IETF-74, San Francisco, March 2009 PCE Working Group Meeting IETF-74, March 2009, San Francisco Online Agenda and Slides at: https://datatracker.ietf.org/cgi-

Slides:



Advertisements
Similar presentations
71 th IETF – Philadelphia, USA March 2008 PCECP Requirements and Protocol Extensions in Support of Global Concurrent Optimization Young Lee (Huawei) J-L.
Advertisements

OSPF-TE extensions for GMPLS Control of Evolutive G.709 OTN
Application-Based Network Operations (ABNO) IETF 88 – SDN RG
Page 1 iPOP2009, Tokyo, Japan Selecting Domain Paths in Inter-Domain MPLS-TE and GMPLS Adrian Farrel, Old Dog Consulting Daniel King, Old Dog Consulting.
Page th IETF – Vancouver, December 2007 PCEP Requirements and Extensions for the support of Wavelength Switched Optical Networks (WSON) Young
Page th IETF – Vancouver, December 2007 Framework for GMPLS and PCE Control of Wavelength Switched Optical Networks (WSON) & RWA Information for.
Page th IETF – Dublin, Ireland, July 2008 Framework for GMPLS and PCE Control of Wavelength Switched Optical Networks (WSON) Greg
CCAMP Working Group Online Agenda and Slides at: ccamp Data tracker:
IETF 69, PCE WG, Chicago Encoding of Objective Functions in PCE Communication and Discovery Protocols draft-leroux-pce-of-01.txt J.L. Le Roux (France Telecom)
64th IETF Vancouver November 2005 CCAMP Working Group Online Agenda and Slides at:
CCAMP Working Group 60th IETF San Diego. Agenda (1 of 3) Group Admin (Chairs) –Blue sheets, Minute takers, Admin, WG secretary, Agenda bash (5 mins) –Status.
Page th IETF – Philadelphia, March 2008 Signaling Extensions for Wavelength Switched Optical Networks Greg
71th IETF, Philadelphia, March 2008 ROLL Working Group Meeting IETF-71, March 2008, Philadelphia Online Agenda and Slides at:
CCAMP Working Group Agenda and slides at 59th IETF Seoul.
Page th IETF – San Francisco, CA, March 2009 A Framework for the Control and Measurement of Wavelength Switched Optical Networks (WSON) with Impairments.
CCAMP Working Group Online Agenda and Slides at: Data tracker:
1 IETF-61 – Washington DC Path Computation Element (PCE) BOF-2 Status - CCAMP Co-chairs: JP Vasseur/Adrian Farrel ADs: Alex Zinin/Bill Fenner.
82 nd IETF – Taipei, Taiwan, November 2011 Extensions to Path Computation Element Communication Protocol (PCEP) for Hierarchical Path Computation Elements.
62nd IETF Minneapolis March 2005 CCAMP Working Group Online Agenda and Slides at:
PCE-based Computation Procedure To Compute Shortest Constrained P2MP Inter-domain Traffic Engineering Label Switched Paths draft-zhao-pce-pcep-inter-domain-p2mp-procedures-02.txt.
PCE Traffic Engineering Database Requirements draft-dugeon-pce-ted-reqs-01.txt O. Dugeon, J. Meuric (France Telecom / Orange) R. Douville (Alcatel-Lucent)
Signaling Extensions for Wavelength Switched Optical Networks draft-bernstein-ccamp-wson-signaling-02.txt Greg BernsteinGrotto Networking Young LeeHuawei.
Status of L3 PPVPN Working Group Documents March 2005 – Minneapolis IETF Ross Callon Ron Bonica Rick Wilder.
L3VPN WG IETF 78 30/07/ :00-11:30 Chairs: Marshall Eubanks Danny McPherson Ben Niven-Jenkins.
1 CCAMP Working Group Status Chairs: Lou Berger Deborah Brungard Secretary: Dan King 80th IETF CCAMP WG.
CCAMP WG, IETF 80th, Prague, Czech Republic draft-ietf-ccamp-gmpls-g709-framework-04.txt Framework for GMPLS and PCE Control of G.709 Optical Transport.
PCE-based Computation for Inter-domain P2MP LSP draft-zhao-pce-pcep-inter-domain-p2mp-procedures-00.txt Quintin Zhao, Huawei Technology David Amzallag,
Draft-oki-pce-vntm-def-00.txt 1 Definition of Virtual Network Topology Manager (VNTM) for PCE-based Inter-Layer MPLS and GMPLS Traffic Engineering draft-oki-pce-vntm-def-00.txt.
