First Mercury Test by Stuart Walker. Original Setup.

Slides:



Advertisements
Similar presentations
Air and Water Chiller Basic Class
Advertisements

TROUBLESHOOTING. 5WSS TROUBLESHOOTING ERROR CODEFAULTY INDICATION E1ROOM SENSOR CONTACT LOOSE E2INDOOR COIL SENSOR CONTACT LOOSE E3WATER OUTLET SENSOR.
RISER SETUP NOTE: All levels of the riser are connected using the same method:
Oak Ridge SNS Experimental Facilities X /arb 1 SNS MPS Review Target-MPS Review WBS Ron Battle Target Controls, Target Systems Experimental.
Practical Labs ImpedanceWeighing Air Compression & ExpansionCompressionBoiling Point Versus Pressure.
1 Chapter 6 Gases 6.6 The Combined Gas Law. 2 The combined gas law uses Boyle’s Law, Charles’ Law, and Gay-Lussac’s Law (n is constant). P 1 V 1 =P 2.
Target System Operations and Hg Handling P.T. Spampinato V.B. Graves MERIT Hg System Safety Review CERN June 19-20, 2006.
Reservoir LVAD PVS / Booster Physiological Simulator Valve Automated Resistance Valve Three Loops Blood Extraction Standard Pressure Sensor Temperature.
Matthew Hills Hydrogen System – Piping and Instrumentation Diagram.
PRELIMINARY TEST PLANS 6/30/2015 Detailed Design Review 1.
Gas Law Relay Races! Chapter 14.2.
US ITER TBM Meeting Idaho Fall, Idaho, Aug M Dagher P Fogarty 1.TBM/ITER General Arrangement 2.Equatorial Test port Configuration 3.Test Port.
MINIATURE ENGINEERING SYSTEMS GROUP MINIATURE CENTRIFUGAL COMPRESSOR TESTING Presented by Dipjyoti Acharya.
The Problem The Problem
Water Supply Skill Drills.
Chiller basics With Phil Rodin. Things to check when chiller is not running or is in alarm.
Heating Experiments Objective : Check uniformity of heating.
Engineer Training Cooler TJ8300 / TJ8500 Cooler. Engineer Training Cooler TJ8300 / TJ8500 Confidential 2 Introduction.
FROST I Site Initiation Visit version 1.4. IVTM System.
Mercury Spill Response Instrumentation. Mercury Vapor Analyzers Jerome 431-X MVA (gold film) Lumex 915+ MVA (Atomic Absorption) Jerome J405 MVA.
EMISSION PROBE PARTS TUBE: 3/8” OD x wall Stainless Steel Length determined by pipe diameter and placement of connecting end to allow easy connection.
Tritium Extraction from a DCLL Blanket Prepared by: Scott Willms (LANL) Collaborators: Brad Merrill (INL), Siegfried Malang (Consultant), Clement Wong.
Cooling System. 1. List the basic parts of a cooling system: -Thermostat -Fan -Water pump -Radiator -Ethelyne glycole -Shroud.
9.26 Assume that you have a sample of gas in a cylinder with a movable piston, as shown in the following drawing: Redraw the apparatus to show.
SCIENCE Test 1: Passage 6.
1 Chapter 11 Gases 11.7 Volume and Moles (Avogadro’s Law) Copyright © 2008 by Pearson Education, Inc. Publishing as Benjamin Cummings.
Thomas Jefferson National Accelerator Facility Page 1 Clear Mold VPI Visualization D. Kashy S. Christo May 14, 2014.
FC Flow Control: Centrifugal pump with constant speed (rpm) Orifice plate sensor Globe valve FC Flow Control: Positive displacement pump Orifice plate.
Claudio Bortolin 03/09/2012. SPD (RP analyses required) 1) Pump 17b replacement and leak test 2)Pressure test on the old inlet lines (technicians coming.
LSU Petroleum Engineering Research and Technology Transfer Laboratory “The Well Facility”
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
Carburetors & Fuel Injection 1.Describe the major parts of fuel injection. - Air cleaner, mass air flow sensor, injector, pressure regulator, electric.
WP4: Instrumentation Tânia Melo Mendonça. 2 ISOLDE target unit Present target unit base at ISOLDE with 7 inlets (including ion source gas leak, heating.
Original CPC Box schematic
