PHENIX WEEKLY PLANNING 2/2/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.

Slides:



Advertisements
Similar presentations
PHENIX WEEKLY PLANNING 2/8/2007 Don Lynch. 2/8/207 Weekly Planning Meeting 2 Remaining Schedule StartComplete Cosmic Ray Run (Run 6.9)In Progress Pink.
Advertisements

PHENIX WEEKLY PLANNING 1/4/2007 Don Lynch. 1/4/207 Weekly Planning Meeting 2.
1/30/ PHENIX WEEKLY PLANNING Jan. 30, 2014 Don Lynch.
2/2/20121 PHENIX WEEKLY PLANNING 2/2/2012 Don Lynch.
PHENIX WEEKLY PLANNING 2/15/2007 Don Lynch. 2/15/207 Weekly Planning Meeting 2 Remaining Schedule StartComplete Cosmic Ray Run (Run 6.9)In Progress All.
2/9/20121 PHENIX WEEKLY PLANNING 2/9/2012 Don Lynch.
PHENIX WEEKLY PLANNING 5/17/2007 Don Lynch. 5/17/2007 Weekly Planning Meeting 2.
1 7/02/2009 PHENIX WEEKLY PLANNING 7/2/2009 Don Lynch No Meeting this week due to July 4 th holidays. Slides have been updated. Next planning meeting will.
PHENIX WEEKLY PLANNING 4/20/06 Don Lynch. Safety We have lost a whole week of running because of a violation of procedure and not because of the accident.
PHENIX WEEKLY PLANNING 11/30/06 Don Lynch. 11/16/06 Weekly Planning Meeting 2 PHENIX END OF SHUTDOWN PARTY Celebrating the successful installation of.
PHENIX WEEKLY PLANNING 2/21/2008 Don Lynch. 2/21/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
1/5/20121 PHENIX WEEKLY PLANNING 1/5/2012 Don Lynch.
8/9/20121 PHENIX WEEKLY PLANNING 8/9/2012 Don Lynch.
PHENIX WEEKLY PLANNING 10/05/06 Don Lynch. 10/05/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown.
12/26/2013-1/2/ PHENIX WEEKLY PLANNING Dec. 26, Jan. 2, 2014 Don Lynch.
PHENIX PLANNING Technical Support Plan for 2006 Don Lynch (updated 3/24/06)
PHENIX WEEKLY PLANNING 3/8/2007 Don Lynch. 3/8/207 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Continues…. All Up Commissioning In Progress.
Progress Completed Order/Fabricate SS Piping for HBD Purge gas from all detectors DAQ tests Prep. for Shutdown work (open doors, move carriages, etc. Pave.
12/29/20121 PHENIX WEEKLY PLANNING 12/29/2011 Don Lynch.
Technical Support /4/08 PHENIX WEEKLY PLANNING 9/4/2008 Don Lynch.
1/9/ PHENIX WEEKLY PLANNING Jan. 9, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 1/31/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
4/10/ PHENIX WEEKLY PLANNING April 10, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 3/6/2008 Don Lynch. 3/6/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
1 PHENIX WEEKLY PLANNING December 3, 2015 Carter Biggs.
PHENIX WEEKLY PLANNING 6/29/06 Don Lynch. 6/29/2006 Weekly Planning Meeting 2 This Week TOF W tests continue, modification decisions made? New HV connector.
3/6/ PHENIX WEEKLY PLANNING March 6, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 3/27/2008 Don Lynch. 3/27/2008 Weekly Planning Meeting2 Shutdown ’08 Schedule CM Crane ReviewMar Purge Flammable Gas, Magnet.
5/1/ PHENIX WEEKLY PLANNING May 1, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 11/2/06 Don Lynch. 11/2/06 Weekly Planning Meeting 2 New Detectors TOF West HBD RXNP MPC North.
PHENIX WEEKLY PLANNING 3/22/2007 Don Lynch. 3/22/2007 Weekly Planning Meeting 2 Schedule Re-Start 5 man shifts 3/20/07 Beam: blue ring 3/8/07, in yellow.
PHENIX WEEKLY PLANNING 1/10/2008 Don Lynch. 1/10/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn Going1/18 Gas.
