Project Tracking Update July 12, 2011 MOPC. 2 STEP List (Excel Spreadsheet) –Engineers enter technical data and analysis on upgrades –Used as a repository.

Slides:



Advertisements
Similar presentations
Operating Reserves --- Again A Discussion Primer
Advertisements

Western Electricity Coordinating Council Market Interface Committee Report to the WECC Board of Directors December 6-7, 2007 Robert D. Schwermann MIC Chair.
1 RTWG Tariff update to the BOD, MOPC, SPC, and RSC January 4, 2005.
Update on EPA Activities MOPC July 15-16, Current Known Impacts –Retirements –De-ratings –Outage Impact Studies Proposed Clean Power Plan 2 Topics.
FERC Information Assessment Team (FIAT) March 2, 2005 Commission Meeting Final Recommendations.
Transmission Congestion on the Delmarva Peninsula December 17, 2003 PA
SPP’s 2013 Energy Consumption and Capacity 2 12% annual capacity margin requirement CapacityConsumption Total Capacity 66 GW Total Peak Demand 49 GW.
1 The Midwest ISO At the Crossroads of America International Meeting of Very Large Power Grid Operators October 24 & 25, 2005 Beijing, China.
Economic Criteria for Transmission Planning in the ERCOT Region Public Utility Law Seminar DeAnn Walker August 3, 2012.
Congestion Management in a Market Environment 2 nd CIGRE / IEEE PES International Symposium San Antonio, Texas October 5, 2005 Kenneth W. Laughlin.
Modeling Choices & Approaches Key Model Outputs: Carbon emissions Other emissions Electricity prices Total electricity system costs Fuel use and diversity.
WECC PCC Meeting Salt Lake City, UT March 26, 2014.
1 JULY 2010 PRELIMINARY TECHNICAL CONFERENCE REPORT – WORK IN PROGRESS Session 4 Discussion of Alternatives and Implementation Activities for Real- Time.
1 The Effects of Integrating Wind Power on Transmission System Planning, Reliability, and Operations Phase 1 Preliminary Overall Reliability Assessment.
George Bartlett Director, Transmission Operations Economic Transmission Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
Variable Generation Subcommittee Paul Arnold and Michelle Mizumori Northwest Wind Integration Forum Technical Work Group October 29, 2009.
10/03/ Report on Existing and Potential Electric System Constraints and Needs Within the ERCOT Region October 3, 2002.
Network Customer Meeting Access Metric Update November 16, 2006.
July 30, 2015 TAC Meeting Update to COPS Michelle Trenary August 12, 2015.
Powering Alberta AESO Annual General Meeting May 14, 2009 Reliable Power Reliable Markets Reliable People.
Variable Generation Subcommittee Michelle Mizumori WECC January 6, 2010.
Update - RTOs and Capacity January 28, Purpose of Presentation Update the Commission on issues related to – (1) Ameren Missouri – potential Local.
Long-Term Electricity Report 1 Susan Gray September 27, 2010.
Discussion of Market Participant Choice for Transmission Connections Stakeholder Session October 14, 2011.
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
Stationary and Area Source Committee Update OTC Committee Meeting September 13, 2012 Washington, D.C. Hall of the States 1.
State EE/RE Policy Best Practices & Next-Generation Innovations: September Meeting Feedback on overall work plan and phasing of policies September 25,
California Energy Commission IEPR Lead Commissioner Workshop University of California, Irvine August 17,
©2004 PJMwww.pjm.com 1 PJM's Perspective on Reliability – Summer 2004 and Beyond Karl Pfirrmann President -- PJM Western Region FERC Summer Reliability.
Current Export Initiatives Jerry Mossing Exports Workshop February, 16,2006, Metropolitan Center, Calgary.
CPPP Stakeholder Meeting Springfield, Missouri November 18, 2010 Associated Electric Cooperative Inc.
R E T I Coordinating Committee California’s Renewable Energy Transmission Initiative: Status Update California Public Utilities Commission California Energy.
