Dzero RunIIb Sensor PRR, August 8, 2003 - Marcel Demarteau Slide 1 DØ Inner Layer Sensor Production Readiness Review August 08, 2003 M. Demarteau for the.

Slides:



Advertisements
Similar presentations
Software Quality Assurance Plan
Advertisements

January 22, Run IIB Silicon workshop Purdue University Bortoletto Daniela, Bolla Gino, Canepa Anadi Hamamatsu testing I-V characteristics up to 1000V.
23/04/2008VLVnT08, Toulon, FR, April 2008, M. Stavrianakou, NESTOR-NOA 1 First thoughts for KM3Net on-shore data storage and distribution Facilities VLV.
128 September, 2005 Silicon Sensor for the CMS Tracker The Silicon Sensors for the Inner Tracker of CMS CMS Tracker and it‘s Silicon Strip Sensors Radiation.
Graduate System for Management of Admissions, Alumni & Records Tracking (Grad SMAART) January 8, 2007 Office of Graduate Studies.
Barrel Module Database Presented at the SCT Barrel PAR 15 th May 2003 Dave Robinson, Cambridge Introduction - Database access - Barrel module data User.
Slide 1CMS Database Issues-Derek BargeDOE review, January 20, 2004 CMS Database Issues Derek Barge.
US CMS Silicon Tracker – PAC Meeting – FNAL - Nov 3, Incandela 1 US CMS Tracker Outer Barrel (TOB) Silicon Project Joe Incandela Fermilab Level.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
L. Greiner 1IPHC meeting – September 5-6, 2011 STAR HFT Plans for the next year A short report on review results and plans for TPC – Time Projection.
Sensors for CDF RunIIb silicon upgrade LayerR min (cm)1 MeV eq-n cm * * * * * *10.
October 7, 2003 US Silicon Tracker group Sergey Korjenevski University of Rochester 1 Quality Assurance Test Stand University of Rochester oQTC at Rochester,
QA/QC working group Working group ATLAS NSW - QA/QC working group - J. GIRAUD (20/02/2014)1.
Sensor overview Ulrich Heintz Brown University, Providence, RI 6/18/2015U. Heintz - Sensor Overview 1.
The SAM-Grid Fabric Services Gabriele Garzoglio (for the SAM-Grid team) Computing Division Fermilab.
October 2001General Tracker Meeting IEKP - Universität Karlsruhe (TH) 1 Results on proton irradiation tests in Karlsruhe F. Hartmann IEKP - Universität.
Dzero RunIIb Sensor PRR, August 8, Marcel Demarteau Slide 1 DØ Inner Layer Sensor Production Readiness Review August 08, 2003 M. Demarteau, G. Ginther.
D0 Run IIb Review 15-Jul-2004 Run IIb DAQ / Online status Stu Fuess Fermilab.
Introduction to Database Systems Motivation Irvanizam Zamanhuri, M.Sc Computer Science Study Program Syiah Kuala University Website:
Sergey Korjenevski KSU The Run IIb Silicon Tracker Workshop, Dec 12-13, out of 23 Status update and Test results for Run2b Si sensors at KSU Sergey.
Chapter 14 Information System Development
This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC Michigan State.
June 6 th – 8 th 2005 Deployment Tool Set Synergy 2005.
Frank Lehner U Zurich Characterization of inner layer sensors DØ Inner Layer Sensor Production Readiness Review FNAL, 8/8/2003 M. Demarteau, R. Demina,
Frank Lehner U Zurich Proposal to use the Atlas SCT database for Run IIb  Why to switch now? u existing database (db) at UIC incomplete and unlikely to.
Sergey Korjenevski KSU DØ Run2b Silicon meeting, Oct 10, Preliminary testing results of Elma and HPK sensors Sergey Korjenevski Kansas State University.
Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther.
Important informations
Team Members Team Members Tim Geiger Joe Hunsaker Kevin Kocher David May Advisor Dr. Juliet Hurtig November 8, 2001.
DOE Rev of Run IIb Sep 24-26, 2002  Silicon software and simulation Scope:  Design and/or modify software tools for Run IIb silicon tracker simulation.
Silicon RunIIb Workshop, Dec , A. Bean, M. Demarteau Slide 1 Workshop  Workshop is to “Move beyond the Technical Design Proposal”  Many.
Concluding Summary WBS1.1.2 SCT Subsystem A. Seiden BNL March 2001.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
Thomas Jefferson National Accelerator Facility Page 1 SVT – Review January Sensors for the Silicon Vertex Tracker Amrit Yegneswaran.
Testing Site Qualification Purpose: –Perform detailed scans of the silicon microstrips to make sure they all work. –Check HPK. Candidates for Certification:
ERP Implementation Fundamentals Richard Byrom Oracle Consultant, Speaker and Author
DOE Rev of Run IIb Sep 24-26, Silicon sensors procurement and quality assurance WBS Regina Demina Kansas State University Frank Lehner University.
Integrated Monitoring Dashboard SEAP/BTIS/DB&I/Mar Integrated Monitoring Dashboard An Innovative Monitoring Approach Proposal by BTIS/DB&I.
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
DZero RunIIb PMG June 7, Run IIb Project Status Vivian O’Dell.
CMS Si Tracker Project - US CMS Meeting at Riverside – May 19, US CMS Tracker Outer Barrel (TOB) Silicon Project Tim Bolton (for Regina Demina)
ALICE Pixel Operational Experience R. Santoro On behalf of the ITS collaboration in the ALICE experiment at LHC.
Unit 9: Distributing Computing & Networking Kaplan University 1.
1 Silicon Testing at KSU Sergey Korjenevski Kansas State University 06/18/2002 (11 slides total)
Rev of Run IIb, Nov 4-8, 2002, A. Bean 1 Silicon Management  Organization and Management  Schedule  Resources  Conclusions Alice Bean Univ. of Kansas.
V. O’Dell, D0 RunIIb PMG 4-Feb Dzero Run IIb PMG  Agenda u Overview & Management News: V. O’Dell u Trigger Upgrade Status:P. Padley u Silicon closeout.
DZero Run IIb Rev Nov 05 ‘03 1 Kotcher Agenda (from Rebaselining Review)  Introduction (Kotcher – 10’)  Trigger & DAQ/Online (Wood – 30’) u AFE II/TriP.
Run Iib Workshop Dec 12-13, 2002 Silicon sensors procurement and quality assurance WBS Regina Demina Kansas State University.
Integration integration of all the information flowing through a company – financial and accounting, human resource information, supply chain information,
Oracle for Physics Services and Support Levels Maria Girone, IT-ADC 24 January 2005.
Production Readiness Review of L0/L1 sensors for DØ Run IIb R. Demina, August, 2003 Irradiation studies of L1 sensors for DØ 2b Regina Demina University.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Silicon Strip Detector.
SiD Vertex Detector Mechanical R&D (May Apply to Other Concepts) Bill Cooper Fermilab.
Silicon Mtg July 24th, Eckhard von Toerne, KSU RunIIb Silicon Database Eckhard von Toerne Kansas State U. July 24 th, 2003.
Production Database Apollo Go, NCU Taiwan Preshower Silicon PRR July 5, 2001.
CABLING SYSTEM WARRANTY REGISTRATION. PURPOSE OF CABLING REGISTRATION.
November 1, 2004 ElizabethGallas -- D0 Luminosity Db 1 D0 Luminosity Database: Checklist for Production Elizabeth Gallas Fermilab Computing Division /
GCSE ICT 3 rd Edition The system life cycle 18 The system life cycle is a series of stages that are worked through during the development of a new information.
1 The System life cycle 16 The system life cycle is a series of stages that are worked through during the development of a new information system. A lot.
Run IIb Database Status Eckhard von Toerne, June 12 th, 2003 RunIIb database decision: to use use ATLAS database design and to modify it to D-Zero needs.
A New Inner-Layer Silicon Micro- Strip Detector for D0 Alice Bean for the D0 Collaboration University of Kansas CIPANP Puerto Rico.
Building Preservation Environments with Data Grid Technology Reagan W. Moore Presenter: Praveen Namburi.
Chang, Wen-Hsi Division Director National Archives Administration, 2011/3/18/16:15-17: TELDAP International Conference.
Preparation for silicon sensor arrival sensor delivery schedule aggressive expect 130 L2-L5 sensors each in July and August sensor lot/batch will likely.
Class Orientation Lingma Acheson Department of Computer and Information Science IUPUI CSCI N207 Data Analysis with Spreadsheets 1.
LHCb PRR - Girish D. Patel1 QC and Process Control G. D. Patel.
9/18/2018 Department of Software Engineering and IT Engineering
Building an Observation Data Layer
CDS-EL IRR Closeout 28 March 2019 J.G. Weisend II, Chairman.
Status of Hamamatsu Silicon Sensors
Presentation transcript:

Dzero RunIIb Sensor PRR, August 8, Marcel Demarteau Slide 1 DØ Inner Layer Sensor Production Readiness Review August 08, 2003 M. Demarteau for the Run IIb silicon group ‘General Quality Assurance of Silicon Sensors and Parts Flow ’

Dzero RunIIb Sensor PRR, August 8, Marcel Demarteau Slide 2 Sensor Delivery  The production at Hamamatsu calls for the following delivery schedule:  The terms of the contract with Hamamatsu are such that the project has six months after receipt of the sensors to reject them

Dzero RunIIb Sensor PRR, August 8, Marcel Demarteau Slide 3 Parts Flow »All sensors are ‘checked in’ at Fermilab undergo visual inspection »Outer Layer sensors: ] Fermilab: IV/CV ] 10% to Stony Brook, KSU for strip tests in ratio 2:1 »Inner layer sensors: ] All tests at Rochester

Dzero RunIIb Sensor PRR, August 8, Marcel Demarteau Slide 4 QA Program  Sensor QA and Distribution  Rene Jones receives sensors, enters data into database  passes sensors for I-V, C-V and visual inspection »Mme. Mao will do all C-V, I-V measurements and long-term burn-in »Nina Ronzhina will do all visual inspection with Rene Jones as backup »Ralf Bernhard will oversee the whole QA program ] backup help from Ron Lipton, Marcel Demarteau, L3 managers  passes 10% of sensors for mechanical measurement at Fermilab »based on recommendation from L3 managers »measurements performed on OGP by SiDet metrology group  Outer layer sensors »ship 10% of the sensors to various test sites, based on L3 manager recommendation ] Stony Brook : KSU = 2/3 : 1/3 ] Stony Brook: Bob McCarthy, Hai-Jiang Gong ] KSU: Robin Sidwell, Ron Sidwell + graduate students  Inner layer sensors: »ship 100% to University of Rochester ] Sergey Korjenevski + graduate students

Dzero RunIIb Sensor PRR, August 8, Marcel Demarteau Slide 5 Irradiation QA Program  Sensor Irradiation  All irradiation carried out at KSU JRM using 10 MeV proton beam  1.5% of the test structures with diodes and baby sensors will be irradiated  two sessions 2.5x MeV n equivalent/cm 2 each.  The depletion voltage after the integrated dose must not exceed 350 V and no breakdown can be observed at this voltage or below.  Person in charge of irradiation at KSU is Tim Bolton

Dzero RunIIb Sensor PRR, August 8, Marcel Demarteau Slide 6 Manpower Estimates for Probing  Based on workload, timing of actual strip scan of sensors using switching matrix, maintenance of setup, etc, determined the distribution for various test sites and FTE’s needed All people identified by name, and have accepted the responsibility, for carrying out the proposed QA program. Manpower for measuring irradiated sensors will come mainly from KSU

Dzero RunIIb Sensor PRR, August 8, Marcel Demarteau Slide 7 Database  All information will be stored and tracked in database  Adopted ATLAS database  Old database in MySQL relied on student in computing department at UIC. Concerns about long term stability, support and flexibility motivated us to adopt the ATLAS database design »Oracle based identity relationship ] Item ] Test ] Assembly ] Shipment/Tracking »Ideally suited to silicon detector  Official transfer of designer files from ATLAS by the University of Geneva  Supported by DØ online support group »Stan Krzywdzinski, Vladimir Sirotenko, Taka Yasuda, Stu Fuess »Will provide web interface using existing tools

Dzero RunIIb Sensor PRR, August 8, Marcel Demarteau Slide 8 Entity Relationship  Full entity relationship defined and implemented  Database can be accessed at

Dzero RunIIb Sensor PRR, August 8, Marcel Demarteau Slide 9 Database Use  Common excel format defined for all sensor tests  Scripts have been written which take the information from the spreadsheets and uploads the information into the database  Server at each test site with all information  e.g.  Same principle used for all components in the silicon detector

Dzero RunIIb Sensor PRR, August 8, Marcel Demarteau Slide 10 Conclusions  All outstanding concerns have been addressed regarding  quality control  manpower estimates  site verification  tracking  data storage and retrieval  We believe we have a rigorous quality sensor control program in place  Well defined QA procedures  Certified test sites with trained personnel  Sound manpower estimates and manpower allocated to the project  Part tracking using Oracle database  We thank the committee for helping us addressing some earlier shortcomings