CLIC two-beam modules TEST modules final schemes Dmitry Gudkov BE/RF CLIC Module Working Group.

Slides:



Advertisements
Similar presentations
1 [16-October-2013] [CMWG Meeting] «BE-RF-PM» TBM T0 MBQ TBM T0 MBQ DB SS MB SS TBM T0 MBQ DB SS MB SS MBQ in CLEX Option 1a: MBQ is installed upstream.
Advertisements

CLIC two-beam module integration issues 4 th CLIC Advisory Committee (CLIC-ACE), May 26-28, 2009 CLIC two-beam module integration issues G. Riddone on.
Two Beam Module Thermo-mechanical tests Elena Daskalaki Alex Vamvakas Athanasios Zelios.
SLAC workshop 7-10 July 2009 WP1: microwave based accelerators Status of CLIC X-band high-power components G. Riddone, (contribution from A.
Alignment of DB and MB quadrupoles Hélène MAINAUD DURAND 17/11/2011 With a lot of input from Sylvain GRIFFET.
LCWS12, 25/10/ CLIC two-beam module development Status and future plans G. Riddone Outlook Short introduction CLIC Module Validation program Future.
TMM of the CLIC Two-Beam Module T0 in the LAB – Proceedings to structural FEA Riku Raatikainen
Influence of the Gravity, Vacuum and RF on CLIC Module T0 Behavior R. Raatikainen.
R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 1 CTF3: Highlights of the 1 st run R. Corsini for the CTF3 Team 1.
K. Alam, CLIC workshop, October 16-18, CLIC workshop, October 2007 Working group “ Two beam hardware and integration” Test module in the two.
CLIC alignment studies OUTLINE CLEX Alignment of the components Impact of beam on sensors readings Long term stability of the supports (girders, DB quad)
INTEGRATION OF RF STRUCTURES IN THE TWO-BEAM MODULE DESIGN G. Riddone, CERN, Geneva, Switzerland A. Samoshkin, D. Gudkov, JINR, Dubna, Russia Abstract.
CTC, Two-beam module program (WP CTC-004) CLIC Modules (boundary conditions, technical system design and integration) CDR modules Prototypes.
Status of: CLIC Two-Beam Module Magnets R&D and Procurement 1 Michele Modena, CERN TE-MSC IWLC10, WG8, 21October 2010.
RF Power production at CTF3 X-band structure collaboration meeting,SLAC 6 th July 2009 Steffen Döbert, BE-RF  30 GHz power production  12 GHz power production.
06-November-2013 Thermo-Mechanical Tests BE-RF-PM Review of the CLIC Two-Beam Module Program Thermo-Mechanical Tests L. Kortelainen, I. Kossyvakis, R.
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
X-Band RF Structure and Beam Dynamics Workshop, December 2008 CERN experience with 12 GHz high power waveguide components Igor Syratchev (CERN)
TBL as a 12 GHz power source, overview and first results from commissioning IWLC 2010 workshopSteffen Döbert, BE-RF  Current status of TBL  Status of.
CLEX TBM T0 Cooling system Progress Report 1 V. Soldatov, A. Vamvakas, BE-RF
Discussion points TBM meeting 23/09/2015. Updates Global 3D assembly updated, no severe problems/clashes T1 RF network dimensions updated WPS arms machined.
Dmitry Gudkov BE-RF-PM CLIC Module Working Group Engineering design of the adjustable supporting system for DBQ.
Two-beam Test Stand Status and Results Roger Ruber & Igor Syratchev for the TBTS team.
TM0 components inventory and procurement schedule In LAB testing facility A. Bartalesi.
CTC, Outcome from Two-beam Module Review on15/ G. Riddone,
CLIC08 workshop CLIC module layout and main requirements G. Riddone, on behalf of the CMWG Home page of the TBM WG:
Short range alignment strategy in CLEX and first results CLIC Workshop January 2015 on behalf of : Hélène Mainaud-Durand, Mateusz Sosin Mathieu.
CLIC Module WG 20/07/2009 H. MAINAUD DURAND, BE-ABP/SU Pre-alignment system and impact on module design.
1 Heaters for the cooling system tests (lab modules) A. Samoshkin Last update 04-Apr-2011.
«BE-RF-PM» CLIC prototype two-beam modules Thermal test planning G. Riddone, F. Rossi Introduction Thermal tests 1.Environment 2.Heating and.
cern.ch 1 A. Samoshkin 28-Feb-2011 Progress on CDR module design.
cern.ch International Workshop on Linear Colliders 2010 CLIC TWO-BEAM MODULE DESIGN & INTEGRATION 21-Oct-2010 WG 8 «TECHNICAL SYSTEMS»
1 Thermal tests planning for mock-up TM0 Thermal tests planning for CLIC prototype module type 0 July 17,
CLIC module Experimental program for module array Module review, June 22 nd 2015Elena Daskalaki, BE-RF-MK.
Fiducialisation and initial alignment of components for CLIC Mateusz Sosin on behalf of the CLIC active pre-alignment team CLIC Workshop 2015.
TBTS Test Program & Schedule G. Riddone
cern.ch CLIC MEETING (17-Dec-2010) CLIC TWO-BEAM MODULE LAYOUT (short introduction) BE / RF 1.
October 14, 2008 C. Hauviller 1 Review of the mock-up’s C. Hauviller.
CLIC requirements on Warm Magnets (for CLIC Modules mainly) 1 M. Modena, CERN TE-MSC 13 April 2011 CERN-UK Collaboration Kick-off Meeting.
CLIC meeting CLIC module status G. Riddone on behalf of the CLIC Module WG,
CERN total: 30,000-35,000 visitors Saturday 40,000-45,000 on Sunday CLIC: ~5,000 visitors (incl. at least 1 CERN DG) 57 volunteers CLIC at the CERN Open.
CLIC workshop ”Two beam hardware and integration” working group Module layout and main requirement G. Riddone, A. Samoshkin
CLIC activity of R.Raatikainen Feb 20121R.Raatikainen BE-RF-PM Main tasks  Thermo-mechanical modeling of the CLIC/LAB two-beam modules 
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
CLEX TBM T0 Cooling system Design strategy 1 V. Soldatov, A. Vamvakas, BE-RF
CLEX constraints between the 2 linacs CLIC meeting 18 March 2015 Vivien RUDE Contents : (Alignment in the CLEX) Lab constraints CLEX constraints.
Alignment system and impact on CLIC two-beam module design H. Mainaud-Durand, G. Riddone CTC meeting –
Pre-alignment of quadrupoles 1 CLIC stabilization day, STARTSLIDE PRE-ALIGNMENT OF THE MAIN BEAM QUADRUPOLES Hélène MAINAUD DURAND.
1 [24-July-2013] [CMWG] «BE-RF-PM» CLIC TBM Prototypes Status EDMS №[Number] Dmitry Gudkov 1.
1 12-February-2014 BE-RF-PM CLIC MODULE Preparation for the duty cycles Written by: Elena Daskalaki Checked by: Alexander Samochkine Approved by: Germana.
Dmitry Gudkov BE/RF CLIC Module Working Group Test Module Type 1 (LAB). Design and integration. 3D model Ref: ST
«BE-RF-PM» 1 Wire Ø0.08mm CLIC TBM Booth Posters Modules Line (1:10) AS and PETS samples RF components, vacuum equipment Supporting, magnets,
CTC Work Packages ver 2.1 HS for CTC. CTC-001SC wigglers Cooling design, hor. or ver. Racetrack coil Nb3Sn or NbTi cable Prototypes construction Experimental.
Module layout and types Two-beam module review, September 2009 Module layout and types G. Riddone for the CMWG,
Status of the CLIC module R&D G. Riddone on behalf of the CLIC module WG (special contributions from A. Samoshkin, D. Gudkov, A. Solodko, N. Gazis)
Two-beam module layout
TBL experimental program, evolution to RF power testing in TBL ACE 2011, February 2-3Steffen Döbert, BE-RF  Current status of TBL  Experimental program.
Update on the DB Girders FE Analyses
Alignment methods developed for the validation of the thermal and mechanical behavior of the Two Beam Test Modules for the CLIC project Hélène MAINAUD.
Module roadmap to end of 2017
Thermal review of CLIC module
The path to a new CLIC main-linac module
TBL, Status, Plans, Experiments
Have a chance to operate your own beam at CERN
List of changes and improvements for the next generation CLIC module
Installation plan for LAB modules
LCWS 2017 – 26th October C. Rossi
TM0s and TM1 components inventory and procurement schedule
Experimental program for module array
Thermal test (lab modules)
Presentation transcript:

CLIC two-beam modules TEST modules final schemes Dmitry Gudkov BE/RF CLIC Module Working Group

Two-beam modules summary Test modules – Test modules in the lab (as much as possible close to CLIC modules)  design frozen in Feb 2010 – Test Modules in CLEX (compatible to CLEX facility) CLIC module – The design will evolve accordingly to the CLIC study

Mock-ups for TEST modules (LAB) RF-system components: -AS -PETS -On-Off -RF-distribution (Hybrid+CMF) -Loads -Splitters Magnets: -MBQ T4, MBQ T1, DBQ Beam instrumentation: -MB BPM, DB BPM

DB MB L L L L LL L - Alignment CLIC TEST Module Type 0, LAB - Diagnostic unit IC - Interconnection AS IC 3db hybrid CMF LOAD 3db hybrid CMF LOAD 3db hybrid CMF LOAD 3db hybrid CMF LOAD 3db splitter LOAD 3db splitter LOAD 3db splitter LOAD 3db splitter PETS ON-OFF UNIT DB Q BPM PETS ON-OFF UNIT IC PETS ON-OFF UNIT BPM PETS ON-OFF UNIT DB Q RF-distribution

DB MB L L L L LL L - Alignment CLIC TEST Module Type 1, LAB - Diagnostic unit 3db hybrid CMF LOAD 3db hybrid CMF LOAD IC PETS ON-OFF UNIT BPM PETS ON-OFF UNIT DB Q DB Q BPM PETS ON-OFF UNIT 3db hybrid CMF LOAD 3db splitter LOAD 3db splitter LOAD 3db splitter AS IC MB Quad BPM RF-distribution IC - Interconnection

DB MB L L L L LL L - Alignment IC BPM DB Q DB Q BPM IC MB Quad BPM COOLING IN COOLING CHANNEL COOLING OUT COOLING OUT COOLING IN CLIC TEST Module Type 4, LAB

Thank you!