MPLS WG Minneapolis Agenda bash draft-ietf-mpls-fastreroute-mib has been moved to the MPLS-TP session.
Page th IETF – Chicago, July 2007 Applicability of GMPLS and PCE to Wavelength Switched Optical Networks Greg
79th IETF CCAMP WG1 CCAMP Working Group Status Chairs: Lou Berger Deborah Brungard.
67th IETF San Diego, November 2006 CCAMP Working Group Online Agenda and Slides at: Charter page:
69th IETF, Chicago, July 2007 PCE Working Group Meeting IETF-69, July 2007, Chicago Online Agenda and Slides at: bin/wg/wg_proceedings.cgi.
67th IETF San Diego November 2006 Agenda and WG Status On-line Agenda and Slides at:
70th IETF Vancouver, December 2007 CCAMP Working Group Status Chairs: Deborah Brungard : Adrian Farrel :
Limit for content Do not exceed Limit for content Do not exceed Limit for content Do not exceed Limit for content Do not exceed Page 1 © The.
66th IETF, Montreal, July 2006 PCE Working Group Meeting IETF-66, July 2006, Montreal A Backward Recursive PCE-based Computation (BRPC) procedure to compute.
68th IETF Prague March 2007 Agenda and WG Status On-line Agenda and Slides at:
63rd IETF Paris August 2005 CCAMP Working Group Online Agenda and Slides at:
PCE Database Requirements draft-dugeon-pce-ted-reqs-02.txt O. Dugeon, J. Meuric (Orange) R. Douville (Alcatel-Lucent) R. Casellas (CTTC) O.D de Dios (TiD)
Forward-Search P2P TE LSP Inter- Domain Path Computation draft-chen-pce-forward-search-p2p-path-computation Huaimo Chen
Extensions to PCEP for Hierarchical Path Computation Elements PCE draft-zhang-pcep-hierarchy-extensions-00 Fatai Zhang Quintin Zhao.
ROLL Working Group Meeting IETF-82, Tapei, November 2011 Online Agenda and Slides at: bin/wg/wg_proceedings.cgi Co-chairs:
IDR WG Document Status Update Sue Hares, Yakov Rekhter November 2005.
The Application of the Path Computation Element Architecture to the Determination of a Sequence of Domains in MPLS & GMPLS draft-ietf-pce-hierarchy-fwk-00.txt.
The Application of the Path Computation Element Architecture to the Determination of a Sequence of Domains in MPLS & GMPLS draft-king-pce-hierarchy-fwk-01.txt.
77th IETF – Anaheim, March 2010 PCEP Extensions in support of WSON Signal Compatibility Constraints Young Huawei Greg.
Support for RSVP-TE in L3VPNs Support for RSVP-TE in L3VPNs draft-kumaki-murai-ccamp-rsvp-te-l3vpn-01.txt Kenji Kumaki KDDI Corporation Tomoki Murai Furukawa.
Pseudowire And LDP-enabled Services (PALS) WG Status IETF-92 Dallas Co-Chairs: Stewart Bryant and Andy Malis
177th IETF Anaheim, March 2010 CCAMP Working Group Status Chairs: Lou Berger Deborah Brungard.
67th IETF - San Diego, CA, USA November 8, 2006 PCECP Requirements for support of Global Concurrent Optimization Y. Lee, Huawei, D. King, Aria Networks,
70th IETF Vancouver, December 2007 CCAMP Working Group Online Agenda and Slides at: Charter page:
77th IETF CCAMP Working Group1 CCAMP Working Group Online Agenda and Slides at: Tools start page:
Daniel King, Old Dog Consulting Adrian Farrel, Old Dog Consulting
Path Computation Element Working Group
CCAMP Working Group Status
PCE Working Group Meeting IETF-67, November 2006, San Diego
Daniel King, Old Dog Consulting Adrian Farrel, Old Dog Consulting
PCEP Extensions in Support of Transporting Traffic Engineering Data
Daniel King, Old Dog Consulting Adrian Farrel, Old Dog Consulting
Online Agenda and Slides at:
TEAS Working Group IETF London Online Agenda and Slides:
Path Computation Element WG Status
draft-barth-pce-association-bidir-01
Path Computation Element WG Status
Path Computation Element WG Status
TEAS Working Group IETF 102
TEAS Working Group IETF Prague
PCEP extensions for GMPLS
Presentation transcript:

IETF-74, San Francisco, March 2009 PCE Working Group Meeting IETF-74, March 2009, San Francisco Online Agenda and Slides at: bin/wg/wg_proceedings.cgi Co-chairs: JP Vasseur/Adrian Farrel ADs: Ross Callon/Dave Ward

Agenda - PCE Working Group Meeting - IETF-74 – San Francisco – March ) Administrivia (Chairs) - 5 minutes [5] 2) WG status (Chairs) 5 minutes [10] 3) PCEP Requirements and Extensions for WSON (Young - 5mn) [15] draft-lee-pce-wson-routing-wavelength-02.txt 4) Alternative Approaches to Traffic Engineering Database Creation and Maintenance for Path Computation Elements (Greg - 5mn) [20] draft-lee-pce-ted-alternatives-01.txt 5) The use of SVEC (Synchronization VECtor) list for Synchronized dependent path computations (Itaru Nishhioka - 5mn) [25] draft-ietf-pce-pcep-svec-list-01 6) Status on Extensions to the Path Computation Element Communication Protocol (PCEP) for Point-to-Multipoint Traffic Engineering Label Switched Paths (Dan King - 5mn) [30] draft-ietf-pce-pcep-p2mp-extensions-02.txt 7) PCE-based Computation Procedure To Compute Shortest Constrained P2MP Inter-domain Traffic Engineering Label Switched (Dan King - 10mn) [40] draft-pce-pcep-inter-domain-p2mp-procedures-00.txt (Dan King - 10mn) 8) Requirements for PCE applied in Time-Division Multiplexing (TDM) Networks (Fatai Zhang - 10mn) [50] draft-xx-PCE-reqs-for-TDM-00.txt 9) BGP protocol extensions for Path Computation Element (PCE) Discovery in a BGP/MPLS IP-VPN (Kenji - 10mn) [60] draft-kumaki-pce-bgp-disco-attribute-03

IETF-74, San Francisco, March 2009 Working Group Status Major progress: RFC 5440 :Path Computation Element (PCE) Communication Protocol (PCEP) [AUTH 48] RFC 5441: A Backward Recursive PCE-based Computation (BRPC) Procedure To Compute Shortest Constrained Inter-domain Traffic Engineering Label Switched Paths [AUTH 48] Draft-ietf-pce-dste: Diffserv-Aware Class-Type Object for the Path Computation Element Communication Protocol RFC editor queue: [Pending PCEP] Preserving Topology Confidentiality in Inter-Domain Path Computation Using a Key-Based Mechanism draft-ietf-pce-path-key-05.txt [Pending Path-key and BRPC] Extensions to the Path Computation Element Communication Protocol (PCEP) for Route Exclusions - draft-ietf-pce-pcep-xro-06.txt IESG Review: Encoding of Objective Functions in the Path Computation Element Communication Protocol (PCEP) - draft-ietf-pce-of-06.txt (One DISCUSS) Quick poll: anyone concerned about using normalized bandwidth in the definition of the Minimum Load Path objective function (as opposed to absolute value) ?

IETF-74, San Francisco, March 2009 Working Group Status Waiting for AD to Go-Ahead: Path Computation Element Communication Protocol (PCEP) Requirements and Protocol Extensions In Support of Global Concurrent Optimization - draft-ietf-pce- global-concurrent-optimization-08.txtdraft-ietf-pce- global-concurrent-optimization-08.txt Publication Requested: A set of monitoring tools for Path Computation Element based Architecture - draft-ietf-pce-monitoring-04.txt Applicability of the Path Computation Element (PCE) to Point-to-Multipoint (P2MP) Multiprotocol Label Switching (MPLS) and Generalized MPLS (GMPLS) Traffic Engineering (TE) draft-ietf-pce-p2mp-app-01.txtdraft-ietf-pce-p2mp-app-01.txt Two New Working Group Documents: PCE communication protocol (PCEP) Management Information Base: draft-ietf-pce- pcep-mib-00.txt PCC-PCE Communication Requirements for VPNs: draft-ietf-pce-vpn-req-00 (draft- yasukawa-pce-vpn-req-05)