NESCC Meeting November 7, 2013 Advanced Nuclear Technology (ANT) Construction Speed and Quality Task Group.

Slides:



Advertisements
Similar presentations
IEEE ExpertNow RFID Sequence Kapil R. Dandekar, Ph.D. 15/Nov/2008 New Brunswick, IEEE Meeting Series.
Advertisements

Perspective on the ASTM Roadmap for Supporting Civil Nuclear Energy Plants Workshop on Emerging Trends in Nuclear Energy – The Standards Component June.
Starting Planning for the 2010 Policy Key Issues Notes for the TAC Executive Committee April 8, 2009 Phil Hattis, AIAA VP for Public Policy.
Codes and Standards Future Work
American Institute of Steel Construction Charlie Carter Vice President and Chief Structural Engineer.
“RULES FOR INSERVICE INSPECTION OF NUCLEAR PLANT COMPONENTS”
MODULE B - PROCESS B1.ASME Organizational Structure B2.Standards Development: Staff and Volunteer Roles and Responsibilities B3.Conformity Assessment:
Codes & Standards.
Engineering Perspectives on First Year of New Reactor Construction Mohamed Shams, Ph.D., PE Structural Engineering BC US NRC, Office of New Reactors July.
AISC N690: Appendix N9 Design of Steel-Plate Composite (SC) Walls By,
ASME Liaison Report to CRE May 18, 2011 Urey R. Miller, P.E.
PCI 6 th Edition Handbook History. Presentation Outline PCI history Notable modifications to the 6 th Edition General chapter by chapter overview.
ASME SMR ROADMAP (STP-NU-072)
NRC* Perspective on HDPE Road Maps Eric Focht, Materials Engineer U. S. Nuclear Regulatory Commission Office of Nuclear Regulatory Research Division of.
Dr. Jose Pires Structural, Geotechnical and Seismic Engineering Branch
Nuclear Energy University Programs Small Modular Reactors August 10, 2011 Dan Ingersoll presented by Bob Hill.
Nuclear Standards The International Passport Nuclear Africa Conference South Africa March 18-20, 2015 Bryan Erler ASME Board of Governors Vice President.
ASME Nuclear Conformity Assessment
PODS: a review and the patterns for implementation Janet Sinclair PODS Association.
Ken Barry Technical Executive Advanced Nuclear Technology Project Mapping to SDO and Codes.
Chapter 2: Planning. Planning steps Establishing project team Defining system requirements Performing feasibility analysis Obtaining support for the HRMS.
November 7, Topics NESCC 2013 Survey – review of results Buried pipe coatings Seals for doors and penetrations to prevent flooding NESCC discussion.
ASTM International Nuclear Initiatives Roadmap Steve Byrne and Joe Koury March 2013.
Concrete Codes and Standards for Nuclear Power Plants (CTG) Chiara Ferraris, NIST Chairperson.
1 NRC Plans for NESCC Concrete Specifications, Codes & Standards (SCS) Endorsement NESCC Meeting March 28, 2013 Richard Jervey USNRC Office of Regulatory.
"Welder Certification" The purpose of this presentation is to introduce you to the various aspects of welder certification. This is not intended to cover.
Status Report: Welding Task Group Report to NESCC – 28 March 2013 Tom Siewert – NIST
1 NRC Follow-up Actions on NESCC Task Group Reports (Concrete Repair, Cabling and Welding) NESCC Meeting November 7, 2013 Richard Jervey USNRC Office of.
Tim Haeberle API SC Winter Meeting
November 7, Status * Task group initiated in November * Steering Committee requested a summary report in July * Summary report deemed.
JK August, ANS/Chair ANSI Washington DC March 28, /28/2013 NESCC Standards Meeting ANSI Washington, DC1.
Westinghouse Non-Proprietary Class 3© 2013 Westinghouse Electric Company LLC. All Rights Reserved. 1 October 2013 Westinghouse Overview and AP1000 ® Plant.
NESCC Meeting March 28, Topics Accomplishments Since Last Meeting Program Management for NESCC Support to the NESCC Sponsor Committee Review and.
NE 110 – Introduction to NDT & QA/QC Definitions Prepared by: Chattanooga State Community College.
RICHARD BROWN UPF Procurement Director October 31, 2013.
Certificate in Pipeline Construction, Welding & Inspection LECA LEXTON ENERGY CORPORATE ACADEMY Copyright 2013 Lexton Energy Incorporated PCWI delivered.
Chapter 12 Concrete Construction Part 3 1CE 417, King Saud University.
From Research Prototype to Production
November 7, Status * Concrete Repair Report was published in August * Included 40 recommendations for: * Revisions to standards. * New standards.
11 Technical Session 3 – Rulemaking Process: NRC and Industry Perspectives on Improving Quality, Timeliness, and Consistency in 10 CFR 50.55a Raymond (Ray)
NASA Technical Standards Working Group Presentation to White Sands Test Facility Dr. George Alcorn Goddard Space Flight Center GSFC.
Opting for “Long Term Operations” Technical, economic and regulatory considerations MARC Conference June 8, 2010 Sean Bushart, EPRI Sr. Program Manager.
ICARUS Cold Vessels Thermal insulation Project progress report.
Summary of NRC HDPE Piping Confirmatory Research Activities NESCC HDPE Piping Road Map Workshop April 18, 2013 Washington, D.C. Eric Focht, Materials Engineer.
AKTAU, SEPTEMBER 2012 WESTERN KAZAKHSTAN INVESTMENT FORUM PRESSURE VESSELS.
Ken Barry Acting Program Manager, Advanced Nuclear Technology (ANT) Program November 29, 2012 Task Group Name: Construction Quality and Speed Improvement.
1 Meeting on April 18, 2013 Washington DC Workshop on a Joint HDPE Roadmap for Current and Future Service.
A THENA  Institute The US LCI Database Project: Creating Publicly Available LCI Data Modules Presented to: American Center for Life Cycle Assessment By:
1 Emerging Issues: Materials and Mechanical Michele G. Evans, Session Chair 2009 RIC.
Status Report: Welding Task Group Report to NESCC – 23 July 2013 Tom Siewert – NIST
Chapter 3 Strategic Information Systems Planning.
WHO-Technical Briefing Seminar | October-November 2012 Dr Cécile Macé 1 |1 | Good Governance for Medicines Programme Dr Cécile Macé EMP/MPC.
Power Plant Construction and QA/QC Chapter 2– Guide to ASME Code VIII, Division 1, Pressure Vessels Engineering Technology Division.
Nuclear Standards for Polymeric Piping Aaron Forster, NIST Engineering Laboratory NIST, MS Bureau Drive Gaithersburg, MD (301)
Flux Cored Arc Welding (FCAW)
Introduction to Codes, Standards, and Regulations.
New R&D Directions Carl Haber ATLAS Tracker Upgrade Mechanical Meeting 11-Sept-2013.
ISTOG – NRC Update Winter Meeting 2010 – Clearwater, FL Tony McMurtray Chief, Component Performance & Testing Branch Office of Nuclear Reactor Regulation.
API Spec 6A: ASME Section V And Section IX Reference Editions Tim Haeberle API SC Summer Meeting.
© 2016 Electric Power Research Institute, Inc. All rights reserved. Speaker’s Name Speaker’s Job Title Event Name Date Main Title Subtitle.
NCSX Strykowsky 1Independent Project Review (IPR) June 8-9, 2004 NCSX Project Review June 8-9, 2004 Cost, Schedule, and Project Controls Ron Strykowsky.
Nuclear Codes and Standards Needs in Argentina International Working Groups April 2016 Buenos Aires, Argentina Ryan Crane Oliver Martinez.
CSE784 – Software Studio Jim Fawcett Fall 2002.
ACI Committee 544F Fiber Reinforced Concrete Durability
Third Party Activities for FH1 Project
LCLS Linac Technical Design Review Charge
Quality Control Personnel Training
November 8, 2017 Presented by: Ron Schrotke
Title of Project Lead Organization, Partner Organizations
Potential Nuclear Components
Presentation transcript:

NESCC Meeting November 7, 2013 Advanced Nuclear Technology (ANT) Construction Speed and Quality Task Group

2 © 2012 Electric Power Research Institute, Inc. All rights reserved. IC Ranking Process

3 © 2012 Electric Power Research Institute, Inc. All rights reserved ANT Ranking

4 © 2012 Electric Power Research Institute, Inc. All rights reserved. Ranking of NDE projects – red: concrete projects

5 © 2012 Electric Power Research Institute, Inc. All rights reserved. Specific Technology Implementation Timeline Specific Technology Incorporated into new designs NRC Endorsement Specific Technology Used in New Builds Codes Changed Primary Research Conducted Other Research Input Timeline Vendors Industry Others

6 © 2012 Electric Power Research Institute, Inc. All rights reserved. Results of the October 23 rd Meeting in Charlotte 11 attendees Top Topics: –ACI 318 and 349 Conflicts (tolerances and interpretation) –High Speed Welding (ASME III & IX, AWS non-pressure vessel, NQA-1) –Advances in Modular Construction (AISC N690) –Construction Data (ISO-15926, NQA-1) –Self Consolidating Concrete (Div 2) –Blast and Impact Resistant Concrete (ACI 370, 349, 359, 544) –NQA-1 (Part II, Subpart 2.5 Sections 603 and Section 502) –Moisture Tolerant Coatings –Automated Real-time Rebar and SC Module QC Inspection and Documentation

7 © 2012 Electric Power Research Institute, Inc. All rights reserved. Results of the October 23 rd Meeting in Charlotte Additional Topics: –Deep Containment Placement issues –Low activation concrete –Passive heat removal using structural components –Nanoparticle Coating –Custom Fabrication of Structural Steel –Fiber Reinforced Concrete and “White Tanking” admixture

8 © 2012 Electric Power Research Institute, Inc. All rights reserved. Next Steps Develop full project proposals for the top technical topics Develop Timeline considerations for all proposals Vet the proposals with the CS&Q Team Propose the projects to the ANT Integration Committee for 2015 funding consideration. NESCC White Paper?

9 © 2012 Electric Power Research Institute, Inc. All rights reserved. Together…Shaping the Future of Electricity