipation of the issuance of such bonds, pledging the faith and credit of the Town to the payment of principal of and interest on such obligations, and providing for an estoppel provision, be approved? Shall the bond resolution dated August 26, 2015, authorizing the acquisition of two parcels of land and the buildings thereon and the reconstruction retrofitting thereof for municipal purposes, located at 6073 and Route 22 in the Town of Northeast at a maximum estimated cost of $3,150,000, and authorizing the issuance of $3,150,000 serial bonds to pay the cost thereof, providing for a period of probable usefulness of twenty five years with the maximum maturity of such bonds to exceed five years, delegating to the Supervisor the power to sell and issue such bonds and bond anticipation notes in anticipation of the issuance of such bonds, pledging the faith and credit of the Town to the payment of principal of and interest on such obligations, and providing for an estoppel provision, be approved?

Identified Inadequacies of the Existing Town Highway Garage 1.Inadequate space Two large pieces of equipment & six attachments currently Two large pieces of equipment & six attachments currently have to be stored outside. (estimated replacement value of have to be stored outside. (estimated replacement value of these items is approximately $650k - $750k these items is approximately $650k - $750k Plows need be removed when trucks are put inside the highway Plows need be removed when trucks are put inside the highway garage garage Insufficient room to perform proper equipment maintenance Insufficient room to perform proper equipment maintenance 2.Environmental issues no oil/water separator; floor drains have been sealed as directed no oil/water separator; floor drains have been sealed as directed by NYSDEC by NYSDEC employees must work in mud & water when doing repairs employees must work in mud & water when doing repairs no adequate facilities to wash highway equipment no adequate facilities to wash highway equipment Proximity to existing Trout Stream Proximity to existing Trout Stream

Identified Inadequacies of the Existing Town Highway Garage 3.Interior working conditions garage does not have a proper ventilation system garage does not have a proper ventilation system windows in poor condition and will not open for proper windows in poor condition and will not open for proper ventilation ventilation Ponding water within garage Ponding water within garage overhead insulation is saturated with diesel soot overhead insulation is saturated with diesel soot expensive to heat (3,000 gallons of heating oil used this past expensive to heat (3,000 gallons of heating oil used this past year) year) Inadequate headroom to raise truck bodies, therefore some Inadequate headroom to raise truck bodies, therefore some repairs are performed outside. repairs are performed outside.

Unique Opportunity and Proposed Plan u The Town has been in discussions with the Owner of Dutchess Diesel regarding the potential acquisition of the existing Dutchess Diesel Facility located on Route 22. u The acquisition would provide for a unique opportunity to the Town allowing the Highway Department and Town Hall to be relocated to a single location.

Existing Dutchess Diesel Facility

Existing Facility u 2 Parcel consists of approximately 3.8 acres. u Two existing building - Main Building 11,858 SF. Garage Bldg. 10,440 SF. Garage Bldg. 10,440 SF. u Garage Building includes a pre-engineered steel building constructed in Building is fully heated. u Original Building with admin area was built in 1960’s. with several renovations and additions. u Current facility has an existing oil/water separator.

Project Acquisition Costs u Two Appraisals completed on project. u Owner’s Appraisal = $1,900,000 u Town’s Appraisal = $1,550,000 u $1,750,000 purchase price has negotiated u Copies of both appraisals are located on Town’s web site. u The Town’s Web Site also contains other information associated with the project.

Proposal for Consideration u Proposal is to move the Town Hall and Highway Garage Facility to the current Dutchess Diesel Location. u Town Highway Department would move into the existing Garage facility. A small portion of the existing main building would be renovated to provide for an office and breakroom. u A new Sand/Salt storage building would be built on the site to store deicing materials. u The Town Hall offices, including the court, would be relocated into the main building area. This would require the interior renovation of approximately 6,000.

Town Highway Garage Town Hall Relocation Renovation Estimated project cost Land Acquisition (2 parcel)$1,750,000 Salt/Sand Storage Construction$ 72,000 Building Renovations Interior selective demolition$ 51,000 Interior selective demolition$ 51,000 General Construction, interior$ 550,400 General Construction, interior$ 550,400 General Construction, exterior$ 75,000 General Construction, exterior$ 75,000 Electric, Communication, Generator$ 125,000 Electric, Communication, Generator$ 125,000 Heating and air conditioning$ 156,400 Heating and air conditioning$ 156,400 Plumbing$ 58,000 Plumbing$ 58,000 Construction subtotal$1,087,800 10% contingency$ 109,000 engineering, inspections, and contract administration$ 179,000 Total Project Cost$3,125,800

