NPDgamma Liquid Hydrogen Target Safety Review Warning Alarms and Interlocks At LANL November 29-30, 2005.

Slides:



Advertisements
Similar presentations
Alarms : Design Technology 4D. Alarms are used for lots of different reasons. Can you think of ways that alarms are used? Warn of fires Warn of Burglars.
Advertisements

(PLEASE SWITCH TO THE SLIDE SHOW MODE)
Carbon Dioxide Systems 1.Carbon dioxide properties 2.Storage 3.Uses 4.Limitations 5.Types of systems 6.Local Application 7.Total Flood.
TROUBLESHOOTING. 5WSS TROUBLESHOOTING ERROR CODEFAULTY INDICATION E1ROOM SENSOR CONTACT LOOSE E2INDOOR COIL SENSOR CONTACT LOOSE E3WATER OUTLET SENSOR.
Technical Explanation Alumina Substrate Heater Resistor on Back Side Two Isolated Conductors Covered with Indium Tin Oxide Thin Film on Front Side Resistor.
FoamPro 1600 Series Fully automatic Class A foam ONLY
Research Activities of HFCV in Korea Speaker : Economy : The Republic of Korea.
Dangers of Hydrogen Sulfide at Pump Stations Louisiana DEQ September 2012.
Definitions. 7 Class A –Wood, plastic and rubber Class B –Flammable liquids and gas Class C –Energized electrical Class D –Flammable metals Per NFPA statistics,
Providing services that help make The University of Memphis a safe and healthful place to learn and work Environmental Health and Safety.
Clean Air Box Usage & Care CABs RAMs CO Monitors.
MSA - ALTAIR 4X Gas Meter.
ODH Fans and Work Planning Protecting Against the Big Event 10 Questions Before Starting a Job at C-AD Photo of the Week Collider-Accelerator Department.
Review of Helium Venting Analyses
Bmd Crossvent 3.
NPDgamma Liquid Hydrogen Target Safety Review Project and Safety At LANL November 29-30, 2005.
H2 Safety Review - response paul drumm MICE VC, March 29 th,2006.
Hydrogen R&D system HAZOP and failure analysis Yury Ivanyushenkov, Elwyn Baynham, Tom Bradshaw, Mike Courthold, Matthew Hills and Tony Jones.
C. Lu, RPC Gas Slow Control Workshop, 7/15/2008, Dongguan, China 1 1 Some thoughts on RPC gas system slow control (Dongguan, 7/15/2008) Changguo Lu Princeton.
Gas Sensor and Transmitter
Altair® 5X MultiGas Detector Altair® 5X MultiGas Detector The ALTAIR 5X MultiGas Detector is to be used when performing a hazard assessment.
Computer Process Control Application. Computer process control In computer process control, a digital computer is used to direct the operations of a manufacturing.
Water Handling Operations
NPDgamma Liquid Hydrogen Target Safety Review At LANL November 29-30, 2005.
Patrick Thornton, SNS/FPE June 9, 2008
The Board of Governors of Exhibition Place June 2008 ENERGY ACTION PLAN.
MICE Hydrogen Control System MICE H2 Review Meeting RAL 15 th Jan 2015 PJ Warburton – STFC Daresbury Lab.
NPDGamma - LH2 Target - Relief/Ventline Systems Seppo Penttila NPDGamma Project Manager Predicted A  =5x10 -8 We are aiming to 10% measurement.
B757 Review Questions.
ELECTRICITY. Electric Current  Currents are the rate that electricity flows thru a wire  2 types of currents:  Alternating Current (AC) electricity.
 P&I Diagram  Gas Room Controls  Gas Panels Controls in the Hall  GUI  Oxygen Sensor Cart.
The 2nd NPDGamma Experiment Safety Review - Liquid Hydrogen Target Seppo Penttila NPDGamma project manager June 09, 2008 SNS.
Ventilation of the LH2 Target GHS In MPF-35: The target gas handling system (GHS), target cryostat, and part of the vent stack are covered by a tent that.
MICE Hydrogen Control System MICE Collaboration Meeting CM33 27 th July 2012 PJ Warburton – STFC Daresbury Lab.
Control & Monitoring System Update Contributors: Brian Martlew - Daresbury Laboratory - STFC James Leaver - Imperial College Pierrick Hanlet - Fermilab.
Conceptual Design Review of the NPDGamma Experiment in Beam Line 13 Seppo Penttila NPDGamma project manager September 25, 2007 at SNS.
CEDAR PMT Array DCS (Tim). Summary Summary of DCS monitored parameters based on original scheme – Major part of heat dissipation in electronics / PMTs.
Hydrogen Pre-Operation Safety Review 4 th October 2011 Results from Helium Commissioning M Hills.
Safety Talk 9 / 1 Safety Talk 9 Safe Operation of Fired Heaters: start-up.
Eric Thomas - Safety systems for LHC experiments 1 Safety Systems for LHC experiments Baseline specifications – Additional needs – Actions taken.
MICE Hydrogen Control System MICE Safety Review Meeting 4 th Oct 2011 PJ Warburton - Daresbury Lab.
NPDgamma Liquid Hydrogen Target Safety Review Operating Procedures At LANL November 29-30, 2005.
01/10/ PHOS Cooling status (1 Oct) Incident happened (ECV failure) 1 Oct at 5 Am cooling plant failure happened: ECV (electrical.
Detecting Instruments (For Contest Work Only) MSA Passport Personal Alarm.
Interactive Control in Engineering Projects Electronics and Control.
1 Daya Bay RPC Gas Safety System - Gas Cabinet Test Report Changguo Lu, Kirk McDonald Princeton University (October 11, 2009)
Carburetors & Fuel Injection 1.Describe the major parts of fuel injection. - Air cleaner, mass air flow sensor, injector, pressure regulator, electric.
Matter.
The LH2 target has to be in the para-hydrogen state. At room temperature H2 is 75% ortho and 25% para. To catalyze the conversion between ortho and para.
SCH Controls Readiness Review: Site SCH Controls Readiness Review: Site UNIQUE HAZARDS: Significant fields in adjoining magnet cells Magnetic field.
EDM in ER2 at LANSCE Jan Boissevain LANSCE ER-2 Stake Holder Meeting
Structure Gas Monitoring Requirements in 27 CCR Glenn K. Young, P.E. Senior Waste Management Engineer Closed Illegal & Abandoned Sites.
Inspections. Structural Evaluation Look for any movement, check alignment, bowing, cracks, separation Basement wall/foundation Check floors & ceiling.
Means of Egress Don Ebert- Risk Manager (509)
BASIC AUTOMATIC CONTROLS UNIT 16 ADVANCED AUTOMATIC CONTROLS
UITF ODH Assessment UITF Safety Review May 10, 2016.
Purgers and Non-condensables “What are they and why should I care?” Refrigerating Specialties Division Parker Hannifin Corporation July 2004.
TYPE “HOS” 6” Stroke Compressor & Ancillary Equipment
MSA Passport  Personal Alarm Combustible gases and vapors Oxygen enriched Oxygen deficient Specific Toxic gases Alarm levels are set at the factory.
UTILITIES MANAGEMENT.
Steam Generation In any industrial process, large quantities of steam are consumed. If natural gas is used to heat the boiler water it is often advisable.
Hierarchy of Controls More than PPE.
HAZOP Guidewords Base Set
Operation of Target Safety System (TSS)
NPDgamma Liquid Hydrogen Target Safety Review
Dräger X-am 5000 / X-am 5600 VIDEO BASIC TRAINING
Risk Management Student Powerpoint
ODH Monitoring System Yong Kian Sin Personnel Safety System
Presentation transcript:

NPDgamma Liquid Hydrogen Target Safety Review Warning Alarms and Interlocks At LANL November 29-30, 2005

A Plan is to have three-tiered hierarchy of status indicators for the system: Normal: The system operating as designed with all interlocks and sensors active and within set ranges. Warning: - Some sensor(s) are at values between low and high trip points. Local indication (target computer gives warning). - Target operator attention is required but automatic shutdown action is not needed. Alarm: - Some sensor(s) have exceeded their high trip levels. - Automatic safety and/or shutdown systems take over. - Local indications; horn and flashing light on FP12, area alarm at ER2/ER1, CCR has alarm and CCR gives alarm announcement at Lujan - All personnel should leave ER1/ER2.

SensorLocationTrip pointAction H 2 concentration #1 H 2 concentration #2 Shed or FP12 cave, in stagnant air near ceiling GHS tent or enclosure 10% of LELWarning H 2 concentration #1 H 2 concentration #2 Shed or FP12 cave, in stagnant air near ceiling GHS tent or enclosure 25% of LELAlarm. H 2 system shutdown and H 2 dump. Electrical power to cave shut off. Vacuum pressure sensorVacuum vesselHigher than set pointWarning RGAVacuum vesselHe peak > Low set pointWarning RGAVacuum vesselHe peak > High set pointAlarm. H 2 system shutdown and H 2 dump. RGAVacuum vesselN 2 peak > Low set pointWarning RGAVacuum vesselH 2 O peak > Low set pointWarning He source pressure for channels Helium channelsp < 3 psigWarning He flow out from channels Helium channelsFlow < set pointWarning H 2 pressureTarget H 2 gas in exhaust line p > 16 psig, p < 9 psigWarning O 2 concentrationShed or at FP12 cave, at normal breathing space elevation LowWarning