1 Single Entry Model (SEM) Go-Live NATF Update July 28, 2009 Matt Mereness.

Slides:



Advertisements
Similar presentations
June 26, 2008 TAC Texas Nodal Market Implementation: Program Update Jerry Sullivan.
Advertisements

1 TSP Nodal Engagement Market Participant Call ERCOT August 04, 2010.
June 12, 2008 ROS SEM Go-Live procedure Linda Clarke.
1 Market Trials Outage Scheduling Qualifications Weekly Update April 02, 2010.
1 Single Entry Model (SEM) Weekly Market Call August 13, 2009 Matt Mereness.
Lead from the front Texas Nodal 1 Resource Entity Owned Transmission Asset Data Collection Feb 27, 2009 Kick Off Meeting.
MP Online Data Entry Project Update WMS / ROS August 2013 Troy Anderson.
1 Single Entry Model (SEM) Weekly Market Call September 3, 2009 Matt Mereness.
1 Market Trials Outage Scheduling Weekly Update July 23, 2010.
1 Single Entry Model (SEM) Weekly Market Call August 06, 2009 Carrie Tucker.
1 Single Entry Model (SEM) Go-Live Update ROS Update July 16, 2009.
Lead from the front Texas Nodal 1 EDS 3 Release 5: SCED Phase 1 Kickoff Meeting August 1, 2007.
1 Market Trials Outage Scheduling Weekly Update July 09, 2010.
Lead from the front Texas Nodal 1 EDS 4 Release 9.1 DAM/RUC/SASM Market Call January 11, 2008.
TSP WebEx Conference Call Mar 24, Antitrust Admonition 1. Explanation of Validation of Network Model 2. Explanation of Metric.
1 Single Entry Model (SEM) Go-Live Update for NIT June 22, 2009 Matt Mereness.
Texas Nodal 1 Nodal Operations Model Posting Confirmation TAC May 7, 2009 Matt Mereness, ERCOT.
TPTF Meeting Texas Nodal Program Update Market Readiness Metrics Update Chris Wilkinson PMO.
Lead from the front Texas Nodal 1 EDS 4 Release 9.2 Outage Scheduler Kickoff Meeting March 27, 2008.
1 Nodal Single Entry Model (SEM) Go-Live WMS Update May 18, 2009.
Lead from the front Texas Nodal 1 Registration Market Call June Data Collection Window Aug 14, 2009.
1 Market Trials Outage Scheduling Weekly Update June 25, 2010.
EDS 1 Early Delivery Systems Testing Preparation WebEx Meeting Jonathan Pulcini - EDS 1 John Webb - EDS 1 Ken Kasparian - EDS 3 Bill Blevins - EMS Frank.
1 Single Entry Model (SEM) Weekly Market Call July 23, 2009 Matt Mereness.
1 Market Trials Outage Scheduling Weekly Update July 02, 2010.
Lead from the front Texas Nodal 1 Texas Nodal Registration Kick-off Meeting Matt Mereness June 6 th, 2007.
1 Single Entry Model (SEM) Market Kick-off Call May 28, 2009 Matt Mereness.
1 TSP Nodal Engagement Market Participant Call ERCOT September 15, 2010.
1 Market Trials Outage Scheduling Weekly Update September 03, 2010.
Lead from the front Texas Nodal 1 EDS 4 Outage Scheduler EDS Market Call May 30, 2008.
1 Market Trials Outage Scheduling Weekly Update June 11, 2010.
May 22, 2008 TPTF Texas Nodal Market Implementation Program Update Raj Chudgar.
Outage Scheduler Transition Plan Kenneth Ragsdale NATF.
1 Single Entry Model (SEM) Go-Live Update Special TAC Meeting (Updated) August 18, 2009.
