Cavity Database Status J. Kerby with thanks to the Cavity Database Team MLSCRF Webex 9 Dec 2009.

Slides:



Advertisements
Similar presentations
StEPS at EIAWhere We Are Now Paula Weir and Sue Harris Energy Information Administration, U.S. Department of Energy ICES3 Topic Contributed Session: Generalized.
Advertisements

What is New in Inventory & Purchasing? Presented by: Derek Kratz.
 Microsoft Excel is an electronic spreadsheet.  As with a paper spreadsheet, you can use Excel to organize your data into rows and columns and to perform.
Technical BI Project Lifecycle
Effective Project Management: Traditional, Agile, Extreme
Workflow Tracking in Millennium and Excel Les Lynam, Director of Technical Services, Kirkpatrick Library, Central Missouri State University.
RIS Research Consultation Outcome Survey Report to Public Services Council on the Pilot January 19, 2006 This report, the web questionnaire and related.
Chapter 7 Data Management. Agenda Database concept Import data Input and edit data Sort data Function Filter data Create range name Calculate subtotal.
1 Computing for Todays Lecture 17 Yumei Huo Fall 2006.
IS 1181 IS 118 Introduction to Development Tools VB Chapter 03.
1 CSc Senior Project Software Testing. 2 Preface “The amount of required study of testing techniques is trivial – a few hours over the course of.
Microsoft Office Word 2013 Expert Microsoft Office Word 2013 Expert Courseware # 3251 Lesson 4: Working with Forms.
Progress of ILC cavity gradient database and yield C.M. Ginsburg On behalf of the ILC Database Group Baseline Assessment Workshop, Tsukuba/WebEx September.
Netcen 14. UK Experience of Implementing the UNFCCC CRF Reporter John Watterson & Melissa Downes.
XNA Studio: Introduction to XNA Brian Keller Product Manager Microsoft Corporation.
Before I stated the database I had to save it into My Documents> ICT> You can do it> D201EPORTFOLIO> Evidence For the field group food item, I set the.
Semester 1, 2003 Week 7 CSE9020 / 1 Software Testing and Quality Assurance With thanks to Shonali Krishnaswamy and Sylvia Tucker.
ILC08 Chicago Global Design Effort 1 Discussion of Optical Inspection and Temperature mapping Results Several new inspection and mapping systems.
Cavity Gradient Yield Plots Update, August, 2009 As reported by Akira Yamamoto to the EC and the ILCSC August, 13, 2009 On behalf of the ILC Cavity Global.
Design IS 101Y/CMSC 101 Computational Thinking and Design Tuesday, October 15, 2013 Carolyn Seaman University of Maryland, Baltimore County.
Introduction to Standard Reports. Standard Reports 2 How to get information out of AQS Standard Reports Site / Monitor Metadata Detail Data Reports “
Jim Kerby, Fermilab for Rongli Geng and the S0 Cavity Team 23 May 2010 Current Status of SCRF Cavity Development SCRF Cavity Technology and Industrialization.
Peter H. Garbincius November 20, 2008 Cost Management LCWS08 - UIC 1 ILC Cost Management J. Carwardine, T. Himel, F. Lehner,T. Shidara, L. Hagge, P. Garbincius,
1 Integrating Microsoft Office 2003 Tutorial 2 – Integrating Word, Excel, and Access.
Cavity Yield Re-Evaluation Plan C.M. Ginsburg (Fermilab) July 10, 2009 (Essentially a copy of presentation June 24, 2009 to SCRF-ML WebEx meeting with.
E. KAKO (KEK) 2009' Dec. 22 S1-G Webex meeting Global Design Effort 1 Final Results of KEK Cavities for S1-Global Eiji Kako (KEK, Japan)
Three State Data Warehouse 1 Cassie Archuleta Tom Moore May 6, 2014 Progress Update for 3SDW Development.
Update on Global Cavity Database and Yield Evaluation DESY Database Group: D. Gall (DESY) V. Gubarev (DESY) S. Yasar (DESY) 28.Mar.2010Yamamoto/Ginsburg.
1 © State of New South Wales through the NSW Department of Education and Training, This work may be freely reproduced and distributed for personal,
Summary of Timeline Discussion: The three timeline options in the following slides reflect opportunities to evaluate progress on the draft and potential.
Workshop 1.4: ESPON Database ESPON Internal Seminar November 2011 Kraków,Poland ESPON M4D Project - LIG (Grenoble Computer Science Lab) Partner Jérôme.
1. First of all we opened up a spreadsheet and started adding the data. 2. To work out the total cost for platinum, you times cell b5*c5 3. To calculate.
Superconducting rf test facility STF 1 Optical Inspection update at KEK Ken Watanabe ( KEK ) ILWS08 in Chicago 17-Nov-08.
SCRF Monthly WebEx Meeting Agenda 1. Report from PMs (15 min.) 2. Report from GLs (10 min.) 1. Progress Reports and Discussions: TOPIX (each.
Cavity Gradient for the R&D and ILC Operation Akira Yamamoto ILC-GDE SCRF Presented at the AD&I meeting held at DESY, Dec. 2-3, 2009 A, Yamamoto,
R.L. Geng, KEK September 9, 2010 Global Design Effort 1 Near Term ILC Gradient R&D R&D Specification and Standardization Gradient Gradient Yield/Scatter.
Prepare an Asset List Project 4 Due date: Friday, September 24 th.
AAP Review on SCRF to be prepared Akira Yamamoto, Marc Ross, and Nick Walker ILC-GDE Project Managers To be presented at ILC-10, Beijing, March 26, 2010.
Weekly Report By: Devin Trejo Week of July 6, 2015-> July 12, 2015.
(Spring 2015) Instructor: Craig Duckett Lecture 08: Tuesday, May 5, 2015 Mere Mortals Chap. 6 Summary, Team Work Time 1.
Fermilab 2 Dec 2009CM Ginsburg Global Cavity Database Report C.M. Ginsburg (Fermilab) On behalf of the database group (as part of S0 effort):
XP New Perspectives on Integrating Microsoft Office 2003 Tutorial 2 1 Integrating Microsoft Office 2003 Tutorial 2 – Integrating Word, Excel, and Access.
David Adams ATLAS DIAL: Distributed Interactive Analysis of Large datasets David Adams BNL August 5, 2002 BNL OMEGA talk.
SPREADSHEETS Objective 6.02 Explain advanced spreadsheet concepts and functions Replication Features.
D Q 20 Oct. 2007Quality flags, D.Verkindt1 Quality flags in Virgo Data Base D. Verkindt, LAPP On behalf of the Virgo « data quality task force »
1.Report from PMs 2.Report from GLs 3.Special report and discussions 1.SCRF report at AAP and response from AAP (C. Ginsburg, R. Geng) 2.S1-Global assembly.
Cavity Yield Re-Evaluation Plan C.M. Ginsburg (Fermilab) June 24, 2009.
Superconducting rf test facility LCWS 2010 in Beijing, 28 Mar 2010, Ken Watanabe Replica-method and local grinding repair K. Watanabe (KEK) LCWS 2010 in.
2011 ACSI Survey Summary HDF/HDF-EOS Workshop Riverdale, MD April 18, 2012.
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
Paul Alexander 2 nd SKADS Workshop October 2007 SKA and SKADS Costing The Future Paul Alexander Andrew Faulkner, Rosie Bolton.
SCRF Cavity WebEx Meeting May 17, 2010 Reports from PM (10 min.) – Brief report from ILC-PAC – Industrialization workshop as IPAC satellite meeting, Kyoto,
Software Engineering Lecture 8: Quality Assurance.
Unit 8: Implementation, Part II Seminar Wednesday pm ET.
Public Libraries Survey Data File Overview. What We’ll Talk About PLS: Public Libraries Survey State level data Public library data (Administrative Entities)
Lead from the front Texas Nodal 1 Reduction of MMS Vendor Effort for TPTF January 8, 2008 Murray Nixon Sai Moorty.
Recent Results of Vertical Test for S1-Global Project at KEK-STF Y. Yamamoto, H. Hayano, E. Kako, S. Noguchi, H. Sakai, M. Satoh, T. Shishido, K. Umemori,
ILC Gradient R&D Rongli Geng Jefferson Lab ILC Main Linac WebEx Meeting July 28, 2010.
Ethernet to the Cell Tracking Tool The prototype that grew, and grew and grew!
TUFMAN April 2015, Noumea, New Caledonia.
Update on S0 Work in the Americas Region Camille Ginsburg (FNAL) 2 June 2009 Slides/Info from: Zack Conway (Cornell) Rongli Geng (JLab) Genfa Wu, Dmitri.
Baseline The baseline at July Previously there was a lack of consistency for: Pathways into specialist clinics; Policies, procedures and guidelines.
ENERGY STAR Products Database Kathleen Vokes, US EPA November 20, 2014.
1 CAA 20 th Cross Calibration Meeting, MPS, Gottingen 16th Oct 2014 CAA Cross Cal Meeting Oct 2014 Pipeline Automation Chris Perry.
A project is a set of series of tasks that need to be completed in order and in time to reach specific goals. A project is a temporary that means it has.
Cavity Gradient R&D Status and Future Plans for TDP-2
(Winter 2017) Instructor: Craig Duckett
Input coupler assembly, high power and thermal performance in S1-Global at KEK E. KAKO (KEK) 2011' Dec. 07 TTC meeting in Beijing.
2. SCRF General Preparation for the AD&I Preparation for AAP Review
Presentation transcript:

Cavity Database Status J. Kerby with thanks to the Cavity Database Team MLSCRF Webex 9 Dec 2009

Motivation Common data sample, well defined data cuts –Everyone uses the same data to make plots – a common denominator in yield calculations –Data cuts can be easily specified, and anyone could reproduce your results Data entry rules for reliable and reproducible results –All RF tests from the last couple of years are included; may be flagged for exclusion –Uniform criteria for data entry: only allowed values for as many as possible items –Define everything which might vary or have underlying subtleties, e.g., “LABX#1" might be a final surface treatment referenced as a well-defined recipe anyone can look up –No private/sensitive vendor data –Anything referred to in a comment field must be for information only, and not data selection purposes –Minimize effort required for compliance –Provide regular updates at predetermined (by Akira) times

Original Plan FALC meeting July 13, 2009 –Provide an example plot of production yield, citing caveats (whatever they are at the time) Using preliminary and incomplete data for past 2-3 years from the simple Excel spreadsheet format, no web interface –Provide the people list, and the plan End July 2009: Determine whether DESY DB is viable option, and timescale for implementation ALCPG/GDE Sept Oct. 2, 2009 Dataset is web-based (thanks to support by DESY) –Some well-checked, easily explainable, and near-final plots available for discussion such as Production yield Qualified vendors New vendors Process yield Time evolution of some quantities End Nov. 2009: With colleagues’ input, finalize DB tool, web interface, standard plots, possibly with longer-term tool improvement plans NOW: Production 4 included; DB tool in Beta test; final cross checks of data; development of plotting routines underway Production of Chapter 4 Fig this week; 4.1.2(?) as well but not from same source (needs to be fixed longer term)

4 Compare 1 st and 2 nd pass yields, qualified vendors 1 st pass 2 nd pass improvement degradation yield is improved after 2 nd pass As presented at AD&I; 4 Dec cross checks showed two Prod 4 cavities w/o 120 C bake that should be removed

New Vendors: MHI and AES Performance of first cavities was poor – now improving! First four from each vendor produced differently, therefore start including starting from number 5

New Vendor Improvement: First successful test

7 Compare first-pass of new/established vendors As presented at AD&I; 4 Dec cross checks showed two Prod 4 cavities w/o 120 C bake that should be removed

Summary Database team has done an excellent job executing their plan –C.M.Ginsburg, R. Geng, S. Aderhold, K. Yamamoto, Z. Conway –Important support from D. Gall, V. Gubarev, S. Yasar & DESY Mgmt Database expected to be ‘on-line’ in the next couple of weeks For SB2009 two separate plots will be generated and inserted side-by-side: 1st pass and 2nd pass production yields, including Accel/RI, Zanon, and AES5-9 (include those DESY production 4 cavities with "standard-EP." MHI cavities will not be included. Further development of interfaces towards a ‘standard’ set of plots