Designer/Contractor JV- Apron Services Projects- A Winning Case

Slides:



Advertisements
Similar presentations
TITAN Group …….Managing Site Build up for the telecom sector TICS Telecom Projects Consultancy Pvt. Ltd.
Advertisements

TQM Study in Royal Commission of Jubail CEM 515. Purpose of the royal commission Is to develop, construct and maintain the infrastructure of Jubail-2:
Peco Facet Sewage Water Treatment Plant
Peco Facet Sewage Water Treatment Plant
DISTRICT FIVE CONSTRUCTION CONTRACT ADMINISTRATION UPDATE TRAINING Submission of Working Schedule Specification SP A.
Fawzy Al-Alami G Term Paper.  Introduction.  Effect of Teamwork in Design-Build. Construction Contract.  Factors Can Enhance Design-Build.
TurnKey Project Management Services Capabilities Briefing.
Managing a Successful Mechanical System project Following design – what next?
SUBMITTALS PROCESSING Fall 2008 ARCH 330
4/28/20151 PRESENTED BY NAKABAGO JOHN CONTRACT MANAGEMENT AND ADMINISTRATION IPPU PRESENTATION JOHN NAKABAGO.
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
1 Belene NPP Project Configuration Management Presented by Alexey Matveev Varna, May
Global Sponsor Effective Management of Subcontracting in Engineering and Construction Industry September 29 th, :45 AM – 12:30 PM.
Getting The Theory Down to Earth Project Plan Dubai September 2007.
Project Management Process. Project Complexity means that: a team of people are needed to supply expertise the work needs to be broken into manageable.
1 BROOKHAVEN SCIENCE ASSOCIATES Central Chilled Water Facility – Phase II Alan Raphael MPO Project Manager CFAC Committee Review November 9, 2009 Sub-basement/Pipe.
King Fahd University of Petroleum and Minerals Department of Construction Engineering and Management CEM Instructor: Dr. Soliman Al-Mohawis Important.
Chapter 18 Working Drawings.
Global Sponsor Effective Management of Subcontracting in Engineering and Construction Industry September 29 th, :45 AM – 12:30 PM.
1 ®  Overview Benefits of a Good Construction Schedule Baseline Schedule Development Schedule Updating and Maintenance Managing Project Changes USACE.
1 Microturbine CHP Application in the Hotel Business DOE Microturbine Application Workshop Embassy Suites Brea January 20, 2004.
Developments within Supermarket Refrigeration and the Cold Chain ASHRAE Arkansas Chapter Meeting April 1 st, 2015 ASHRAE Arkansas Chapter Meeting April.
BAE SYSTEMS Overview of Systems Engineering at BAE SYSTEMS & ALENIA MARCONI SYSTEMS 8/10/2015/MS By Leigh Watton Friday 27th July 2001.
Construction Industry. Salisbury Cathedral Taj Mahal.
UK’s CDM Regulations 2007 and its Applications in Singapore
Process Engineer’s Role in Project Management Dr Abdullah Malik.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
1 BROOKHAVEN SCIENCE ASSOCIATES As-Built Drawings and Commissioning Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional.
1.0 INTRODUCTION Seán Moran. SIMPLE? Commissioning is a complex issue requiring: Planning Leadership Teamwork Training Communications.
Cindy L. Menches, Ph.D., P.E., The University of Texas at Austin Electri’ International Annual Meeting, July 2007 Characteristics+ Planning Achieving Performance.
Construction Project Management
FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING FALL SEMESTER ASSOC.PROF.DR. İBRAHİM YİTMEN CIVL 493 CONSTRUCTION MANAGEMENT.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Company Profile ► Our Expertise Here at SIEMSTECH we have a passion for designing and implementing integrated, network-centric technology solutions across.
1 BROOKHAVEN SCIENCE ASSOCIATES Construction Management Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
How to do business guide. Fixed, Data and Hosted Solutions by Mandy Fazelynia Latest update – 11/11/2013 Operations Director.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
Practical Problems Experienced with Industrial DSM Projects Marius Kleingeld 15 August 2012.
Project Development Decision Tree PermittingIn-house Reqmts.Energy SalesFuel Consumption Plant Configuration Risk AssessmentCapital Costs Schedule Constraints.
Introduction- Project Management By Ctrl+C & Ctrl+V 1.
Joint Venture in construction company in West Bank.
The following advertisement is created for the sole purpose of understanding the Commissioning process. The following advertisement is created for the.
Project management Dr. Khaled Bubshait 1 Dr. Khaled A. Bubshait Project Management.
King Fahd University of Petroleum & Minerals
Westinghouse/Southern/SCANA – New Build Configuration Management
TQM Study For Telecom Towers King Fahd University of Petroleum & Minerals Department of Construction Engineering & Management CEM 515: Project Quality.
Pre-Construction Activities to include: - Provide effective overlap period and oversight of effort - Estimates during - CPM Schedule - Identify lead-time.
Development through partnership Infrastructure Delivery Management Toolkit: 2010 Edition Delivery Process 2: Project Management 1.
9186D Project Completion Report. Project Summary Client: FAST / BHP Contract No.: 1646-P PROJECT DELIVERABLESTARGETACTUAL SafetyNil Incidents ScopeAs.
Chilled Water Plant Overview From Project Concept To Operation July 26, 2007.
ESS KAY CONSULTANTS MEP CONSULTANTS. WHAT IS MEP ??? MECHANICAL ELECTRICAL MEP PLUMBING.
What is Contracts? When two or more persons have common intention communicated to each other to create same topic & done the agreement that is called.
DRAKENSBERG PUMPED STORAGE SCHEME 29 June Unit 1-3 Generator Stator refurbishment (Tender: PS(DPS)2015/DJ/01) Clarification Meeting 29 June 2015.
EC&O – BUSINESS Business Benefit Due to OMNI. OMNI – Complete EC&O Solution What is EC&O stands for… Real Estate Developer Developer plus contractor Core.
0 Design Change Construction & Completion Management (Outline and related procedures) Hanul NPP Engineering Center.
What is a WBS? A Work Breakdown Structure is not a list of tasks, a schedule or an organization chart. Rather it provides the basis on which a task.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Schedule Steve Sawch Asst. Director, Construction Management CF Advisory Committee Review of the.
Richland Creek Water Supply Program Update Paulding County, Georgia Board of Commissioners Work Session March 08, 2016.
Construction Tender Process Tender steps between Client, Contractor and Subcontractor Dr A Kimmance.
SNS COLLEGE OF ENGINEERING Coimbatore-107 Subject: Thermal Engineering
SNS COLLEGE OF ENGINEERING Coimbatore-107 Subject: Thermal Engineering
Project Planning and Implementation
IT-4189 Supply and installation of a cryogenic distribution system
Longreach Water Mains Replacement
SNC/SCANA – New Build Configuration Management
Controlling Project Cost and Schedule
East Hall under construction
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
INTRODUCTION ALAQUA is a US corporation. We manufacture process equipment. Our engineers have over 20 years experience in the engineering of sanitary and.
Presentation transcript:

Designer/Contractor JV- Apron Services Projects- A Winning Case The KAIA project Case Study

Introduction The purpose of this presentation is to demonstrate : How early Engineer( designer/ Contractor coordination and cooperation can overcome the difficulties encountered Highlight unforeseen and foreseen difficulties and challenges encountered in the KAIA project

Introduction AME- DEP JV KAIA back Ground and Scope of Work Project Constraints Project Deliverables Project Procurement Plan Systems Design Conclusion

Designer / Contractor JV AME Background DEP Background AME-DEP JV and history of cooperation DEP Role in KAIA:DEP is doing design – shop dwgs – technical procurement submittals – construction management and cost control AME is an Aviation Systems Specialist company based in UAE and has presence in KSA and has references all over the middle east as my colleague T Sh explained in his presentaiton yest. DEP is a design office based in Lebanon and has offices in KSA and projects in the Gulf and MENA regions

Project Background and Scope of Work Client : GACA Main Contractor : Saudi Bin Ladein Group – SBG Apron Subcontractor – Al Mabani AGC Apron Services Subcontractor – AME/DEP

Project Background and Scope of Work Potable water treatment plants and potable water piping network from Tech. rooms to pits. Blue water treatment plants and blue water piping from Tech. rooms to toilet pits. Vacuum receiver plants and piping network. PCA air handling units and corresponding under-gound ducting and PCA pits Glycol chilled water plant rooms and networks. GPU 400 Hz system and pits

Project Background and Scope of Work Aprons 17-18-19 and PTB Area in scope

Project Deliverables Material Submittals Design and shop drawings Method statements Monthly Progress Reports O & M manuals As Built Drawings Testing and Commissioning Reports Training Warranties

Project Constraints The main constraints challenging AME at this project are the following: The short project duration which is by any standards is very tight for the scope of work at hand . The different layers of upstream parties, mainly the CM and designers , and at a second level Main Contractor and Subcontractors The Various unforeseen changes from the original tender design due to site conditions / project updated requirements / cost and time constraints The delays in design / approvals / material

Project Constraints The difficulty of direct communication between many of the parties due to contractual constraints The peculiarity of some of the specified items such as: Vacuum drainage system Glycol sub cooling method SS PCA Duct for mobile ACU The interface with other contract packages which could increase the number of unforeseen problems.

