Report from Accommodation Facilities meeting ACCU A.Rozanov 12.09.2007 1 Outlook Accommodation Facilities meeting 10.09.2007 Patrick Geeraert, Chris Onions,

Slides:



Advertisements
Similar presentations
Users Office News Chris Onions ACCU September 9 th, 2009.
Advertisements

Homeless Respite. Committee Members and Contributors Alachua County Health Dept. Shands St. Francis House Alachua County Poverty Reduction Program North.
ACCU Meeting M. NONIS TS/FM 5th December Buildings Single + washbasin Single + washbasin + Toilet Single + Bathroom Double + washbasin Double +
FAFSA Free Application for Federal Student Aid The main form students use to apply for Federal education grants and loans.
Report from Accommodation Facilities meeting ACCU A.Rozanov Outlook Accommodation Facilities meeting Patrick Geeraert, Chris Onions,
Report from Accommodation Facilities meeting A.Rozanov CERN ACCU ACCU A.Rozanov ACCU A.Rozanov Outlook Accommodation Facilities.
Governing Board for the Inkomati CMA Inaugural Meeting Planning 22 nd September 2005.
Accounts Payable Training Vendor Information & Voucher Preparation Revised 10/16/2014.
Service Management Status 107 th ACCU Meeting 10 March 2015.
Child Care for Users at CERN Cigdem Issever, Maria Chamizo Llatas, Evangelia Dimovasili, Pauline Gagnon, Patricia Conde Muíño for the CERN Child Care Initiative.
1. Contents I. GS Action list following the 98th meeting held on 7 December 2012 II. CERN Hotel III. LS1 i. Increased car fleet IV. Restaurant & Snack.
Freedom of Information Workshop & Briefing 5 th March 2014 Welcome.
Users’ Office News Doris Chromek-Burckhart Head of Users Office Tax Declaration in France and Switzerland Registration of dependant Children of USERs Statistics.
CERNAccommodation Facilities (FAC) meeting A.Rozanov CERN ACCU Outlook Accommodation Facilities meetings Sigurd Lettow, Thomas Pettersson,
1 Community-Based Care Readiness Assessment and Peer Review Team Procedures Overview Guide Department of Children and Families And Florida Mental Health.
Changes of FAS programmes Peter Jurcso HR-RFA. Agenda Background Fellows New subcategories Payment levels and contributions Entitlements Paid Scientific.
Users’ Office News Doris Chromek-Burckhart Head of Users Office New Users’ Office Web Pages Release of Pre-Registration Tool in July 2014 Insurance for.
Housing Service Review Service Report 24 November 2014.
U.S. LHC Users Meeting, Sept.26, 2009 ACCU Report ~ Darin Acosta 1 ACCU Report Darin Acosta (Non-member state representative)
Treasurer’s Workshop Presented by Robert Day and Blanka Caha On September 9 & 13, 2004.
Career Opportunities at CERN for students and recent graduates HBO lectoren visit SIA/CERN/NIKHEF Ingrid Haug Section Leader Students and Associates,
CERNAccommodation Facilities (FAC) meeting A.Rozanov CERN ACCU Outlook Report on Accommodation Facilities meetings Sigurd Lettow, Catherine.
Users’ Office News Doris Chromek-Burckhart Head of Users Office Experience with the new Procedures and Forms Status of the Project for a possible future.
EGEE-II / EGEE-III Transition Meeting 6-7 May 2008 EGEE-III INFSO-RI Enabling Grids for E-sciencE Registration procedure, Computer.
Users’ Office News Doris Chromek-Burckhart Head of Users Office 93rd ACCU Meeting 7. September 2011 Communications PRT – The new Pre Registration Tool.
Homeless Respite Presented by: Diane Dimperio. Committee Members and Contributors Alachua County Health Dept. Shands St. Francis House Alachua County.
M. Tiirakari 9 December2009. CERN regular shuttle services CERN Hostel services and WWW booking Miscellaneous 9 December 2009 M. Tiirakari 2 Summary.