New Construction Cost Comparison New Highway Garage & New Town Hall New Construction Cost Comparison New Highway Garage & New Town Hall Estimated project cost Land Acquisition$ 400,000 New Salt/Sand Storage Construction$ 72,000 New Highway Building Construction (+/- 11,000 S.F) Site utilities, entrance, parking, and Storm Water$ 95,000 Site utilities, entrance, parking, and Storm Water$ 95,000 General Construction $1,650,000 General Construction $1,650,000 Electric, Communication, Generator$ 110,000 Electric, Communication, Generator$ 110,000 Heating and air conditioning$ 156,000 Heating and air conditioning$ 156,000 Plumbing$ 58,000 Plumbing$ 58,000 Garage Construction subtotal$2,069,000 ($188/sf) New Town Hall Building Construction (+/- 6,000 S.F) Site utilities, entrance, parking, and Storm Water$ 95,000 Site utilities, entrance, parking, and Storm Water$ 95,000 General Construction $1,150,000 General Construction $1,150,000 Electric, Communication, Generator$ 125,000 Electric, Communication, Generator$ 125,000 Heating and air conditioning$ 156,000 Heating and air conditioning$ 156,000 Plumbing$ 65,000 Plumbing$ 65,000 Town Hall Construction subtotal$1,591,000 ($265/sf) Town Hall Construction subtotal$1,591,000 ($265/sf) 10% contingency$ 366,000 10% contingency$ 366,000 Bonding, Legal, engineering, inspections, and contract administration$ 449,000 Total Project Cost$4,947,000

Previous Town Highway Garage and Town Hall Feasibility Since 2003, The Town has identified the need to provide for a more desirable location and better working conditions for its highway employees. Since 2003, The Town has identified the need to provide for a more desirable location and better working conditions for its highway employees. Previous feasibility project costs associated with the Potential acquisition of land, and the construction of a new highway facility complex would be approximately $2,200,000. Previous feasibility project costs associated with the Potential acquisition of land, and the construction of a new highway facility complex would be approximately $2,200,000. The Town also had previously considered the acquisition of the Millerton Elementary School (MES) and conducting the necessary repairs to the existing building renovating a portion of the interior for Town Offices. Updated figures, estimated the project cost to be over 2,200,000. The Town also had previously considered the acquisition of the Millerton Elementary School (MES) and conducting the necessary repairs to the existing building renovating a portion of the interior for Town Offices. Updated figures, estimated the project cost to be over 2,200,000.

Mitigating Factors Potentially Affecting Long Range Spending Landfill Remediation Project – EFC Bond “Debt Service” Original Bond Amount: $1,201,294 Current Finance Amount: $95,000 annual payment Last Payment due October 2015 Last Payment due October 2015 $35,000 Town Budget Line item $35,000 Town Budget Line item

Project Tax Implications September 2015 Total Project Cost = $3,150,000  Acquisition, Construction Cost include hard costs of construction plus soft hard costs of construction plus soft costs such as contingencies, engineering, costs such as contingencies, engineering, legal, and bonding legal, and bonding  Financing Bond $ % for 25 years. Annual payment = $197,398 Existing Debt Payment (2015)= $ 35,000 Net Increase = $162,398 Net Increase = $162,398 ($0.29/ $1000 of assessed value) $150,000 Valuation = $44.24 increase $200,000 Valuation = $58.99 increase $200,000 Valuation = $58.99 increase

Next Steps to Consider Proposal is in the very early stages of development Proposal is in the very early stages of development Project Referendum: Project Referendum: Proposal is on November Ballot, allowing tax payers to be part of the decision process regarding the project. Proposal is on November Ballot, allowing tax payers to be part of the decision process regarding the project. If referendum Passes If referendum Passes Continue to Due Diligence. Continue to Due Diligence. Perform Environmental Phase II that includes subsurface soil, soil vapor, and potable water testing. Perform Environmental Phase II that includes subsurface soil, soil vapor, and potable water testing. Perform Title Search of Property Perform Title Search of Property Continue to review project funding and bonding Continue to review project funding and bonding Continue with project development Continue with project development Department Head and Employee interviews and meetings Department Head and Employee interviews and meetings Continue to develop schematic designs of site and buildings. Continue to develop schematic designs of site and buildings. Develop contract drawings, bid and construct improvements Develop contract drawings, bid and construct improvements If referendum Fails If referendum Fails Town would need to take a step back and consider if other viable options exist and if it is appropriate to pursue them. Town would need to take a step back and consider if other viable options exist and if it is appropriate to pursue them.

Capital Upgrades & Building Improvements New Roof$ 400,000 Parapet and flashing repairs $ 20,000 Site preparation, paving$ 35,000 Sidewalk Repairs $ 15,000 Heating system Replacement $ 750,000 Interior office retrofit (4,000 $100 SF)$ 400,000 Subtotal$1,620,000 15% Contingency$ 243,000 15% Contingency$ 243,000 Soft costs$ 225,000 Soft costs$ 225,000 Total Project Cost $2,088,000 Total Project Cost $2,088,000

Operation & Maintenance Cost Electric:15% occupied$18,000 Heating:15% occupied$40,000 Insurance:$ 6,000 Systems Maintenance$ 1,500 Facility Maintenance$ 5,000 Outdoor Maintenance$ 5,000 $75,500 Annually