Ministry of Land, Infrastructure, Transport and Tourism Method for Ensuring the Implementation of Supervision NAKAE Hajime Architecture & Building Engineering.

Slides:



Advertisements
Similar presentations
QUALITY SYSTEM AUDIT PRINCIPLES C. DAS, ADDITIONAL DIRECTOR
Advertisements

Special Inspections
THE ART OF REPORT WRITING for BHILAI STEEL PLANT, KURG and local chapters of ICAI&IIA SATURDAY 4 TH AUGUST 2007.
University Research Ethics Committee Workshop on procedure and data protection issues 30th May 2008.
NE 127 – Codes, Standards, and Regulations American Welding Society INSTRUCTOR: Chattanooga State CC.
“TI” Ohhhh….. (TIO) (No TIO is not a person!) What is it all about?
Re-use, recycling and future of demolished buildings in Russia Dasha Sinishin Irina Dombrovskaya Aleksandra Pravikovskaya Ksenia Latushko Evgenia Solodchenko.
Sustainable Energy Systems Overview of contractual obligations, procedures and practical matters KICK-OFF MEETING.
FPSC Safety, LLC ISO AUDIT.
ISO 9000 Certification ISO 9001 and ISO
Contractor & Owner Roles in Health & Safety. Safety Topics Contractor Role in Health and Safety Owner Role in Health and Safety.
Contractor Issues North TX Spring Thaw February 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES As-Built Drawings and Commissioning Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional.
The Role of the Internal Auditor for Maintaining System Compliance and Promoting Continuous Improvement Wayne M. Uttke
Review of Draft AC 021 – Maintenance Contracting Draft AC 022 – Task and Shift Handovers Nie Junjian Airworthiness Inspector COSCAP-NA.
Aleksander Bakirov Head of Supervision Division phone: fax:
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
1 PUBLIC PROCUREMENT AND USE OF FIDIC CONTRACTS IN LATVIA Procurement Monitoring Bureau 2013.
Office of Highway Safety Oversight of Construction Projects George Black.
Chapter 42 Construction Specifications. 2 Links for Chapter 42 Introduction Construction Specifications Construction Documents.
MURK Presented By Awni Alsous, MURK Engineer 2010.
Software Inspections. Defect Removal Efficiency The number of defects found prior to releasing a product divided by The number of defects found prior.
TOOLS To successfully implement Section 3 requirements on construction projects Tom Crabson, CDBG Contract Compliance Officer Community Development Commission,
Regulatory Reform (Fire Safety) Order 2006 A Major Change to Legislation.
1 Legal Aspects of Implementing the Crown Land Policy Presentation to the Ministry of Natural Resources, Government of the Turks and Caicos Islands By.
Specification & Quantities Estimating
NEES-CABER Group Meeting 01/25/08 Research Team at GW Professor Pedro F. Silva Graduate student Linh Nguyen.
Updates to Title 8. Anticipated Timeline… July - December 2013 Ideas Compiled Research and Drafting January 2014 Planning Commission Worksession Review.
Wataru GOJO, NILIM, MLIT, Japan 1 Establishment of NILIM & IAI-BRI until January 2001 Building Research Institute (BRI) Public Works Research Institute.
VI. Developing a VSMP Program General Stormwater Training Workshop.
E4014 Construction Surveying Job Organisation and Control.
Project Schedules The Cabinets New Categories of Scheduling.
S1: Introduction Financial Audit A course for IA&AS Officers.
Service Quality Innovation Trust Safety The Samet Way “Managing the Company Cash Position” Accounts Payable (AP) should always be less than Accounts Receivable.
Japan’s position and proposal on draft gtr of EVAPO and Crankcase Emission on draft gtr of EVAPO and Crankcase Emission Ministry of Land, Infrastructure,
Organization Chart of Department of Public Works and Town & Country Planning (DPT) Director - General Internal Audit Unit Deputy Director - General Office.
Development of Agreement Concerning the Adoption of Uniform Conditions for Periodical Technical Inspections of Wheeled Vehicles and the Reciprocal Recognition.
Page  1 Splendid Concreting & Construction Implements ISO 9000 Quality Management Systems P: F: W: E:
Milestones for Nuclear Power Infrastructure Development Establishment of A Regulatory Framework Gustavo Caruso, Section Head, Regulatory Activities Section.
Preparation Plan. Objectives Describe the role and importance of a preparation plan. Describe the key contents of a preparation plan. Identify and discuss.
Managing Quality with Quality Through the Construction Management Leadership Manual Presented by: Aleksandr Sergek, PE, PMP Allison Justiniano, LEED AP.
Field Office Construction, Technical Assistance and Quality Assurance NEDC Construction Inspection for Field Office Activities USDA is an equal opportunity.
NRA HD 16 Inspections of Temporary Safety Measures Alastair de Beer, Chartered Engineer, MIEI NRA Project Manager (Safety) April 2012.
Construction Inspection for Field Office Activities Welcome by SCE Introductions Name Position (SCT, SC, DC, CET, ETC) Location Instructors 1.
1 Service Coordinator Orientation FN R. CollESH SectionX8518.
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 27 – Environment and Climate Change.
1 Statements of Work – Getting Them Right!!. 2 Today’s Agenda A.The Basics B. Sources of Information C. Scenario #1: Procurement is in the loop D. Scenario.
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 28 – Consumer and Health Protection.
Verification vs. Validation Verification: "Are we building the product right?" The software should conform to its specification.The software should conform.
Environmental Requirements for North West Grid Floodlight Project Compiled by: Silindile Mbhele.
Edexcel BTEC Level 2 Diploma in Construction Members of the Construction Team Unit 1 Structure of the Construction Industry.
©Ian Sommerville 2000Software Engineering, 6th edition. Chapter 19Slide 1 Verification and Validation l Assuring that a software system meets a user's.
Role & Responsibility for Quality Assurance What is your opinion on this topic heading? Role and Responsibility of: Role and Responsibility of….(Er.) for.
QUALITY ASSURANCE MODULE 3. Definitions Quality Assurance - A process/effort that ensures that processes are followed, that the processes of doing right.
Statements of Work – Getting Them Right!!
THIRD PARTY INSPECTION BY QUALITY SUPERVISION CONSULTANTS
Structural Funds Financial Management and Control, Romania
((Organizing relationship between the Owner and Contractor involved in construction project at Palestine)) By: Maw`ed Abu Shamleh Malaak Hamaydi Supervisor:
Drawings Introduction to FIDIC - Drawings -.
ISO 9001:2015 Auditor / Registration Decision Lessons Learned
Temporary Works Co-ordination
MnDOT Office of Civil Rights Disadvantaged Business Enterprise (DBE) Special Provisions Update March 2017.
بازاریابی و بازرگانی زمستان 93.
Quality Control Personnel Training
DTF implementation Roles and responsibilities
Role and Responsibility for Quality Assurance Vishnu P. Shrestha
PDO Second Alert Photo explaining what was done wrong
Software Reviews.
Role and Responsibility for Quality Assurance Vishnu P. Shrestha
Fiber Reinforced Polymer Systems
Presentation transcript:

Ministry of Land, Infrastructure, Transport and Tourism Method for Ensuring the Implementation of Supervision NAKAE Hajime Architecture & Building Engineering Division, Government Buildings Department, MLIT

Problem caused by inconsistency of current system of supervision and/or inspection 1.Malicious modification of the structural statement by a building engineer  Concerned projects: 205 (1990~2005)  Projects modified maliciously : 99 (1997~2005) 2. Wrong execution in the construction work for a government office building  Mistake of the size of a column  Mistake of the number of main reinforcements

Column Section and Arrangement of Bar Column executed wrong in construction work Execution drawing M.R. 12-D32 Main Reinforcement M.R. 18-D32

Situation of the Construction Work

Cause of the Wrong Execution contract Supervision and/or inspection MLIT Sub- contractors General Contractor Supervising Office 1.Sub-contractor made wrong document for processing main reinforcements. 2.General contractor overlooked the mistake of document. 3. Main reinforcements were assembled wrong by sub- contractor. 4. General contractor overlooked again the wrong execution of assembling work. 5.Supervisor and inspector overlooked it, too.

Regulation in the Specification Steel Reinforcement Arrangement Inspection The reinforcing bars arrangement of the main structural portion shall be inspected by the Supervisor prior to the casting of concrete. The Common Specification for Architectural Construction Work The Supervising Method for Architectural Construction Work Steel Reinforcement Arrangement Inspection Main supervising points : Numbers, cover of concrete, intervals, positions, and so on of major arrangement of bars Supervising action : Visual inspection and /or measurement Supervising guideline : Conformity to the working drawing will be verified. Reference materials : Construction report and Photos

Problem to be solved in the Supervising Method 1.Inspection method is not clarified concretely. 2.It cannot be traced later whether all the main supervising points were inspected. 3.The extent to which each concerned body take charge of is ambiguous.  General contractor  Supervisor  Inspector

Consideration in Reviewing the Method 1.The inspection implemented by all the concerned bodies must be recorded. 2. It must be recorded to have inspected all the main supervising points. 3.All the concerned bodies and the content of the inspection must be traceable. MLIT will examine and establish a checklist and/or other materials.

Example of Checklist

Theme of Examination in the Future 1.Application to other construction work 2.Application to design

Thank you for your attention