Lead from the front Texas Nodal 1 EDS 4 Outage Scheduler EDS Market Call June 20, 2008.
1 Single Entry Model (SEM) Weekly Market Call June 4, 2009 Matt Mereness.
1 Market Trials Outage Scheduling Weekly Update August 20, 2010.
1 Single Entry Model (SEM) Weekly Market Call September 10, 2009 Matt Mereness.
1 Single Entry Model (SEM) Weekly Market Call June 11, 2009 Matt Mereness.
1 Single Entry Model (SEM) Weekly Market Call September 17, 2009 Matt Mereness.
Lead from the front Texas Nodal 1 Registration Market Call June Data Collection Window June 19, 2009.
Lead from the front Texas Nodal 1 Registration Update to TPTF Patrick Coon / Matt Mereness August 13 th, 2007.
1 Nodal Update for: Single Entry Model (SEM) Go-Live Transition NDSWG May 19, 2009 Matt Mereness.
1 Market Trials Outage Scheduling Weekly Update August 13, 2010.
1 TSP Nodal Engagement Market Participant Call ERCOT April 21, 2010.
Texas Nodal 1 Nodal Operations Model Posting NATF Sep 29, 2009 Matt Mereness, ERCOT.
1 Single Entry Model (SEM) Weekly Market Call August 27, 2009 Matt Mereness.
1 Single Entry Model (SEM) Weekly Market Call July 2, 2009 Matt Mereness.
Lead from the front Texas Nodal 1 EDS 4 Outage Scheduler EDS Market Call April 25, 2008.
1 Market Trials Open Market Participant Call Weekly Kick Off Aug 09, 2010.
Lead from the front Texas Nodal 1 Nodal Transitional Qualification Approach to Qualifications for the Nodal Market August 16, 2007.
Lead from the front Texas Nodal 1 Registration Market Call June Data Collection Window June 05, 2009.
1 Single Entry Model (SEM) Weekly Market Call July 16, 2009 Matt Mereness.
Transition Plan Network Operations Model Change Requests 5/26/2010.
Retail Workshop ERCOT Nodal Update October 06, 2010.
Current Nodal OS Design 1.The NMMS database will have an OWNER and an OPERATOR designation for each piece of equipment in the model. The OWNER and OPERATOR.
Lead from the front Texas Nodal 1 EDS Market Call Bi-Weekly Update July 24, 2009.
Network Operations Model Go-Live Decision Kenneth Ragsdale TAC July 1, 2010.
October 2, 2008 TAC Texas Nodal Market Implementation: Program Update Ron Hinsley.
Lead from the front Texas Nodal 1 MP10 / MP11 Registration Data Update Oct 14, 2008 TPTF.
June 5, 2008 TAC Texas Nodal Market Implementation Program Update Jerry Sullivan.
Lead from the front Texas Nodal 1 EDS Market Call Weekly Update Feb 06, 2009.
1 Single Entry Model (SEM) Weekly Market Call August 20, 2009 Matt Mereness.
1 TSP Nodal Engagement Market Participant Call ERCOT May 19, 2010.
1 Market Trials Outage Scheduling Qualifications Weekly Update March 26, 2010.
1 Single Entry Model (SEM) Go-Live TAC Update May 7, 2009.
1 Single Entry Model (SEM) Go-Live Update TAC Update August 6, 2009.
August 11, 2008 TPTF Early Delivery Systems Status Daryl Cote.
Lead from the front Texas Nodal 1 EDS 4 Outage Scheduler EDS Market Call April 18, 2008.
NMT – Network Operations Modeling & Telemetry - Project
Presentation transcript:

1 Single Entry Model (SEM) Go-Live NATF Update July 28, 2009 Matt Mereness

2 SEM Weekly Market Call Agenda SEM Go-Live Update Market Testing and Training Update Readiness Dashboards FAQ Roll-call Questions/Answers Appendix/Supporting Info –What is SEM? –Go-Live timeline and activities –Training overview and sign-up –Dates/ methods to test submissions of NOMCRs –Readiness metrics related to training and testing –Communication mailbox and SEM Market Call Schedule

3 SEM Go-Live Update What is ERCOT doing this week? –Conducted fifth class this week –Continue Nodalizing the Zonal Model seed (adding RARF data and other nodal attributes) –July 17 Market Notice to USAs for MPIM Roles for NMMS Role available to assign beginning July 28 NMMS_IMM ERCOT to release details and dates in later notice how/when to assign the roles for SEM Go-Live Training enrollment –Completed session/week 5 of 6 weeks of training –Openings available CIM Model Distribution –Distributed to 6 TSPs –All those that requested the populated CIM XML file to date have received it Communications during the week – NOMCRHelp –No significant issues ed in from TSPs –Password re-set requests can be sent directly to

4 Market Testing & Training Update Communication of requests Training Requests –Sign up using LMS system Training page: Enrollment: Dates- June 23-25, June 30- July 2, July 7- 9, 14-16, 21-23, Post Go-Live Training, Sept 23 Test system access request – for system Populated CIM file request –Request file from –Pressing CDs and mailing to TSP upon request

5 SEM Go-Live Market Engagement Dashboard TO/TDSP Attendance at any of the SEM Market Calls # of Representatives scheduled to take SEM Training # of TDSP users with access to the test SEM environment # test NOMCRs Submitted by TDSPs to the test SEM environment AEP TEXAS CENTRAL COMPANY XXXX BRAZOS ELECTRIC POWER CO OP INC (TDSP) XXXX BROWNSVILLE PUBLIC UTILITIES BOARD (TDSP) XXX BRYAN TEXAS UTILITIES (TDSP) XXXX CENTERPOINT ENERGY HOUSTON ELECTRIC LLC (TDSP) XXXX CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP) XXXX CITY OF COLLEGE STATION (TDSP) X X CITY OF GARLAND (TDSP) XXX CPS ENERGY (TDSP) XXXX DENTON MUNICIPAL ELECTRIC (TDSP) XXXX GEUS (TDSP) X X GOLDEN SPREAD ELECTRIC COOPERATIVE INC (TSP) XXX LCRA TRANSMISSION SERVICES CORPORATION XXXX ONCOR ELECTRIC DELIVERY COMPANY XXX RAYBURN COUNTRY CO OP DBA RAYBURN ELECTRIC (TDSP) XX RIO GRANDE ELECTRIC CO OP (TDSP) SOUTH TEXAS ELECTRIC CO OP INC XXXX TEXAS MUNICIPAL POWER AGENCY XXX TEXAS-NEW MEXICO POWER CO (TDSP) XXXX WEATHERFORD MUNICIPAL UTILITY SYSTEM XX TEX-LA ELECTRIC CO OP OF TEXAS TOTAL:

6 SEM Go-Live Criteria Dashboard

7 SEM Go-Live Criteria and Approval Summary of remaining Stakeholder meeting dates for SEM discussion/approval of Go-Live –August –30-day Market Notice - July 31 –TAC - Aug 6 (Discussion of approval- whether special mtg needed) –ROS - Aug 13 –NDSWG - Aug 18 (considering additional meeting) –ERCOT publishes results and sign-off from Directors – Aug 17 –BOD - Aug 18 –10-day Market Notice - Aug 21 –SEM Go-Live - Aug 31

8 Open Issues / Responses No Severity 1 or 2 defects identified in testing or training Will there be focused ICCP-only training or a guide for SCADA-focused employees? –All TSP users are encouraged to attend the basic training being offered –When this training is complete ERCOT will see if there is a desire of MPs to have specialized training for SCADA assignments to build upon the basic training Can an MP modeler set-up new equipment, and then have another user make the ICCP assignment? –Yes, the same TSP can have one user establish the equipment in a NOMCR, and a different user can edit the NOMCR to complete the SCADA assignments Can ERCOT set-up a read-only role? –By default users granted read/write privileges, upon an request to ERCOT can grant read-only Operatorship vs Ownership Line assignment- Legal working on draft of NPRR Service Level Agreement post SEM Go-Live- –IT support 99.9% availability, 4 hour recovery –Same business support as used for Service Requests –Post SEM Go-Live + 60days window for fall-back to Service Requests –Post SEM Go-Live + 60days window for MPIM roll-out of roles –Mkt notice today for release July28 of roles to TML NMMS (more coming on dates/details to set-up) Guideline discussion Ongoing- from 500 comments, down to 3 significant discussion- see v0.81 from NDSWG agenda

9 Q&A Questions and Answers Next Weekly Market Call- July 30, 2009

10 Appendix/Supporting Info –What is SEM? –Go-Live timeline and activities –Training overview and sign-up –Dates/ methods to test submissions of NOMCRs

11 SEM Go-Live Overview Single Entry Model (SEM) Go-Live is the switchover on Aug 31, 2009 for TSP submissions of network operations model change requests –from “Service Request” submissions via TML –to “NOMCR” submissions via the NMMS System of record for model changes becomes NOMCRs on 8/31//09 System of record for Network operations Model for reliability and dispatch remains Zonal/Genesys system until Dec 2010 TSP Current Activity Submit Modeling Change via Service Request ERCOT Uploads Svc Request into Zonal Genesys Model ERCOT Copies/Converts Zonal Model “seed” Into Nodal NMMS Model TSP Aug 31, 2009 Submit Modeling Change via NOMCR/NMMS Tool (includes ICCP) ERCOT Incrementally Converts NOMCR Into Svc Req Uploads into Zonal Genesys Model ERCOT uploads NOMCR Into Nodal NMMS Model to support nodal testing Data Consistency Checks are run to ensure model synchronization/fidelity Periodic checks are run to ensure model synchronization/fidelity Full Copy Incr. NOMCR

12 Current Network Operations Model Maintenance for TSPs ERCOT Zonal EMMS Model (system of record through 12/1/2010) Submits Service Request to Change Model ERCOT Nodal NMMS Model (nodal testing model- CIM file for EMS/MMS/etc) Periodic full copy and conversion of model (zonal seed used for nodal systems) TSP

13 After 8/31/2009: SEM Go-Live Network Operations Model Maintenance for TSP ERCOT Zonal EMMS Model (system of record through 12/1/2010) ERCOT Nodal NMMS Model (nodal testing model- CIM file for EMS/MMS/etc) ERCOT enters NOMCRs into zonal model ERCOT runs consistency checks to ensure models are aligned and maintained Submits Model Change Request (NOMCR) TSP NMMS Model System of Record Nodal Go-Live 12/1/2010

14 Network Operations Model Maintenance for Resource & QSE (today and post 8/31/09) ERCOT Zonal EMMS Model (system of record through 12/1/2010) ERCOT Nodal NMMS Model (nodal testing model- CIM file for EMS/MMS/etc) ERCOT enters into zonal model NMMS Model System of Record Nodal Go-Live 12/1/2010 Submits RARF (Resource Asset Reg Form) via Service Request Submits ICCP Change via Service Request ERCOT process QSE RE

15 SEM Go-Live Update Communication and Calendar –May 6 th ERCOT began TSP outreach through Wholesale Client Services TDSP/TO associations sent to 23 TOs Solicit training headcount from TOs (pre and post Go-Live) Good response from TOs –May 15- Market Notice sent for SEM Kick-off call to occur –May 28- SEM Kick-off WebEx 10:00-11:30am Go-Live timelines and activities for June - August 2009 Training overview and sign-up Dates and access methods to test submissions of NOMCRs Communications mailbox and SEM market call schedule –June 4- Start weekly Thursday SEM Calls at 2-3pm (through go-live/August) Company attendance is recorded ERCOT provide updates on testing and training Highlight issues or Frequently Asked Questions Open Question/Answer session for TSPs Meetings will be posted on new ERCOT calendar page at: –June 8- Testing environment available to TSPs (through Aug 10) –June 22- Weekly classroom training for 6-weeks (through July 30)

16 Go-Live timeline and activities (continued) Communication –May 6 th ERCOT began TSP outreach through Wholesale Client Services TDSP/TO associations sent to 23 TOs Solicit training headcount from TOs (pre and post Go-Live) Good response from TOs

17 Go-Live timeline and activities (continued) Communication and Calendar –May 15- Market Notice sent for SEM Kick-off call to occur –May 28- SEM Kick-off WebEx 10:00-11:30am Go-Live timelines and activities for June - August 2009 Training overview and sign-up Dates and access methods to test submissions of NOMCRs Readiness metrics related to training and testing Communications mailbox and SEM market call schedule –June 4- Start weekly Thursday SEM Calls at 2-3pm (through go-live/August) Company attendance is recorded ERCOT provide updates on testing and training Highlight issues or Frequently Asked Questions Open Question/Answer session for TSPs Meetings will be posted on ERCOT calendar at –June 8- Testing environment available to TSPs (through Aug 10) –June 22- Weekly classroom training for 6-weeks (through July 30)

18 Go-Live timeline and activities (continued)

19 Go-Live timeline and activities (continued) –Transition periods: June 1- Aug 30, 2009 (objective to minimize SvcReq during this period) –Submit changes as far in advance as possible –No equipment name changes (defer until after SEM Go-Live 8/31/09) Aug 15-30, 2009 –Two weeks no submissions, except for emergency changes Aug 31, Feb 2010 (NOMCRs for any/all network changes) –After 8/31/09 TSPs will work to validate the network model and align to their in-house systems –Initially the NOMCR timeline will align with zonal timeline »30-day lead-time, compliant with current zonal database schedulezonal database schedule »Status is tracked and communicated via system s –Any SRs that did not go into zonal production will be converted by ERCOT to NOMCRs for verification/submission by TSPs in Sept –In 2010 TSPs gradually transition to NodalProtocols(3.10) 90-day timeline submission requirements

20 Training Overview and Sign-Up TSP Submission Testing and Training will be the same system/database -Model to be used will be snapshot from October Training audience is the TSP network operations modelers/staff Submission Testing system access –Available June 8 – Aug 10 –NOMCR testing system will be on-line and available to all TSPs –ERCOT has established a dedicated and have staff available to support questions Training to be hosted in Taylor –Pre-SEM classes June 22 – Aug 3 Current plans for at least six 3-day sessions Planning for seats for each class Large dedicated training room –Post-SEM classes Sept 23- Oct 20 Fewer sessions and smaller classes (tbd) Make-up classes, not just-in-time training for all staff after go-live

21 Training Overview and Sign-Up (continued) Classroom schedule for the 3-day class One class per week for 6 weeks Start 1pm Tuesday / End noon Thursday Trainees can stay in Lab Thursday afternoon for Q&A If schedule fills up, ERCOT will shorten class to 2-days for the overbooked weeks June 23-25, June 30- July 2 July 7- 9, 14-16, 21-23, Next 4 slides show summary of training format and equipment Full training outline in Appendix (no change from last month) Note that testing/training will only include Level 1 Validation Level 1 – Automatic by the system upon submitting. Level 2 – Visual by the N/W Model Coordinator Level 3 – Power flow run on the one NOMCR. Level 4 – Power flow run on all NOMCRs for that day. Level 5 – Power flow run on the AREVA system.

Training (continued)

26 Training Overview and Sign-Up (continued) Sign-up for access to test environment starts today System access begins June 8 th request to Test environment requires a valid digital certificate (production or nodaltest) -Digital certificates are to be coordinate with your company’s USA -Include in Employee Name- TSP/Company Name- DUNS- address- Alternate/Centralized address for status change- Primary phone- Alternate phone- Sign-up for training will be discussed next week Weekly slots available for up to 18 participants Looking to leverage LMS/Training system to coordinate and track training Training classes occur each week from June 23 through July