PHENIX WEEKLY PLANNING 2/9/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
PHENIX WEEKLY PLANNING 9/14/06 Don Lynch. 9/14/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown '065/1/200612/8/2006.
PHENIX WEEKLY PLANNING 3/09/06 Don Lynch. BLM Test BLM Test Installation He Bags.
PHENIX WEEKLY PLANNING 3/23/06 Don Lynch. MPC Electronics MPC rack installed without cards. Cards to be installed As available and as access time is available.
1 PHENIX WEEKLY PLANNING January 21, 2016 Carter Biggs.
PHENIX WEEKLY PLANNING 10/4/2007 Don Lynch. 10/4/2007 Weekly Planning Meeting 2007 PHENIX Shutdown October 2007: Finish MPC South Installation, replace.
PHENIX WEEKLY PLANNING 12/7/06 Don Lynch. 12/7/06 Weekly Planning Meeting 2.
PHENIX WEEKLY PLANNING 10/20/06 Don Lynch. 10/20/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown.
1 12/30/2010 PHENIX WEEKLY PLANNING 12/30/2010 Don Lynch.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
3/20/ PHENIX WEEKLY PLANNING March 20, 2014 Don Lynch.
4/17/ PHENIX WEEKLY PLANNING April 17, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 10/12/06 Don Lynch. 10/12/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown.
1/26/20121 PHENIX WEEKLY PLANNING 1/26/2012 Don Lynch.
5/8/ PHENIX WEEKLY PLANNING May 8, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 3/15/2007 Don Lynch. 3/15/2007 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Done All Up Commissioning On Going Re-Start.
PHENIX WEEKLY PLANNING 3/02/06 Don Lynch. BLM Test.
PHENIX WEEKLY PLANNING 1/24/2008 Don Lynch. 1/17/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going Switch.
5/24/20121 PHENIX WEEKLY PLANNING 5/24/2012 Don Lynch.
12/19/ PHENIX WEEKLY PLANNING Dec. 19, 2013 Don Lynch.
PHENIX WEEKLY PLANNING 5/7/2007 Don Lynch (Thursday is Monday this week)
Preparations for Run 6 Don Lynch February 13, 2006.
PHENIX WEEKLY PLANNING 10/26/06 Don Lynch. 10/20/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown.
1 1/29/2009 PHENIX WEEKLY PLANNING 1/29/2009 Don Lynch.
Technical Support /16/08 PHENIX WEEKLY PLANNING 10/16/2008 Don Lynch.
PHENIX WEEKLY PLANNING 3/1/2007 Don Lynch March: in like a lion Out like a lamb.
12/08/20111 PHENIX WEEKLY PLANNING 12/08/2011 Don Lynch.
2/27/ PHENIX WEEKLY PLANNING Feb. 27, 2014 Don Lynch.
1 7/9/2009 PHENIX WEEKLY PLANNING 7/9/2009 Don Lynch.
PHENIX WEEKLY PLANNING 6/8/06 Don Lynch. 6/8/2006 Weekly Planning Meeting 2 This Week Rec’d TOF West Access: move HBD to Dead Turtle Position Sec’y of.
PHENIX WEEKLY PLANNING 3/30/06 Don Lynch. This Week MPC air flow started BLM source test HBD transparency monitor hutch work and cable tray 1 st MPC Card.
1 11/25/2010 PHENIX WEEKLY PLANNING 11/25/2010 Don Lynch.
2/20/ PHENIX WEEKLY PLANNING Feb. 20, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 8/31/06 Don Lynch. 8/31/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameDurationStart_DateFinish_Date PHENIX Shutdown.
PHENIX WEEKLY PLANNING 8/24/06 Don Lynch. 8/24/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameDurationStart_DateFinish_Date PHENIX Shutdown.
1 2/19/2009 PHENIX WEEKLY PLANNING 2/19/2009 Don Lynch.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 2/14/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
PHENIX WEEKLY PLANNING 2/16/06 Don Lynch. Prep for Run 6 Completed.
Presentation transcript:

PHENIX WEEKLY PLANNING 2/2/06 Don Lynch

Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines dried [DONE] MuTr HV & LV repairs and tests [DONE] Install Lampshades on MMS [DONE] Receive MPC South (Received 1/8/06) Prepare EC for move to IR (carpenters) [DONE] Re-install seismic restraints on WC [DONE] Prepare MPC South (install LED’s, bench elec. tests) [DONE] Uninstall TOF West Installation platform [DONE] Install MPC South [DONE] Install HBD rack (lower only) [TODAY] Move MUID collar to IR [DONE] Install MPC cable tray [DONE]

Remove upper HBD I-beams, use fg unistrut for now [DONE] EC roll in Carpenters to do platforms [DONE] Pink sheets [DONE] MPC South installation [DONE] CM area sweep for magnet test [DONE] Magnet tests [DONE] Continue blue sheets [DONE] Connect EC Services [DONE] Install shield wall [DONE] DC repairs [DONE] Move MMS North Install MUID collar Fabricate BLM Test Diode holders Fabricate RXNP Mag Test Fixture Complete CM area HBD plumbing [DONE] Prep Schedule for Run 6

Week of Feb. 6 – Feb. 10, 2006 RXNP magnet tests Install plug door Start of PHENIX watch shifts Start flammable gas flow Blue ring ready for beam Feb. 6, limited IR access All up commissioning Start of Run Party Week of Feb. 13- Feb. 17, 2006 Yellow ring ready for beam Install MPC electronics on eyebrow All up commissioning Week of Feb. 21 – Feb. 24, 2006 (Pres. Day Holiday 1/20/06) Install Beam Loss Monitor Start of run shifts Week of Feb. 27 – Mar. 4 Start physics runs Prep Schedule for Run 6

CM Lift Table Extensions First extension received from Central Shops. Minor modification needed to mount rails. Otherwise works as planned. Was successfully used for DC repairs Plug lock for lift table. Table is to be operated by authorized techs only. To be locked out when BLM test fixture is installed. Drift Chamber Repairs

MPC Installation MPC electronics to be on top of MuTr rack on eyebrow Electronics not ready yet

RXNP Magnet Field Tests

Made from fiberglas unistrut with precision cut angles. To be supported from lower HBD I-beams PMT’s

RXNP Magnet Field Tests Installation

Beam Loss Monitors BLM Stand with BLM’s and Chipmunks Stripixel sensors and diodes go on this surface

Beam Loss Monitors Need to make holders for diodes. 2 size diodes 8 of each for test. Bare stripixel sensors (2)

Revised BLM support design

Other Projects TOF West No further work until next shutdown HBD A ll gas work inside IR to be completed prior to end of shutdown Will need new He bags? Plan for installation of ½ final detector late in run 6 using lower rack only Plan B – install prototype during run 6 Need to design & fabricate cable support structure for prototype and final design Bridge Utilities No water until next summer. Shutoff valves to be closed and posted until manifolds are tested MPC North New enclosure & fixture design to be based on lessons learned from south installation RXNP No design info yet?

HBD Electronics HBD High Voltage Rack (to be located on Bridge) HBD low voltage and signal electronics rack (installed on east-central pedestal)

HBD Gas Supply Electronics rack In Gas Mixing House HBD transparency monitor hutch ready to install instrumentation when it arrives TOF/HBD Gas Shared Flow Control Rack HBD to be single pass for Run 6

Gas Pad Location for CF4 bottles HBD Gas Supply Stainless Gas Lines to top of CM Piping in IR complete. Flexible lines allow CM to move for maintenance HBD Gas flow panel Installed. HBD in and out lines are short circuited and now flowing Argon to maintain cleanliness.

HBD Support X, Y, Z adjustments on this side HBD Support X, Y adjustments on this side HBD Mechanical Support Design of details complete ready for fabrication. Last minute changes to HBD mounting interface to be addressed before routing drawings to shops for fabrication.

HBD Prototype Mounting Prototype can not use final design mounting due to differences in location of connectors and other basic design differences. Final HBD design is not yet fixed. Prototype mounting to be fabricated from fg unistrut.

LN 2 Storage Dewar for BBC Acme Cryogenics 6000 Gallon vessel 23’ long x 10’4” high, 7’ wide footprint 219psig MAWP, we would set MOP to 125psig. Original Mfr.: Linde, NB #6363 ser.#206 Remanufactured by Chart

LN 2 Storage Dewar for BBC LN 2 Vessel to go here

Original Gas Pad Design ~1998. Access road shown was rerouted to north side of pad. Original design indicated 44 ton tank. Estimated weight of 6000 gallon tank 30 tons when full, 10 tons when empty. Experimental safety review required. LN 2 Storage Dewar for BBC

C-A Tasks Prior to Run 6 Build Shielding wall Remaining blue sheets Postponed Shutdown 2006 Install access platforms from EC top north and MMS Replace emergency fan louvres Rewire/add IR ceiling lights on emergency power Replace WC sliding platform hoisting cables Analyze/balance rack water distribution Mixing house exhaust fan maintenance

PHENIX Engineering & Tech Support Web Pages Links for weekly planning meeting slides, long term planning and other technical info can be found from the web site: