Sprint 105 Review / Sprint 106 Planning April 22, 2013.

Slides:



Advertisements
Similar presentations
Connect Team Connect Team Outside Contrib Outside Contrib Unscheduled Backlog Bugs Feature Requests BA Review Requirement Docs Epic Large Tasks or Features.
Advertisements

July 2010 D2.1 Upgrading strategy Javier Soto Catalog Release 3. Communities.
JIRA – An Introduction -Arpit Jindal
Open Library Environment Designing technology for the way libraries really work November 19, 2008 ~ ASERL, Atlanta Lynne O’Brien Director, Academic Technology.
Market Systems Release Update Modifications Committee Meeting 61 April 15 th
03 | Application Lifecycle Management Susan Ibach| Technical Evangelist Christopher Harrison | Head Geek.
Visit our Focus Rooms Evaluation of Implementation Proposals by Dynamics AX R&D Solution Architecture & Industry Experts Gain further insights on Dynamics.
Getting the Most Out of Blue Mountain RAM
User Group 2015 Version 5 Features & Infrastructure Enhancements.
© 2009 GroundWork Open Source, Inc. PROPRIETARY INFORMATION: Information contained herein is not for use or disclosure outside of GroundWork Open Source,
Copyright © The OWASP Foundation Permission is granted to copy, distribute and/or modify this document under the terms of the OWASP License. The OWASP.
DYNAMICS CRM AS AN xRM DEVELOPMENT PLATFORM Jim Novak Solution Architect Celedon Partners, LLC
OSG Area Coordinators Meeting Operations Rob Quick 2/22/2012.
Sprint 114 Review / Sprint 115 Planning August 26th, 2013.
Sprint 99 Review / Sprint 100 Planning January 28, 2013.
What’s new in Stack 3.2 Michael Youngstrom. Disclaimer This IS a presentation – So sit back and relax Please ask questions.
CONNECT Roadmap Updated version after June 27 th, 2013 Requirements and Prioritization Meeting 1.
CONNECT: Install Webinar for Code-A-Thon April 20th, 2010.
Deliverable Readiness Review LexEVS 5.1 December 17, 2009.
CONNECT: Install Webinar for Code-A-Thon September 7 th, 2010.
VA Pain Coach (VPC) Mobile Applications (Apps) Phase Two (MAP2) Sprint 1 Demo/Review Report April 22, 2015.
Sprint 104 Review / Sprint 105 Planning April 8, 2013.
© Copyright 2011, Alembic Foundation. All Rights Reserved. Aurion: Health Information Exchange Technology Today Alembic Foundation OSCON 2011 July 27,
Sprint 112 Review / Sprint 113 Planning July 29 th, 2013.
SIM- Data Infrastructure Subcommittee November 14, 2013.
CONNECT Roadmap Draft version as of February 4 th,
Sampleminded® Support Overview Last Updated: 1/22/
Sprint 103 Review / Sprint 104 Planning March 25, 2013.
CONNECT: Install Webinar for Code-A-Thon April 22nd, 2010.
Proposal for the new group web infrastructure SFT Group meeting 3/7/2009 Yves Perrin.
Sprint 115 Review / Sprint 116 Planning September 9th, 2013.
Sprint 158 Review / Sprint 159 Planning May 18 th – June 1 st 2015.
Connect. Communicate. Collaborate Federation Interoperability Made Possible By Design: eduGAIN Diego R. Lopez (RedIRIS)
Shibboleth: An Introduction
Sprint 101 Review / Sprint 102 Planning February 25, 2013.
Sprint 110 Review / Sprint 111 Planning July 1 st, 2013.
© 2002 IBM Corporation Confidential | Date | Other Information, if necessary June, 2011 Made available under the Eclipse Public License v Mobile.
TRW Code Updates for WCRS Document Activity ERD, EAR Changes December, 2006 Highlights: TRW Automotive December, 2006 TRW Automotive December, 2006 Auto.
Page 1 14 December 2001 DBOR Release Features Title Slide AT&T DBOR.
Sprint 102 Review / Sprint 103 Planning March 11, 2013.
Sprint 106 Review / Sprint 107 Planning May 06, 2013.
Sprint 108 Review / Sprint 109 Planning June 3 rd, 2013.
Query Health Distributed Population Queries Implementation Group Meeting February 7, 2012.
Sprint 169 Review / Sprint 170 Planning Oct 19 th – Nov 2 nd 2015 – s169.
Sprint 116 Review / Sprint 117 Planning September 23th, 2013.
Sprint 107 Review / Sprint 108 Planning May 20, 2013.
© 2010 Marcato Partners, LLC Scrum Experience Group Team Foundation Server (TFS) Marcato / Kardia Health Systems April 27, 2010.
Sprint 170 Review / Sprint 171 Planning Nov 2 nd – Nov 16 th 2015 – s170.
Query Health Distributed Population Queries Implementation Group Meeting March 6, 2012.
HIE Certified Network Pilot Testing w CONNECT May 02, 2013.
CONNECT CCB Meeting May 16, Balancing current + future needs CONNECT needs to support the current 2012 production and operational needs of the Federal.
Sprint 174 Review / Sprint 175 Planning Dec 28 th – Jan 11 th 2016 – s174.
Sprint 113 Review / Sprint 114 Planning August 12th, 2013.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Ops Portal New Requirements.
Sprint 175 Review / Sprint 176 Planning Jan 11 th – Jan 25 th 2016 – s175.
Build and Deployment Process Understand NCI’s DevOps and continuous integration requirements Understand NCI’s build and distribution requirements.
JD Edwards Support & Tools Gillian Boshell Product Service Advisor, Oracle Australia.
IPS Infrastructure Technological Overview of Work Done.
Sprint 173 Review / Sprint 174 Planning Dec 14 th – Dec 28 th 2015 – s173.
POSP Vendor Conference Connecting to the Provincial EHR Patrick Binns Executive Director, Alberta Wellnet May 8, 2003.
Google Code Libraries Dima Ionut Daniel. Contents What is Google Code? LDAPBeans Object-ldap-mapping Ldap-ODM Bug4j jOOR Rapa jongo Conclusion Bibliography.
SUNCOAST SOLUTIONS | THE POWER TO CARE Target Audience: System Administrator Clinical Leaders ICD 10 Maintenance & Set-up.
AGILE PROJECT MANAGEMENT WITH TEAM FOUNDATION SERVER 2010 Brian Keller Microsoft.
MASS C++ Updates JENNIFER KOWALSKY, What is MASS? Multi-Agent Spatial Simulation A library for parallelizing simulations and data analysis Uses.
Sprint 177 Review / Sprint 178 Planning Feb 8 th – Feb 22 nd 2016 – s177.
Release 4.7 Review Sep 8th Sprint Resource Pages For past sprint, visit: NHINProgress/Sprint+191+Progress+Summary.
External Web Services Quick Start Guide
SQL Server for Java developers
Scrum Experience Group Team Foundation Server (TFS)
TAG Agenda – April 6th 2006 Minutes from last TAG meeting – 13.45
Presentation transcript:

Sprint 105 Review / Sprint 106 Planning April 22, 2013

Sprint Resource Pages For this sprint, visit: nt+105+Progress+Summary nt+105+Progress+Summary For next sprint, visit: nt+106+Progress+Summary nt+106+Progress+Summary For information on the CONNECT 4.1 release visit: 2

Sprint 105 Summary - Cumulative Flow 3 To Do In Progress QA Done

Sprint 105 Summary - Burndown Chart 4

Sprint 105 Summary – Sprint Stats Points committed = 13 –Initial points committed – 15.5 –Ticket added for 0.5 points of effort, totaling 16 points for sprint –Ticket moved for 3 points, resulting in 13 points Tickets committed to sprint = 11 Tickets completed = 7 Points remaining (unclosed) at end of sprint = 5 Points completed in sprint (velocity) = 8 5

Sprint 105 – Themes & Tasks 4.1 Release –Binaries and source available –Complete and finalize supporting documentation 4.2 Release –CMS-OFM 4.0 install on WAS 7 JDK 1.6 testing –Design for Document Query specification version identification CONN-46 & CONN-15 Participation in the Healtheway Certification pilot Partner and Community Support 6

Sprint What We are Showing Today CONNECT 4.1 released on April –Release overview page – CONNECT 4.1 OverviewCONNECT 4.1 Overview  JBoss Application Server Support  Continuous Integration and Code Base Improvements –Significantly increased automated test case coverage and build process  Additional Improvements –For important issues resolution, see Release Notes for detailsRelease Notes CONN-355/357 – CONNECT not sending organization-id attribute statement in SAML header – necessary for certification testing –Note - Support for CONNECT 4.0 is deprecated - all users are encouraged to target 4.1 for new adoption and upgrades. 7

Sprint What We are Showing Today CONNECT 4.2  Support adopters/federal partners that want to use CONNECT with Java 6 (Feature request – CONN-350) –CONN-363 – Update codebase to use Java 6 Code changes and testing approach –CONN-365 – Push CONNECT libraries built with Java 6 to maven central Demo 8

Sprint What We are Showing Today CONNECT 4.2  Provide adopters that support both versions of the specifications(QD and RD) the service version of the incoming message so that adapters can validate/further process the request and generate the version specific response (Feature request – CONN-46) –CONN-293 – Research and analysis task related to design options (Responding) –Link to design approach- w w Discussion 9

Sprint What We are Showing Today Participation in HealtheWay pilot –CONN-317 – Pre-test setup for pilot testing (not completed) Community and Federal Partner Support –Support CMS with their planned Direct Pilot Custodial Agent Duties –Unplanned infrastructure maintenance Significant impact to sprint

Sprint Proposed Themes Continued Testing for Java 6 & Java 7 Support –Installation testing on WAS 7 /IBM SDK 1.6 –Installation testing on WL 11g / JDK 1.6 –Installation testing on WL 12c / JDK 1.7 –Installation testing on WAS 8.5 /IBM SDK 1.7 –Installation testing on JBoss /JDK 1.7 –Installation testing on GlassFish /JDK 1.7 –Smoke test on all installations Research and Write Design Approach for Multi- Specification Identification for QD/RD (Initiating) –Review design approach with technical leads from Federal Partners (conference call) 11

Sprint 106 – Other tasks Run Healtheway certification pilot test cases for a vendor gateway –Pilot extended to May 31 Other tasks –Partner and Community Support –Ongoing Custodial Agent Duties Product Backlog dProjectId=

CONNECT 4.0 Community Announcements CONNECT Awareness –Open sprint review and planning meetings  Next sprint meeting will be May 6 th –CONNECT 4.0 Blogs and Forum posts – –CONNECT User Group meeting May 21 st – Call for participation and abstracts underway 13

Questions and Discussion 14