Why a Designer on Board is a Winning Case The Complexity of the modern airport systems makes it necessary to do every bit of study and calculations and drawings to achieve a coordinated installation To get seamless relations with the CM which is himself is an engineer The various changes in design during construction due to site conditions requires a designer on board during the construction to find the proper solutions When a Designer is in direct contact with the specialists / suppliers the design will be more customized and more understanding to the equipment strengths and weaknesses.

Examples of Unforeseen Difficulties Changes in the Client Requirements Suppliers uncontrolled supply delays Site level changes and various obstructions Differences in Contract requirements interpretations

Project Procurement Plan AME has prepared a procurement plan relating to time and cash flow to suit the project schedule and technical requirements. The basic elements of this plan are : Establishing a basket of reputable suppliers Providing proper material submittals for approval Identifying long lead items and placing orders on time Delivering the material on site as per project schedule

H-Project Manpower Histogram

I-Communication Plan --

Why Centralized Apron Services Here we see a typical service arrangement using traditional support systems necessary to support the aircraft. Note how the red encircled equipment: GPU PCA Potable Water Lavatory Service Fueling Typical Service– B-777 t

The Solution….Apron Services Note: Fuel Trucks shown Removed (Hydrant Fueling) And now we see a Ramp of the Future, an a reality of today……being designed, supplied, installed and commissioned by Avicorp Middle East. 90 KVA PCAir PCAir 90 KVA H2O Blue H20 Lavatory

MARS GATES Multi Aircraft Ramp System The KAIA MARS configurations. Multi – Aircraft – Ramp – System. All service pits are coordinated to service all aircraft

Systems Design Vacuum System Unique Vacuum Lavatory and Blue Water service clears the ramp of additional equipment movement. Connections for the aircraft for Lavatory and blue water service come from a single service pit. Vacuum System

Systems Design 140 Lav pits Vacuum System

Systems Design Toilet Pit

Systems Design Vacuum Lines Profile

Glycol Chilled Water System Systems Design Glycol Chilled Water System 96 PCA pits – 50 PCA units – 46 nodes- 6 chillers each 1050 KW cooling

Glycol System Configuration Systems Design Glycol System Configuration

PCA Unit Installation Detail Systems Design PCA Unit Installation Detail

Common is a delivery method…. Pits with or without potable water, Reel PW Reel Pit Access PCA Hoses Valves Common is a delivery method…. Pits with or without potable water, Reel Pit Access Insulated Hoses Internal valves allowing to an optimized sup0ply network. PCAir and Potable Water Pits

Central Glycol Plants Thermal Design Civil works design and installation Distribution Network Responsible for Performance Chiller Supply Avicorp recommends a single source for design and installation supervision of central glycol chillers and distribution network. Here we see the KAIA installation, where Avicorp is providing design supervision, installation and supply. Three plus KM of pipe is being supplied and installed by Avicorp.

Systems Design Potable Water System The potable water hoses are in the same pit as the PCA Potable Water System

Systems Design Potable Water System The potable water hoses are in the same pit as the PCA Potable Water System

Systems Design Blue Water System The potable water hoses are in the same pit as the PCA Blue Water System

Systems Design Valve Chamber Detail The potable water hoses are in the same pit as the PCA Valve Chamber Detail

Systems Design Service Pits (400 Hz) Or the most popular hatch pit designs. Note the easy access the supply cables…and the clear ramp with the covers closed. Simplicity of design, lack of an intrusive pop-up mechanism prevent jamming and damage from GSE movement. Service Pits (400 Hz)

Systems Design The GPU Approach PBB Mounted Reels or……Pits Power delivery to the aircraft Bridge mounted reels or Pop-UpPits. The GPU Approach PBB Mounted Reels or……Pits

Conclusion An early designer intervention and close cooperation with the specialist / contractor is a key factor in the project success

Thank You