6 January 2016Conformity Boot Camp1 Boot Camp Edge / Enterprise Conformity.

Slides:



Advertisements
Similar presentations
SG-Systems Boot Camp Use Case Process with TOGAF AMI-ENT Example Kay Stefferud Chair, SG-Systems Use Cases For more information visit:
Advertisements

SG Communications Boot Camp November 19th, Agenda 3:30 – 3:40 – Welcome and Introductions 3:40 – 4:00 – Review scope and charter of SG Communications.
May 2010 Slide 1 SG Communications Boot Camp Matt Gillmore 03/07/11.
Draft February 2010 OpenHAN TFSlide 1 Submission Title: OpenSG San Francisco Opening Report Date Submitted: February xx, 2010 Source: OpenHAN Task.
September 30, 2011 OASIS Open Smart Grid Reference Model: Standards Landscape Analysis.
Centers for Medicare & Medicaid Services eXpedited Life Cycle (XLC) [Insert Project Name] Preliminary Design Review (PDR) [Insert Date of PDR] [Insert.
e-Framework Components and Responsibilities.
Smart Grid - Cyber Security Small Rural Electric George Gamble Black & Veatch
Understand Web Services
© 2010 EnerNex Corporation. All Rights Reserved. CIM Test Development Process EPRI Project January 2011.
Testing Framework TST 15 Source: Laurent Velez, ETSI, Meeting Date: TST Testing_framework.PPT.
Security Conformity March 10, 2011 SF Bay Area. Agenda for Thursday, March 10th Discuss Security Testing & Certification Authority Review Security Testing.
System Design/Implementation and Support for Build 2 PDS Management Council Face-to-Face Mountain View, CA Nov 30 - Dec 1, 2011 Sean Hardman.
IPRM Overview Zahra Makoui SG Conformity Vice Chair March 2011 Source: SGIP SGTCC
Chapter 6 System Engineering - Computer-based system - System engineering process - “Business process” engineering - Product engineering (Source: Pressman,
Engineering, Operations & Technology | Information TechnologyAPEX | 1 Copyright © 2009 Boeing. All rights reserved. Architecture Concept UG D- DOC UG D-
© 2007 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Communicating over the Network Network Fundamentals – Chapter 2.
13 September 2015 AllSeen Alliance 1 C&C Working Group Meeting 16 JULY 2014.
Green Button Initiative GREEN BUTTON DOWNLOAD MY DATA CERTIFICATION DRY RUN Marty Burns, John Teeter for NIST, Kay Clinard UCAIug.
© 2008 GS1 1 Certification Framework Certification Framework Document Operations Manual Team 7: Deliverables.
McLean VA, May 3, 2010 SG Systems Systems Requirements Specification Approach Overview.
Overview of existing assessment schemes Rolf Bienert, John Lin.
A2LA IT Program Update 2008 Assessor Conclave. A2LA IT Accreditation Scope - Any aspect of a hardware and or software environment that is under test Scope.
11 August 2010Abstract Test Cases 1 Abstract Test Case Development Phil Beecher (BCC) Edge / Enterprise Conformity.
SG Communications Sessions Tuesday, October 20th, 2009.
Proposal for device identification PAR. Scope Unique per-device identifiers (DevID) Method or methods for authenticating that device is bound to that.
Draft Edge Conformity TG DraftSlide 1 Submission Title: OpenSG San Francisco Abstract Test Cases Date Submitted: February 3, 2010 Source: Edge Conformity.
A Temporal Quiz ” I’m the beginning of the end. You see me twice in a week, but not in a day. Once in a year, but twice in a decade. What am I ?”
OpenSG Conformity IPRM Overview July 20, ITCA goals under the IPRM at a high level and in outline form these include: Organize the Test and Certification.
DOCUMENT #:GSC15-PLEN-51 FOR:Presentation SOURCE:ITU AGENDA ITEM:Plenary 6.10 Conformance and Interoperability Testing.
OpenSG Status UCAIug Members Meeting Chris Knudsen – Chair Gary Stuebing – Vice-Chair November 9 th, 2009.
SAIF Effects on Interoperability Reviews WG Baris E. Suzek May, 11, 2010.
© 2007 Cisco Systems, Inc. All rights reserved.Cisco Public ITE PC v4.0 Chapter 1 1 Communicating over the Network Network Fundamentals – Chapter 2.
Knoxville, TN October 20, 2009 SG-Systems Systems Requirements Specification Team Status and Breakout Session.
STEP Tutorial: “ Fundamentals of STEP” David Briggs, Boeing January 16, 2001 ® PDES, Inc NASA STEP Workshop step.nasa.gov.
# 1 AMI Enterprise Task Force of the Utility AMI Working Group SRS Team Plan Discussion For further information, contact Joe Zhou Team Lead
Boot Camp - Conformity July 19, 2010 Detroit, USA.
What is Enterprise Architecture March Enterprise Architecture Architecture –the fundamental organization of a system, embodied in its components,
The Marine Stewardship Council: A Multi- Stakeholder Fisheries Assessment Programme for Sustainable Fisheries Oluyemisi Oloruntuyi (MSC)
LO-5: Testing Lecturer: Ricardo Gonçalves. 2 Testing Overview Conformance Testing –Definition –Methodologies –Application Architecture Interoperability.
Draft Edge Conformity TG Draft Slide 1 Submission Title: OpenSG San Francisco Opening Report Date Submitted: January 28, 2010 Source: Edge Conformity Task.
Draft Edge Conformity TG Draft Slide 1 Submission Title: OpenSG McLean Opening Report Date Submitted: May 2, 2010 Source: Edge Conformity Task Group Re:
SG-Systems Working Group Status: Active, meet once at each face-to-face meeting Charter: The SG-Systems Working Group defines requirements, policies, and.
Colombo, Sri Lanka, 7-10 April 2009 Need of Interoperability “within” an NGN – An approach Rajeshwar Dayal, Director Dept. of Telecommunications, India.
OpenSG SG Conformity – Security Conformity July 22, 2010 Bobby Brown.
SAIF Effects on Interoperability Reviews WG Baris E. Suzek May, 25, 2010.
GP Confidential GlobalPlatform’s Modular Approach to its Compliance and certification.
DOCUMENT #:GSC15-PLEN-79 FOR:Presentation SOURCE:TTC AGENDA ITEM: GSC Plenary 6.10 GTSC 4.1 NGN interoperability -
May 2010 Slide 1 SG Communications Boot Camp Matt Gillmore 11/1/2010.
IPDA Architecture Project International Planetary Data Alliance IPDA Architecture Project Report.
Jeju, 13 – 16 May 2013Standards for Shared ICT Smart Grids activities in ETSI Presenter: Adrian Scrase ETSI Chief Technical Officer (CTO) Document No:
Name/Title of Your App Prepared by: …… For the 5 th National ICT Innovation Competition.
Washington, D.C., U.S.A May Some concepts of systems architectures Industrialization of statistics and software architecture Study cases.
Communicating over the Network
ATIS Cybersecurity DOCUMENT #: GSC13-GTSC6-12 FOR: Presentation
Validation & conformity testing
Communicating over the Network
Communicating over the Network
SysML 2.0 Interface Concepts Modeling Core Team Status Update
Communicating over the Network
Communicating over the Network
Communicating over the Network
Validation in INSPIRE Webinar on a new Test Registry & Repository 26/05/2015 Robin S. Smith & Michael Lutz.
Boot Camp - Conformity March 7, 2011 SF Bay Area.
doc.: IEEE <doc#>
Communicating over the Network
Communicating over the Network
Layered Tasks.
SG Communications Boot Camp
Midterm Reference Points
Presentation transcript:

6 January 2016Conformity Boot Camp1 Boot Camp Edge / Enterprise Conformity

6 January 2016Conformity Boot Camp2 Edge / Enterprise Conformity Activity Certification Process Reference Manual Test Methodology and Abstract Test Cases

6 January 2016Conformity Boot Camp3 What is the CPRM? Overview of device and system requirements Identifies best practice for product (device and system) protocol design Describes the process used to define and maintain the quality of a Certification Program

6 January 2016Conformity Boot Camp4 CPRM Guiding Principles Open standards based Clean, layered architecture Robust certification program Focussed on application programming interface, not specific applications Layered conformance testing Performance testing considerations Economically viable

6 January 2016Conformity Boot Camp5 CPRM Organisational Requirements Identifies organisational structure to support a robust certification and interoperability testing program for products –Addresses “devices” (incorporating hardware) and “system applications” (software only) –Considerations: Program management Test laboratory qualification Logo management Change control Dispute resolution

6 January 2016Conformity Boot Camp6 Program Overview

6 January 2016Conformity Boot Camp7 SG System Components

6 January 2016Conformity Boot Camp8 Context of Individual Test Suites PhyCT- Physical Conformance Testing PCT-Protocol Conformance Testing DIOT-Device Interoperability Testing NIOT-Network InteroperabilityTesting PhyPT-Physical Device Performance Testing

6 January 2016Conformity Boot Camp9 Abstract Test Documents Contents / methods based on –X291 OSI Conformance Testing Methodology and Framework for Protocol Recommendations for ITU-T Applications – Abstract Test Suite Specification Each document summarises requirements for: –Test Methodology or Methodologies –PICS proformas –Test suites –Abstract Test Cases –Other information?

6 January 2016Conformity Boot Camp10 Current Status CPRM –at rev9, on hold pending SGTCC IPRM –Next step is to coordinate CPRM with IPRM to ensure consistency Abstract Test Case Documents: –OpenHAN started –Need to finalise content and scope. –Then start OpenADE and OpenADR