CE 3372 Water Systems Design Lecture 18: Storm sewers, inlets, conduits and related hydrology and hydraulics.

Slides:



Advertisements
Similar presentations
Hydrologic Analysis Dr. Bedient CEVE 101 Fall 2013.
Advertisements

1 Urban Drainage System Analysis & Design CEVE 512 Hydrologic Design Lab Spring 2011.
1 CTC 261 Hydraulics Storm Drainage Systems. 2 Objectives Know the factors associated with storm drainage systems.
Qabatia Storm Water Sewer System
CE 3372 Storm Sewer Conduit, Junctions, Inlets. Storm Sewers 0 Inlets capture stormwater 0 Junctions connect laterals to trunk lines. 0 Conduits (pipes)
DES 606 : Watershed Modeling with HEC-HMS Module 12 Theodore G. Cleveland, Ph.D., P.E 29 July 2011.
Urban Storm Drain Design: Curb inlets, on grade & sag
Using HEC-1 for Subdivision Runoff Detention Pond Design Stacie Kato April 26, 2004.
Soil Conservation Service Runoff Equation
Introduction to Surface Water Hydrology and Watersheds Lecture 1 Philip B. Bedient Rice University November, 2000.
CE 515 Railroad Engineering
Hyetographs & Hydrographs
Design of Hydraulic Controls & Structures
Culvert Hydraulics using the Culvert Design Form
Drainage System Design and Layout. Design Process Flowchart Background Information (Soils, Topo, Crops) Confirm Outlet Drainage Needed Select DC, Spacing.
Design of Open Channels and Culverts CE453 Lecture 26
Design of Open Channels and Culverts
1 Time of Concentration. 2 Objectives Know how to calculate time of concentration Know how to calculate time of concentration Know why it’s important.
CE 3372 Water Systems Design
CE 3372 Water Systems Design
The Objectives of storm water drainage To prevent erosion in hillside areas (paved roads and terracing are needed) To prevent land-slides To improve the.
Reading: Applied Hydrology, Sec 15-1 to 15-5
Surface Drainage CE 453 Lecture 25.
1 Urban Drainage and Intersection Design Image:
Things that Happened Before You were Born (The earth and SWMM were created) a story by Dr. Larry A. Roesner, Ph.D.,P.E. based (loosely*) on biblical quotes.
CTC 450 Review 1  WW Characteristics. Objectives 2  Understand the basics of storm drainage systems  Understand the basics of sewer systems.
Join us on Twitter: #AU2013 CI1550 Hydraulics and Hydrology: The Water Resource Tools Available in Autodesk® Infrastructure Design Suite Dino Lustri, P.E.,
STEP 3: SITING AND SIZING STORM WATER CONTROLS Section 6.
CE 3372 Inlets, Junctions, Conduits
CE 3372 Water Systems Design
Urban Storm Drain Design: Rainfall-Runoff relations.
Urban Storm Drain Design: Pump Station Design. Purposes To lift stormwater to higher elevation when discharge of local collection system lies below regional.
GUTTERS and INLETS Gutter : A gutter is a triangle open channel along the curb stone of streets which carry the storm water along streets to inlets. Inlets.
Term Project Presentation CE 394K.2 Hydrology Presented by Chelsea Cohen Thursday, April 24, 2008.
Nathan Davis Steven Reid Kristen Ulmer Graduate Assistant: Nathan Dye.
STORMWATER MANAGEMENT
An-Najah National University Engineering College Civil Engineering Department Project title : Management of stormwater for a portion of Faisal street “Nablus”
Urban Storm Drain Design: Conduit design. Sizing Conduit size is computed based on the discharge expected at the upstream node; Typically is done by the.
Basic Hydraulics: Culverts – I
Basic Hydraulics: Channels Analysis and design – I
CE 3372 Water Systems Design Lecture 17: Storm sewers, inlets, conduits and related hydrology and hydraulics.
Basic Hydraulics: Open Channel Flow – I
CE 3354 Engineering Hydrology
CE 3372 Water Systems Design
Basic Hydrology & Hydraulics: DES 601
CE 3372 Water Systems Design
Things that Happened Before You were Born (The earth and SWMM were created) a story by Dr. Larry A. Roesner, Ph.D.,P.E. based (loosely*) on biblical quotes.
Urban Stormwater Management D Nagesh Kumar, IISc Water Resources Planning and Management: M8L6 Water Resources Systems Modeling.
Watershed Modeling using HEC-HMS and EPA-SWMM ©T. G. Cleveland, Ph.D., P.E. 25 July 2012 Lesson 14.
CTC 450 Review 1  WW Characteristics. Objectives 2  Understand the basics of storm drainage systems  Understand the basics of sewer systems.
Glenn E. Moglen Department of Civil & Environmental Engineering Virginia Tech Course Introduction, the Rational Method, and Inlet Design CEE 5734 – Urban.
Sanitary Engineering Lecture 7
Stormwater Conveyance Design 1
CE 3372 Water Systems Design
CE 3372 Water Systems Design
Water Drainage System Harris County, TX
Dino Lustri, P.E., P.S., ACI Design Supervisor
CTC 450 Review WW Characteristics.
Storm Sewer Assessment for South Newport Subdivision
CE 3372 Water Systems Design
Coursework guidelines
CE 3372 Water Systems Design
Basic Hydrology & Hydraulics: DES 601
Detention Pond and Channel Stabilization for Bartholomew Park
Time of Concentration.
CTC 261 Hydraulics Storm Drainage Systems
Jered Carpenter Region 3 Roadway Design
Hyetographs & Hydrographs
Culvert Hydraulics using the Culvert Design Form
Love Field Modernization Program
Presentation transcript:

CE 3372 Water Systems Design Lecture 18: Storm sewers, inlets, conduits and related hydrology and hydraulics

Storm Sewers Inlets to capture runoff Conduits to convey to outfall – Lift Stations if cannot gravity flow to outfall – Detention and diversions Outfall release back into environment 2

Storm Sewer Systems Lift Station Inlets Conduits Lift Station

Storm Sewer Inlets Spread width Combination Inlet – Curb+Grate Carryover – Flow that passes beyond the inlet (none in this picture – complete capture) 4

Storm Sewers Inlets capture stormwater Junctions connect laterals to trunk lines. Conduits (pipes) convey water to outfall

Design Flow A design flow is the anticipated discharge for a specified AEP. – Typically 2-yr – 5yr AEP for subdivision type of drainage. – 50-yr for major highways Storm sewers may have extra capacity (ability to convey more than the design flow) – but are not expected to completely drain during flows in excess of design flow.

Conduit Sizing Determine design flow required for a conduit (hydrology and continuity) ASSUME pipe will be full (but not pressurized) – apply Manning’s equation to solve for diameter

Inlet Sizing Determine allowable depth at inlet – Consider ponded width at the inlet – Hydrology to determine discharge that the inlet(s) must capture Apply appropriate equation(s) to size inlet to achieve complete or partial capture. – Partial, then need to route carryover to next downstream inlet.

Inlet Sizing Alternative is to determine capacity of inlets of known sizes (10-foot, 15-foot, …) Then apply hydrology to determine the area that the inlet can serve – Assumes you will grade that entire area to drain to the inlet.

Junctions Junctions are to connect pipes – Use drops to control velocity – Use to change pipe sizes – pipes get bigger moving downstream.

Example 3 drainage areas -> 3 inlets 4 conduits to outfall 0.5 Acres S=0.006 Parking 0.5 Acres S=0.006 Parking 1.2 acres S=0.006 Grass 1.2 acres S=0.006 Grass 1.73 acres S= Residential 1.73 acres S= Residential 200 ft 300 ft 400 ft 600 ft

Inlets Suppose all will be curb-on-grade Cross slope in streets is 2% (typical). Longitudinal slope is 0.5%. Allowable depth is 6-inches. Design AEP is 2-yr Calculate capacity for 5 foot, 10 foot, and 15 foot inlets.

Inlets

5 foot = 1 CFS 10 foot = 3.36 CFS 15 foot = 6.63 CFS

Inlet Hydrology Compute Tc for each area to each inlet location – About 1.5 ft/sec for the parking lot. – About 0.5 ft/sec for the grass area. – The residential would be between – 0.75 ft/sec.

Inlet Hydrology Parking lot

Inlet Hydrology Grass Area

Inlet Hydrology Residential

Inlet Hydrology Inlet Times – Grass = 10.8 minutes – Parking Lot = 10 minutes – Residential = 10 minutes Runoff Coefficients – Grass = 0.35 – Parking Lot = 0.95 – Residential = 0.50

Inlet Hydrology

Conduit Design 4 conduits to outfall 0.5 Acres S=0.006 Parking 0.5 Acres S=0.006 Parking 1.2 acres S=0.006 Grass 1.2 acres S=0.006 Grass 1.73 acres S= Residential 1.73 acres S= Residential 200 ft 300 ft 400 ft 600 ft

Conduit Design Conduit #1 – 200 ft – Q = 3.23 cfs Diameter: – 1.15ft 0.5 Acres S=0.006 Parking 0.5 Acres S=0.006 Parking 200 ft

Conduit Design Conduit #2 – 300 ft – Q = 2.86cfs Diameter: – 1.1 ft 1.2 acres S=0.006 Grass 1.2 acres S=0.006 Grass 300 ft

Conduit Design Conduit #3 Takes flow from 1 and 2 Use accumulated Tc and C*A to approximate arrival time for different peaks 400ft Q=5.46 cfs D=1.46ft 0.5 Acres S=0.006 Parking 0.5 Acres S=0.006 Parking 1.2 acres S=0.006 Grass 1.2 acres S=0.006 Grass 200 ft 300 ft 400 ft

Conduit Design Conduit #4 Takes flow from 3 and Residential Use accumulated Tc and C*A to approximate different peak flow arrival times 600 ft Q =10.7 cfs D =1.81 ft 0.5 Acres S=0.006 Parking 0.5 Acres S=0.006 Parking 1.2 acres S=0.006 Grass 1.2 acres S=0.006 Grass 1.73 acres S= Residential 1.73 acres S= Residential 200 ft 300 ft 400 ft 600 ft

Conduit Design Then specify nominal pipe sizes – Conduit #1= 1.15 ft (13.8 inches) Use: 16inch – Conduit #2= 1.1 ft (13.1 inches) Use: 16 inch – Conduit #3= 1.46 ft (17.5 inches) Use: 18 inch – Conduit #4= 1.81 t (21.7 inches) Use: 24 inch Set elevations (assumed slope in the example – but it would depend on the outfall invert elevation) Check hydraulics if outfall is not a free drop.

Conduit Design Trickiest part is to accept the accumulating C*A value in rational method. As we move downstream in the network, the pipes are “outlets” for a watershed that is comprised of ever increasing area and Tc. The method is an approximation to account for different arrival times of the peaks from different parts of the watershed

Conduit Design Check hydraulics using SWMM – Steady if the outfall is free (drops) – Dynamic if outfall is submerged (backwater)