2/17/2016 Recycler -Gattuso Recycler Shut Down Status  Flying Wire Status  Wire Vacuum Certified  Tunnel Bake Prep status Disconnection of BPM, Correctors,
Vacuum Pumps. Vacuum Pump Safety Physical and Chemical Hazards – Always vent pump exhaust – Keep pump away from flammable.
MAGNET#1MAGNET#2MAGNET#3 SATELLITE VB#1 SATELLITE VB#2 SATELLITE VB#3 PRECOOLER#1PRECOOLER#2 DISTRIBUTION VALVE BOX DVB CP#1CP#3CP#2 BUFFER DEWAR LHe 5m.
ELLIPTICAL HEAD PROTECTING COVER 01_INSTRUCTION DISCONNECTING THE ELLIPTICAL HEAD.
Development of a Murine Perfusion System Nicola Asgill Fredrick Hilliard George Kittos.
STEP 1 Locate the transmission cooler line connection on the vehicle. Identify the correct adapters to be used by referring to the vehicle application.
Chapter 20 Review Gases Why is mercury used in a barometer? It’s density. Mercury is a dense liquid. Tube only needs to be 76 cm.
Date of download: 6/23/2016 Copyright © ASME. All rights reserved. From: Heat Transfer and Pressure Drop Analysis of Chilled Water and Ice Slurry in a.
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
Replacing hydride bed with bottle Advantages No risk of diminished bed capacity Following jobs no longer necessary – Move pressure gauge – Replace cracked.
AD ops. - NUMI July 7, 2006 Jim Hylen/FNAL Page 1 Had been having problem with water collecting in tank under horn 1, instead of coming back to surge tank,
Date of download: 10/13/2017 Copyright © ASME. All rights reserved.
Absorber progress MICE-ISIS review of the liquid hydrogen system will be held in early January; guidance from Nominated Engineers on the imported absorber.
FIGURE 27–1 A PCV valve in a cutaway valve cover, showing the baffles that prevent liquid oil from being drawn into the intake manifold.
How to avoid melt-down of your Solar Heating System
Fault Screen (“FAULT”)
Date of download: 10/25/2017 Copyright © ASME. All rights reserved.
Date of download: 11/3/2017 Copyright © ASME. All rights reserved.
LARP Vertical Test Facility
Date of download: 11/8/2017 Copyright © ASME. All rights reserved.
Hydraulics and Hydrology Siphon Equilibrium versus flow 11/30/2017 Marek Rudnicki, Warsaw University of Technology 2 content.
Date of download: 12/30/2017 Copyright © ASME. All rights reserved.
Jie WANG;Zuohua HUANG ;Bing LIU;Xibin WANG;
Effective Methods to Test the Fuel Pressure Regulator in your Car.
Detector Technology Group
Chapter 6 Gases 6.6 The Combined Gas Law.
SB Packing Automatic Downpuller Power Unit
זכויות סוציאליות.
Forced draft cooling tower. NumberingEquipment A-1Storage Tank B-2Temperature sensor C-3Pump D-4Ball valve E-5Rotameter F-6Cooling water from the tank.
November technical stop activities:
Instructions: Adding refrigerant fluid to system
SNS PPU Cryomodule Instrumentation
SNS PPU Cryomodule Instrumentation

SC1R Cold Box PDR Assembly Sequence

Presentation transcript:

First Mercury Test by Stuart Walker

Original Setup

Preliminary Prep Work

Data Acquisition

Primary Pump

Matthew Deep in Contemplation

Bo Pumping First Bottle of Hg

Waiting for Hg to Pump

Switching Hg Bottles

Pumping Second Bottle

Hg Slugs in Tubing

Lifting Pump to Remove Hg from Tubing

Removing Tubes from Pump and Vessel

Determining Vessel Mass

Setting Up Pressure Sensor

Helium Charge

Helium Tank While Charging

Data Acquisition

Helium Charging

Helium Disconnect

Everyone Performing Their Duties

Helium Disconnect

Attaching Thermocouple

Attaching Tygon Tubing

Checking Temperature Controller Settings

Completing Temperature Control Flow Loop

Hg Cleanup From Pump

Hg Cleanup From Catch Pans Using Hg Vacuum Pump