Cosmic Frontier Experiment Status August 25, 2014 ExperimentLocationStatusStart of operations Nominal end of operations Physics SuperCDMSSoudanOperatingMar.

Slides:



Advertisements
Similar presentations
Status of the Virgo Commissioning G.Losurdo – INFN Firenze/Urbino for the Virgo Collaboration.
Advertisements

September 21, 2005Virgo Status – ESF Workshop1 Status of Virgo B. Mours.
Cascina, January 25th, Coupling of the IMC length noise into the recombined ITF output Raffaele Flaminio EGO and CNRS/IN2P3 Summary - Recombined.
Mapping of Fires Over North America Using Satellite Data Sean Raffuse CAPITA, Washington University September,
Particle Astrophysics at Fermilab Craig Hogan, Director, FCPA Dan Bauer, Deputy Director, FCPA Presented to the FNAL PAC November, 2009 Overview and Strategic.
Present status of the laser system for KAGRA Univ. of Tokyo Mio Lab. Photon Science Center SUZUKI, Ken-ichiro.
JWG, 14 October, 2009, Vladislav Manko Status of work and plans of the Russian group in the ALICE Collaboration as of October, 2009.
Takanori Sekiguchi Italy-Japan Workshop (19 April, 2013) Inverted Pendulum Control for KAGRA Seismic Attenuation System 1 D2, Institute for Cosmic Ray.
Cascina, January 24, 2005 Status of GEO600 Joshua Smith for the GEO600 team.
MONALISA: Interferometric Position Monitor at the Nanometre Scale David Urner Paul Coe Matthew Warden Armin Reichold Oxford University.
Linac Status Eric Prebys DOE Review, Proton Source Breakout Session July 21,2003.
LIGO-G W Proposed LHO Commissioning Activities in May 02 Fred Raab 29 Apr 02.
1 Virgo Commissioning progress and plans ILIAS, Jan 23 rd 2007 Matteo Barsuglia on behalf of the Commissioning Team.
Neutron background measurement at LNGS: present status Measurement carried out in collaboration between LNGS ILIAS-JRA1 and ICARUS groups.
RF Stability Working Group Jorn Jacob (ESRF), John Byrd (LBNL) General Issues RF phase and amplitude noise –filtered by cavity and translate into timing.
Capture Cavity 1at A0 SIMCON2.1 with MATLAB  closed loop with max gain ( 250 )  RMS amplitude noise ≈ 0.07%  RMS phase Noise ≈ 0.2°  closed.
Eric Prebys, FNAL.  As you’ll show in homework, the synchrotron tune (longitudinal oscillations/turn) is generally
Vibration measurements on the final doublets and the Shintake Monitor Benoît BOLZON7th ATF2 project meeting, 16/12/08.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Virgo Control Noise Reduction
Alignment and Beam Stability
Interferometer Control Matt Evans …talk mostly taken from…
Linac Marx Modulator Update Trevor Butler 5/20/2015.
Virgo Commissioning update Gabriele Vajente for the Virgo Collaboration LSC/VIRGO Meeting – MIT 2007, July LIGO-G Z.
IPBSM - Stability of the laser system - Nobuhiro Terunuma Feb. 12 th 2014, KEK, 17 th ATF2 project meeting.
1 Virgo commissioning: Next steps December 12 st 2005 Hannover, ILIAS-GWA WG1 Matteo Barsuglia, LAL/CNRS.
Recent LFD Control Results from FNAL Yuriy Pischalnikov Warren Schappert TTF/FLASH 9mA Meeting on Cavity Gradient Flatness June 01, 2010.
SIMPLE Tom Girard ( for the SIMPLE Collaboration )
Dark Energy Survey (DES) (Presenter: Douglas Tucker) DES is observing (Aug. 15 th – Feb. 15 th ) Year 2 Operations Collaboration Meeting in Sussex, UK,
The RPC Closed loop Gas System Slides from Bianco and Guida.
1 The Virgo noise budget Romain Gouaty For the Virgo collaboration GWADW 2006, Isola d’Elba.
C.Vigorito, University & INFN Torino, Italy 30 th International Cosmic Ray Conference Merida, Mexico Search for neutrino bursts from Gravitational stellar.
On behalf of joint ITEP / IHEP team: A. Arefiev, N. Filimonov, T. Kvaratskheliya, I. Machikhiliyan, P. Shatalov, T. Zakoryuchkina, A. Zhokhov, S. Zvyagintsev.
Dan Bauer - CDMS Project ManagerAll experimenters meeting - April 23, 2007 Cryogenic Dark Matter Search (CDMS) Progress at Soudan since last summer Successful.
1 LESSONS FROM VIRGO+ May 17th 2010 E. Calloni for the Virgo collaboration.
LIGO-G D 1 Status of Detector Commissioning LSC Meeting, March 2001 Nergis Mavalvala California Institute of Technology.
1 Virgo Commissioning Status WG1 meeting Potsdam, 21 st July 2006.
The 6dF Galaxy Survey - The First Year Will Saunders Anglo-Australian Observatory.
M. Mantovani ILIAS Cascina March 2008 Automatic Alignment system Improvements after the VSR1 M. Mantovani for the Alignment team.
1 Kazuhiro Yamamoto Institute for Cosmic Ray Research (ICRR) the University of Tokyo KAGRA face to face meeting University of Toyama, Toyama, Japan 3 August.
Tenth Summer Synthesis Imaging Workshop University of New Mexico, June 13-20, 2006 Proposal Writing Joan Wrobel.
Taikan SUEHARA, IN2P3-KEK collaboration meeting on ATF2, Annecy, 2007/10/15 Shintake Monitor: Installation and Commissioning Schedule Taikan SUEHARA, The.
Status of Muon Activities W.Baldini, N. Bondar, O.Maev, B. Schmidt LS1 Meeting Dec. 20-rd 2013.
Considerations for an SPL-Beamdump Thomas Otto CERN in collaboration with Elias Lebbos, Vasilis Vlachoudis (CERN) and Ekaterina Kozlova (GSI) Partly supported.
Status Report for E391a (Continuation of the previous PAC on April) G.Y.Lim IPNS, KEK Group Meeting at the JINR 26 th – 29 th July 2003 Dzhelepov Laboratory.
Ninth Synthesis Imaging Summer School Socorro, June 15-22, 2004 Proposal Writing Joan Wrobel.
NUMI NUMI/MINOS Status J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting.
Sensitivity of Virgo E. Tournefier (LAPP-CNRS) LSC-Virgo week May 23 rd,2007 LIGO-G Z.
NLC - The Next Linear Collider Project Keeping Nanometer Beams Colliding Vibration Stabilization of the Final Doublet Tom Himel SLAC NLC MAC review October.
Haixin Huang AGS Cold Snake: Status and Plans.
1 Kazuhiro Yamamoto Institute for Cosmic Ray Research The university of Tokyo LCGT internal review (Cryogenic payload) 30 January 2012.
10-meter Interferometer Results M. Woods (special thanks to Steve Myers and Tim Slaton) Jan. 31, 2000 Commissioning Setup System Noise Monte Carlo simulation.
Sound Transmission Signal degradation in frequency and time domains Boundary effects and density gradients Noise Ranging Signal optimization.
SPM Users Basic Training August 2010 Lecture VIII – AC Imaging Modes: ACAFM and MAC Imaging methods using oscillating cantilevers.
1 Cosmic Ray Physics with IceTop and IceCube Serap Tilav University of Delaware for The IceCube Collaboration ISVHECRI2010 June 28 - July 2, 2010 Fermilab.
1 Cary Kendziora Fermi National Laboratory Cary Kendziora Fermi National Laboratory CEC-ICMC 2013 Anchorage Alaska – June, 2012.
LLRF regulation of CC2 operated at 4˚K Gustavo Cancelo for the AD, TD & CD LLRF team.
Cost Optimization Models for SRF Linacs
Test of the dressed spoke cavity
Gordon Breeze CEng, MICE, BSc, MSc
The Beam Test at Fermilab:
Reflection Seismic Method
Commissioning the LIGO detectors
Sound.
Sea & land breezes AS Geography.
Operations Department
Improving LIGO’s stability and sensitivity: commissioning examples
Status at the Prague meeting
Waves the move perpendicular to the motion of the matter it disturbs
Pilot-Study Update for WG E - March 2012.
Presentation transcript:

Cosmic Frontier Experiment Status August 25, 2014 ExperimentLocationStatusStart of operations Nominal end of operations Physics SuperCDMSSoudanOperatingMar 2012Mar 2015?Dark Matter COUPP/PICO 2LSNOLABOperatingDec 2013Dec 2014?Dark Matter COUPP/PICO 60SNOLABOperatingJune 2013Dec 2015?Dark Matter Darkside 50LNGS (Gran Sasso) Operating/Cali brating Jan 2014Dec 2016?Dark Matter DAMICSNOLABOperatingDec 2012Dec 2014Dark Matter Dark Energy Survey CTIO, ChileOperatingSep 2013Feb 2018Dark Energy Pierre AugerArgentinaOperating (for FNAL)? High Energy Cosmic Rays HolometerMeson LabCommissioningSpring Spacetime

COUPP/PICO Operations Summary Main objective over next 6 months is to continue particulate sampling and understand particulate nucleation of bubbles – Water from both PICO-2L and COUPP60 extracted via filter in early July – Clear evidence for particulates in both, samples sent to PNNL for radioactivity and chemical analysis

COUPP/PICO Operations Summary Test chamber set up at Fermilab to do spike tests, now running at Lab A Testing radon emanation sources now Will do particulate spikes through Aug-Sept

Season 2 started on August 15, 2014! First few nights had excellent seeing (resolution), setting some records ~0.6 ‘’ Two large air conditioners installed and started running to control daytime temperatures. This will further improve seeing. Year 1 data processing is nearly complete. Y1A1 dataset will be released later this Fall. Shortly after that initial public data release will take place. Serendipitous discovery of superluminous supernova. One of several papers to be submitted this Fall from early DES data. Dark Energy Survey Seeing on Aug. 15 Supernova DES13S2cmm Before SNAfter SN Subtraction

Holometer (E-990) Operations Status: Stability is most impacted by low frequency external noise. Recent fixes: Tethered external hut to concrete blocks to reduce wind noise below 5 Hz transmitted into ground motions Tuned feedback loops to add resonant gain at problematic frequencies and reduce gain elsewhere to maintain phase margin Installed laser periscope enclosures designed to reduce turbulent flow of air driven by temperature gradients (and hence reduce refraction noise) 8/25/2014 Design beam intensity already achieved with sensitivity to m/rtHz disturbance amplitude Analysis is underway on 30 minute dataset for first graduate student thesis Focus now on improving operations stability to more easily gather 10’s of hours of data