Wholesale Market Subcommittee Texas Interconnection Long-Term Study Update Warren P. Lasher April 8, 2011.
Transmission Outage Process April Purpose In compliance with the Protocols and the Electric Reliability Council of Texas (ERCOT) Operating Guides,
Reliability Planning Priorities for 2015 Byron Woertz, Senior Project Manager W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
2006 SPP RTO Expansion Plan Carl A. Monroe July 30, 2006.
Update on Methane Regulations Affecting Landfills Pat Sullivan Senior Vice President SCS Engineers Nov. 10, 2015.
Sep 22, 2003Market Operations Standing Committee of the IMO1 Change Management: Market Rules Update John MacKenzie, IMO.
FINAL CLEAN POWER PLAN Before the Virginia Energy Efficiency Council Virginia Department of Environmental Quality November 12, 2015.
Request for Service (RFS) Process and Metrics Update June 24, 2008.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting September 16, 2008 Austin, TX.
Environmental Benefits of Renewable Portfolio Standards in an Age of Coal Plant Retirements September 10 th, 2015 Energy Policy Research Conference Denver,
Analysis of Demand Response Modeling in GridView Andy Satchwell and Sarah Smith Modeling Work Group December 21, 2015 The work described in this presentation.
1. Non-Dispatchable Resources and EIS Market Carrie Simpson May 30,
Grid Operations Report To ERCOT Board Of Directors December 16, 2003 Sam Jones, COO.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting June 20 th, 2008 Austin, TX.
1 Rate Impact Task Force’s Updated Results for it’s Report to the SPP Regional State Committee January 24, 2011.
Role of Account Management at ERCOT 2006 TAC Subcommittee Review ERCOT Board February 21, 2006.
Market Working Group Update Presentation to CAWG March 29, 2011 Jim Sanderson, KCC.
Update on the North Carolina Transmission Planning Collaborative January 30, 2007 For the North Carolina Utilities Commission and the North Carolina Public.
1 Nodal Stabilization Market Call December 27, 2010.
Oncor Transmission Service Provider Kenneth A. Donohoo Director – System Planning, Distribution and Transmission Oncor Electric Delivery Co LLC
Operational Planning Jason Smith. Operational Planning Goals –What Ops Planning is –What Ops Planning is not –What rules we operate under –Limitations.
ERCOT Transmission Planning Process Overview and Recommendations November 6, 2002.
Regional System Operator Issues Analysis Ron Lehr Western Clean Energy Advocates January 7, 2016.
Long Term Transmission Integration Planning at the California ISO Intermittency Analysis Project (IAP) Energy Commission Staff Workshop February 13, 2007.
A Generation and Transmission Solution for the Clean Energy RFP
Transmission Advisory Group NCTPC Process Update Rich Wodyka September 7, 2006.
DRAFT – FOR DISCUSSION PURPOSES ONLY © 2013 New York Independent System Operator, Inc. All Rights Reserved. EIPC Roll-Up Powerflow Model Zach Smith Director,
Clean Power Plan Kyra Moore Director, Air Pollution Control Program Prepared for: Midwest Energy Policy Conference October 6, 2015.
4/16/2010 Regional Planning Group Meeting Long-Term Planning Study of the ERCOT Interconnection Warren Lasher Manager, System Assessment.
Alliance Update Illinois Commerce Commission Electric Policy Committee July 10, 2001.
Regional Implications of the Clean Power Plan Lanny Nickell Midwest Energy Policy Conference October 6 th,
Northern Tier Transmission Group Report to Columbia Grid Planning Committee February 9, 2012 “To ensure efficient, effective, coordinated use & expansion.
Status Update for Reliability/Market Power Mitigation Assessment
TPITF March 6, 2017 Juliano Freitas
Reliability Assessment Committee Proposal TSS Meeting
Evolving Economic Dispatch in SPP
ITP20 Flowgate Selection Introduction
Acadiana Load Pocket Project
Presentation transcript:

Project Tracking Update July 12, 2011 MOPC

2 STEP List (Excel Spreadsheet) –Engineers enter technical data and analysis on upgrades –Used as a repository for all information on Transmission Upgrades –Cumbersome and hard to update –Historical record  STEP list contains all upgrade information, even when project is completed or withdrawn Project Tracking Tools (Historical)

Project Tracking (New) Project Tracking Database – Phase 1 –Upgrades tracked from NTC creation to rate recovery through the life of the Upgrade – Easier data retrieval  Quicker information response  Eliminates multiple data requests –No impacts to members in Phase 1 –Future phases of project  Member database access  Flexible communications for Transmission Owners and SPP 3

Project Tracking – Member Impact No impact to members –Members will see no changes in their construction project interaction with SPP –SPP employees will gather project information and input into database same as today –Members have data that is more secure 4

ITP Status Update July 12, 2011 MOPC

2011 ITP10 Stakeholder Activities TWG completed the Constraint Assessment ESWG approved the resource plans for the two futures –Future 1 – Business as Usual –Future 2 – EPA Rules with Additional Wind: Adds additional wind generation and approximates the impact of EPA rulemaking by imposing retirements on small coal plants and a tax on carbon emissions ESWG authorized calculation and utilization of metrics for ITP10 6

2011 ITP10 Stakeholder Activities Metric Calculation – 9 metrics from ITP20 – Adjusted Production Cost – Value of Improved Available Transfer Capabilities – Reduced Losses – Impact on Losses Capacity – Levelization of LMP’s – Improved Competition in SPP Markets – Limited Export/Import Improvements – Reduction of Emission Rates and Values – Ability to Serve new Load 7

2011 ITP10 Stakeholder Activities Metric Calculation –Two additional metrics calculated  Backstop to Catastrophic Events  Value of replacing previously approved projects 8

2011 ITP10 Completed Staff Activities Model Development completed –Topology updates, baseline fuel costs, etc. Quality Control –Stakeholder Review –dispatches –flowgate loadings –LMP prices –generator outages 9

2011 ITP10 Upcoming Activities Identifying ITP10 potential violations –Reliability analysis of AC models with economic dispatches –Economic analysis of security-constrained economic dispatch models  List of Top 10 congested constraints will be compiled –ITP20 projects reviewed as potential ITP10 solutions –Staff developing strawman for incorporating seams projects 10

2011 ITPNT Activities Identification of potential violations Developed recommended plan for 100 kV and above upgrades Recommended plan will be presented at upcoming SPP Summit Developing recommended plan for below 100 kV 11

July Planning Summit – Dallas, TX on July 21 st – Discuss ITP10 potential violations (reliability, economic, and stability) – Start selecting ITP10 projects – Discuss ITPNT upgrades – Sub-Regional & Local Area Breakout Discussions September Planning Summit ITP Next Steps 12

October MOPC – Present draft solutions – 2011 ITP10 & ITPNT Draft Report December Workshop – Tentative January MOPC – Present final transmission plan – 2011 ITP10 & ITPNT Final Report – 2011 STEP Report ITP Next Steps 13

Generator Interconnection and Aggregate Study Process Internal review update 14

Background – General dissatisfaction expressed in customer satisfaction survey Goals for Staff review – Understand concerns driving lower survey results  Staff performance?  Dissatisfaction with results?  Process? – Identify opportunities for improvement Background and Purpose 15

Common themes of feedback to-date – Length of time it takes to get through process and have certainty in requirements to approve requested service still too long – Impacts caused by shear volume of wind-related or other “speculative” requests on “ready to-go” projects – Lack of process to finalize third party impacts Staff completing internal process review – Business process review – Tools – Resource requirements Update 16

Initiatives underway – SPP TSR Coordination with Third Party Systems – Third Party TSR Coordination with SPP – DPT Prescreen – Aggregate Study Withdrawal Costs Staff complete internal review Work with appropriate committees to assess potential process improvement proposals ATP Business Practice Next Steps 17

18 Katherine Prewitt Director, Planning Lanny Nickell Vice President, Engineering