Information Technology Project Management Managing IT Project Risk.

Slides:



Advertisements
Similar presentations
Project management Information systems for management1 Project Management.
Advertisements

Note: See the text itself for full citations. Information Technology Project Management, Seventh Edition.
Project Management Gaafar 2007 / 1 This Presentation is uses information from PMBOK Guide 2000 Project Management Risk Management* Dr. Lotfi Gaafar.
Risk Analysis & Management. Phases Initial Risk Assessment Risk Analysis Risk Management and Mitigation.
Service Design – Section 4.5 Service Continuity Management.
Risk Management Planning for Problems. Characteristics of Risk Risk has two principle characteristics Uncertainty – It may or may not happen Loss – If.
Issue Tracking John D. McGregor Module 10 Session 1 Issue Tracking and Risk.
W5HH Principle As applied to Software Projects
Risk Analysis and Management
1 IS371 WEEK 8 Last and Final Assignment Application Development Alternatives to Application Development Instructor Online Evaluations.
The Australian/New Zealand Standard on Risk Management
Session 33 Guest Speaker: Gini Van Siclen. Risk Management for Project Managers Gini Van Siclen.
Managing Risk to Reduce Construction Claims (And Improve Project Success) Presented by Laurie Dennis, PE, CVS-Life, FSAVE.
CIS 375 Bruce R. Maxim UM-Dearborn
Project Risk Management Risk Mitigation. Risk Management  The prime objective of risk management is to minimize the impact and probability of the occurrence.
8 Managing Risk Teaching Strategies
Planning. SDLC Planning Analysis Design Implementation.
Part II Project Planning © 2012 John Wiley & Sons Inc.
PRM 702 Project Risk Management Lecture #28
Chapter 25 Risk Management
COMPGZ07 Project Management Presentations Graham Collins, UCL
Software Project Management Lecture # 8. Outline Chapter 25 – Risk Management  What is Risk Management  Risk Management Strategies  Software Risks.
Project Risk Management. The Importance of Project Risk Management Project risk management is the art and science of identifying, analyzing, and responding.
Chapter 11: Project Risk Management
Project Risk Management Mohammad A. Rob. The Importance of Project Risk Management Project risk management is the art and science of identifying, assigning,
Software Project Management Lecture # 8. Outline Earned Value Analysis (Chapter 24) Topics from Chapter 25.
Resources Performance time. resources Performance time 2.
Information System Design IT60105 Lecture 21 Staff Organization, Risk Management and Software Configuration Management.
Risk Management in the Built Environment Qualitative and Quantitative Risk Management By Professor Simon Burtonshaw-Gunn – licensed under the Creative.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Quick Recap Monitoring and Controlling. Phases of Quality Assurance Acceptance sampling Process control Continuous improvement Inspection before/after.
Tingxuan Liu Risk Management in Software engineering.
1 Project Risk Management Project Risk Management Dr. Said Abu Jalala.
Chapter 11: Project Risk Management
Chapter 12 Project Risk Management
Project Management Learning Program 19 – 30 April 2010, Mekong Institute, Khon Kaen, Thailand Assumptions and Risk.
Lecture 11 Managing Project Execution. Project Execution The phase of a project in which work towards direct achievement of the project’s objectives and.
Management & Development of Complex Projects Course Code MS Project Management Perform Qualitative Risk Analysis Lecture # 25.
© The McGraw-Hill Companies, Software Project Management 4th Edition Risk management Chapter 7.
Object-Oriented Software Engineering
Pre-Project Components
Ch 10 - Risk Management Learning Objectives You should be able to: List and describe risk management processes, inputs, outputs, and tools List and describe.
Project Management IV1021Fö5 Risk Management. Agenda Project Risk Project Risk Management The Risk Management Process Goal: get an understanding of basic.
STEP 4 Manage Delivery. Role of Project Manager At this stage, you as a project manager should clearly understand why you are doing this project. Also.
Risk Management How To Develop a Risk Response Plan alphaPM Inc.
Project Risk Management Planning Stage
Project & Risk Management
CSC 480 Software Engineering Lecture 5 September 3, 2004.
(Project) RISK MANAGEMENT PROCESS SEPTEMBER 5, 2008.
RISK MANAGEMENT YULVI. Introduction Time Quality Cost Project Constraints Success Introduction.
Project Risk Management Sections of this presentation were adapted from A Guide to the Project Management Body of Knowledge 3 rd Edition, Project Management.
What is project management?
Software Project Management Lecture # 9. Outline Chapter 25 – Risk Management  What is Risk Management  Risk Management Strategies  Software Risks.
1 Project Management C53PM Session 4 Russell Taylor Staff Work-base – 1 st Floor
Copyright 2012 John Wiley & Sons, Inc. Part II Project Planning.
Issue Tracking and Risk Management John D. McGregor Module 10 Session 1 Issue Tracking and Risk.
Copyright 2015 John Wiley & Sons, Inc. Project Planning Part II.
ON “SOFTWARE ENGINEERING” SUBJECT TOPIC “RISK ANALYSIS AND MANAGEMENT” MASTER OF COMPUTER APPLICATION (5th Semester) Presented by: ANOOP GANGWAR SRMSCET,
Risk Assessment: A Practical Guide to Assessing Operational Risk
Ashima Wadhwa.  Probably the most time-consuming project management activity.  Continuous activity from initial concept through to system delivery.
Managing Project Risk – A simplified approach Presented by : Damian Leonard.
Outline Risk Identifying risks to your project Change Managing change for your project.
Project Management BBA & MBA
11.3 Perform Qualitative Risk Analysis
8 Managing Risk (Premium).
COSO and ERM Committee of Sponsoring Organizations (COSO) is an organization dedicated to providing thought leadership and guidance on internal control,
Planning Phase: Project Control and Deliverables
Part II Project Planning © 2012 John Wiley & Sons Inc.
Software Project Management (SPM)
Risk Management.
Presentation transcript:

Information Technology Project Management Managing IT Project Risk

Outline Defining IT Failure Defining Risk and Risk Management Risk Management Cycle – Risk Identification – Risk Analysis – Risk Handling – Risk Monitoring

What do we mean by failure? Lyytinen (1988) distinguishes between “development failure” and “use failure” A more detailed categorization of IT failure would include: – system grossly exceeds original budget – system grossly exceeds original schedule – system never functions technically – system functions, but quality is so poor that, for all practical purposes, system is not usable – system functions but is not used--users reject the system because it is cumbersome to use or because they have no incentive to use it – system functions, but completely lacks originally promised functionality or fails to fit the task it was designed to support “Runaway Systems”

Some Observations about Success/Failure Total Failure Total Success Stakeholder AStakeholder B Success/Failure is often viewed as a binary classification Success/Failure should be viewed along a continuum Success is in the eyes of the beholder

Why IT Projects Fail: The Traditional Wisdom Systems are specified and initiated by IS without sufficient input from the user(s) Inadequate estimates of development cost and time Lines of responsibility not clearly specified User acceptance test delayed until the project is completed Inadequate system testing Implementation difficulties

Warning Signs (Keider, 1984) Inadequate status reporting Isolation Lack of schedule changes Overemphasis on how a system will be built Premature programming Staff reassignments

Defining Risk and Risk Management A project risk is a potential problem that would be detrimental to a project’s success should it materialize Risk management is the identification and response to potential problems with sufficient lead time to avoid a crisis

Risk Management Cycle Risk Identification Risk Analysis Risk Handling Risk Monitoring

Risk Identification Business risk – Market risk – Shifts in business strategy or senior management Technical risk – Design and development problems – Testing and maintenance problems – Technical uncertainty Project risk – Budget – Schedule – Personnel – Requirements problems

Tools for Identifying Risks Checklists (e.g., Boehm’s top ten risk list) Frameworks (e.g., McFarlan’s framework) Questionnaires (e.g., Barki, Rivard, and Talbot survey)

Risk Factors: What the Literature Says... Technological newness Application size Application complexity Task complexity Project team expertise Organizational environment Magnitude of potential loss Barki, Rivard, and Talbot, 1993

What Project Managers Say

Risk Analysis For each identified risk, evaluate the probability of occurrence For each identified risk evaluate the impact if the risk should occur Prioritize your risk handling effort based on both probability and impact

Assigning Probabilities Here we ask: “What is the likelihood that something will go wrong?” Establish a scale that reflects the perceived likelihood of a risk – Probability scales are commonly used – Can be qualitative or quantitative e.g. highly improbable, improbably, moderate, likely, highly likely e.g % probability

Example Scale for Evaluation of Probability ScoreProbability 0Highly unlikely (1% or less) 1Very unlikely (1% - 24%) 2Unlikely (25% - 49%) 3Likely (50% - 74%) 4Very likely (75% -94%) 5Highly likely (95% or more)

Assessing Impact Here we ask: “What is the damage or impact if something does go wrong?” Three factors can be used to assess impact – Nature of the risk (i.e. the problems that are likely if it occurs) – Scope of the risk (i.e. how serious is the risk and how much of the project will be affected?) – Timing of the risk (i.e. when and for how long will the impact be felt)

Example Scale for Evaluation of Impact ScoreImpact 0Ignorable 1Unimportant 2Less important 3Important 4Very important / serious 5Catastrophic / critical

Risk Matrix Example Risk FactorProbabilityImpactProbability x Impact Priority A25101 B4283 C3392

Risk Handling Risk prevention – Develop options to reduce the potential of the problem occurring Risk avoidance – Accepting a lower risk (another solution) to avoid a high risk Risk remedy – Monitoring risk status and developing solutions to reduce effect when risk becomes a problem Risk assumption – Decision to accept the risk should it occur Risk reduction – Obtaining additional information that will reduce risk (e.g., prototyping, incremental development)

Risk Monitoring Should be done periodically – (e.g., when certain milestones are reached, at the end of project phases, at steering committee meetings, etc.) Useful to regularly assess and update project risk exposure Senior management should be involved in monitoring and should be aware of exposures Listen to the project group

Establishing Risk Referent Levels Risk referent levels can be set to define regions of acceptable and unacceptable risks Three typical risk referent levels – Cost overrun – Schedule slippage – Performance criteria Example Projected Schedule Overrun Projected Cost Overrun Region in which project termination will occur Referent level for cost/schedule overruns