Divisional Managers Commitment to the Diagnostic and Unit Rate Study Consultancy Services for Monitoring of Contractors/Consultants Performance And Establishment.
1.CERN Hotel 2.Mobility 3.Long-term parking 4.AOB 2 Contents.
Arrange simple meetings on demand from Worldspan Go! MEETING SPACE POWERED BY: User Guide.
LCG Generator Meeting, December 11 th 2003 Introduction to the LCG Generator Monthly Meeting.
CERN European Organization for Nuclear Research M. Nonis – ACCU Meeting – 3/12/2008 HOSTEL BOOKING SOFTWARE.
Ian Bird, WLCG MB; 27 th October 2015 October 27, 2015
Users’ Office News Doris Chromek-Burckhart Head of Users Office USER statistics and French cards Child care facilities for small children Tools to assist.
Report from Accommodation Facilities meeting A.Rozanov CERN ACCU Outlook Accommodation Facilities meeting Status of WWW booking.
Users’ Office News Doris Chromek-Burckhart Head of Users Office Changes to Procedures and Forms Action item.
First Indico Workshop Room Booking Alberto Resco Pérez May 2013 CERN.
Users’ Office. 8.December 2015 ACCU meeting - D.Chromek-Burckhart – Users’ Office 2 Users’ Office news Web Site Recognition of Partnership Team Leader.
10 December 2015 – Plenary Session COFUND & CERN: furthering career development opportunities in Big Science Seamus Hegarty, CERN Synergies to fuel Researchers’
CERN - IT Department CH-1211 Genève 23 Switzerland t IT Dept Presentation [September 2009] - 1 User Support - Future Changes in Policy and.
100 th ACCU meeting – 25 Years of ACCU Michael Hauschild - CERN - 4 June 2013, page 1 25 Years of ACCU Some historical view back in time.
CERNAccommodation Facilities (FAC) meeting A.Rozanov CERN ACCU Outlook Accommodation Facilities meeting Sigurd Lettow, Matti Tiirakari,
Service Management Status 104 th ACCU Meeting 03 June 2014.
M. Tiirakari 1 9 September CERN Hostel Service 2 As requested by ACCU and the Management -Implementation of the WWW booking -New deals with hotels.
ChildCare Initiative News Cigdem Issever with input from Pauline Gagnon, Mario Campanelli. for the CERN Child Care Initiative (CCCI)
ARDA Massimo Lamanna / CERN Massimo Lamanna 2 TOC ARDA Workshop Post-workshop activities Milestones (already shown in December)
ACCU Report News and User Issues Darin Acosta (Non-Member State representative) U.S. LHC Users Meeting, Oct.20, 2012ACCU Report ~ Darin Acosta 1.
1.CERN Hotel 2.Mobility 3.Storage 4.Hazardous waste 5.Green spaces 6.AOB 2 Contents.
Thank You For Joining You have been muted when you joined the call. This webinar will be recorded and the PowerPoint deck is available on request. Please.
DIFFERENT APPROACHES TO THE FM CONTRACT M. Nonis TS-FM 1 st TS Workshop – May 2004.
I.GS Action List following the 96 th meeting held on 15 June 2012 II.CERN Hotel III.Shuttle IV.Bicycle entries V.NOVAE snack service improvement VI.Parking.
1.CERN Hotel 2.Mobility 3.AOB 2 Contents B. 38 (In progress) 1.Formulate and implement a safety plan for the whole building (In progress); Replacement.
Housing Service Review Service Report 1 June 2015.
SMB Service Status 114th ACCU Meeting
89th ACCU Meeting 8th September 2010
Accommodation Facilities meeting
José Salicio – Physics Department – User Office
SMB Service Status 117th ACCU Meeting
SMB Service Status 116th ACCU Meeting
SMB Service Status 112th ACCU Meeting
4th FRC meeting, Antti Onnela, CERN-PH-DT
Financial aid Michael frames, Jessica presents.
Report on Housing Service Review meetings
John Gordon, STFC-RAL GDB June 6, 2007
Request for Proposal & Proposal
Room Booking Implementation Faculty Building
Registration of guest users Reimbursement rules Safety rules
Erasmus+ International Credit Mobility
The Billing Process.
Users’ Office News Allianz Health Insurance for MPAs User Statistics
Presentation transcript:

Report from Accommodation Facilities meeting ACCU A.Rozanov Outlook Accommodation Facilities meeting Patrick Geeraert, Chris Onions, Francesco Navarria, Alexandre Rozanov, Gerard Fournier, Mauro Nonis, Bertrand Salami, Michael Poehler, Jose Salicio Diez Scope of the meeting is increased from “Hostel Fund” to include both hostel and office situation of CERN users New hostel in building 41 is operational since June and reimbursement of the loan should be finished in 2008

Report from Accommodation Facilities meeting ACCU A.Rozanov CERN Hostels (M.Nonis) Buildin gs Single + washb asin Single + washba sin + Toilet Single + Bathro om Doubl e + washb asin Double + Bathroo m Handicappe d Flat Total beds doubles1 double254 39__92_24__140 41__91_5 1 single et 1 double _104 Total Price 27 CHF Per room 48 CHF Per room 58 CHF Per room 14 CHF Per bed 64 CHF for 1 person 77 CHF for 2 persons 58 CHF Per room For Single 64 CHF – For double 90 CHF the flat with lounge, kitchen, bathroo m

Report from Accommodation Facilities meeting ACCU A.Rozanov External Hostels (M.Nonis) CERN has an agreement with a private hostel in St Genis (France). CERN looks after the reservation; all other activities are not under Housing Fund’s mandate. Single + Washbasin Single + washbasin + Toilet + shower Number of beds 6021 Rate18.1 euros26.40 euros

Report from Accommodation Facilities meeting ACCU A.Rozanov Occupancy rates (M.Nonis) Buildings 38 and 39 only

Report from Accommodation Facilities meeting ACCU A.Rozanov M. NONIS TS/FM – CERN Accommodation Facilities meeting – BOOKING REQUESTS PROCESSING TIMES (M.Nonis) September 2006 December 2006 – January 2007 June 2007 Requests received per day Requests received per day (beginning of the month) Feed back from Reception 2 days7 days3 days Feed back from Reception (beginning of the month) 3 days15 days5 days

Report from Accommodation Facilities meeting ACCU A.Rozanov Reservation type / category Maximum reservation delay 1 Maximum duration for one single stay Maximum duration of stay, within calendar year Maximum number of beds per visitor Acceptation criteria Building Priority over other reservations Single persons60 days 1 or , 39, 41 Summer students60 days90 days 1 Following list from the HR Dept. 38 Employed members and associates 2 60 days or 2 Concerned Department 38, 39, 41 Students (others)60 days 1 Request from CERN University’s responsible 38, 39 Selection board candidates60 days1 à 2 days---1 Given from the HR Dept. 38, 39, 41 Council members12 months60 days 1 or 2 Via the Council Secretariat 39 Visits60 days From the day before to the day after the visit or 2 List given by the organiser 38, 39, 41 School groups (official visits)60 days From the day before to the day after the visit % 3 List given by the school 38 Experimental weeks 4 / workshops 4 / conferences 4 / VIP visits 12 months From the day before to the day after the conference 60 days30 % 3 List given by the secretariat or the organiser 38, 39, 41 1 – before arrival date 2 – only at beginning of contract 3 – of the total capacity per room type 4 – officially organised by CERN Building 38 :199rooms, 250 beds Building 39 :116rooms, 140 beds Building 41 :98rooms, 104 beds Draft for discussion of RESERVATION RULES (M.Nonis)

Report from Accommodation Facilities meeting ACCU A.Rozanov Possible improvements in hostels Sliding window reservations should avoid peaks in delays near 1 of the moth and beginning of the year Clear written rules for block reservation after discussion with ACCU Clear written rules for current day (waiting) list Reducing the block reservations from 30% to 25%???, 20%???,…. Monitoring of the number of refusals and the number of unsatisfied requests in daily (waiting) lists during two months (October-November 2007) Request from hostel management to give the estimation of the number of beds needed in the hostel during LHC start-up from ACCU side Possibility to increase the number of beds by moving reception, TV rooms, cuisines to building 222 (project to be discussed with ACCU) Restart efforts to get contract with one more external hotel/hostel Reducing delays of reservations reply: 48h request from ACCU side, 3 days current estimate from hostel side WWW booking (next slide)

Report from Accommodation Facilities meeting ACCU A.Rozanov WWW based booking Agreed that it is technically possible and should be introduced It can not be on 100% of beds as some visitors do not have credit cards needed in obligatory field of WWW interface and block reservations Abuses should be limited by credit card guarantee and fees for late cancellations/modifications (details to be discussed) In case of cancellations forced by official changes of schedule, the facility of payment of cancellation fees by team leader account should be available WWW reservations will apply to fixed % of beds. Initial % can be determined from experimental number of credit card users in the past. Ultimately the WWW booking delay should be negligible (at start up ~ 3 days delays are possible) Old non-WWW booking will still work in parallel for remaining beds

Report from Accommodation Facilities meeting ACCU A.Rozanov Office situation Request to increase the number of offices by 500 places in 2006 for LHC experiments 200 places recuperated for LHC experiments in existing buildings in 2006/2007 Discussions of the extension of the building 40 for 300 places with eventual delivery in To be discussed with LHC experiments concerned (ATLAS, CMS). Is there a need for new evaluation of the office space needs in LHC start-up in ?

Report from Accommodation Facilities meeting ACCU A.Rozanov Conclusions Feedback for Blocking Reservation rules will be needed Feedback for WWW reservation rules will be needed Transparencies of Mauro Nonis will be attached to the Agenda (these are only preliminary material for discussion) Estimations of the need of beds (offices) in will be probably needed

Report from Accommodation Facilities meeting ACCU A.Rozanov Additional material