21-Jan-2009CSC - ESSC Jan'091 Report on CSC for ESSC Prepared for CSC by Fred Borcherding FNAL
21-Jan-2009CSC - ESSC Jan'092 CSC Electronics Status Conducted a Work Shop at Rice U in Houston January 8 th through 11 th –Description: –What problems were encountered during running? Of those, what have been fixed What the plans to fix the remaining problems What resources, (people, material, time) are needed to resolve the problems –What improvements should we make (as distinct from fixing problems) What are the plans? What resources are needed to make the improvement? –Maintenance Estimate For each module, how many do we have? How many spares do we have? Where are the spares? What level of engineering effort is needed to maintain the element? –Indico Link >
21-Jan-2009CSC - ESSC Jan'093 From CSC Q4’08 Report Short Term detailed Milestones and deliverables. Resolve issues with the operation and control of the Maraton power supplies Identify and fix outstanding Canbus issues Finalize optimal power-on and power-off sequences. Replace faulty resistors in HV system Investigate losses of communication between HV system and PVSS Reduce rate of CRC errors in DAQ system Develop a loopback test between the TMB and ALCT to allow the testing of the skew-clear cables between the chambers and peripheral crates. Further analyze the loss of programming of EPROMs Identify and correct problems with alignment system picomotor control
21-Jan-2009CSC - ESSC Jan'094 LV Resolve issues with the operation and control of the Maraton power supplies –OPFC Failure of ON/OFF switch –Quick disconnect in input power circuit fails –With CMS working with Wiener on a fix Failure upon power on – Soft Start Issues –Turning on too soon after power off greatly increases possibility of failure –Administrative controls have been put into place –Hardware change begun Lack of remote monitoring and control –With CMS working on modification to add remote Identify and fix outstanding CANBus issues –CANBus for Maraton system Expect new server from Wiener Work to analyze CANBus lines to find and fix any deficiencies Start now, intensify when LV back on, work until resolved –CANBus for PCMB system > remote ON/OFF at pcrates > uses ELMB’s Work to analyze CANBus lines to find and fix any deficiencies Work with ELMB experts to resolve further issues Start now and work until resolved
21-Jan-2009CSC - ESSC Jan'095 LV cont. Finalize optimal power-on and power-off sequences. –Observe several issues that have been reduced by a more complex power-on sequence –To proceed further we need to combine slow control of CANBus devices and VME devices –Work will start with availability of cooling and CMS LV in cavern –Work will take about 1 month –Can operate with present power-on procedure while working on enhancements
21-Jan-2009CSC - ESSC Jan'096 HV Replace faulty resistors in HV system –Work started at ISR –Work will take ~2 technicians ~2 months –Working serially > most of CSC can have HV ON during work Investigate losses of communication between HV system and PVSS –HV computers located in S1A10 …
21-Jan-2009CSC - ESSC Jan'097 FE Reduce rate of CRC errors in DAQ system –Rare but disruptive of Global DAQ Develop a loopback test between the TMB and ALCT to allow the testing of the skew-clear cables between the chambers and peripheral crates. –Present methods are not effective in timing in a small percentage of chamber electronics –Developing a more rigorous testing procedure to bring the lost communication rate down Further analyze the loss of programming of EPROMs in on-chamber electronics boards –Believed to be partially caused by power-on sequence > see previous slide –Have isolated problem boards for investigation on the bench –Have instituted work around to automatically identify problem situations and rapidly respond with operator intervention
21-Jan-2009CSC - ESSC Jan'098 CSC Electronics Inventory Following slides list status of electronics inventory for the CSC –For the record …
21-Jan-2009CSC - ESSC Jan'099 On-Chamber Boards CSC On-chamber Electronics Boards installed /total /spares CFE xxxxxCFEB one type, 5(4) per chamber 2268 /2532 /137 ALC xxxxxALCT288 ME1_1,ME1_3144 /?? /~10 ALC xxxxxALCT384 ME1_2, ME234_2216/?? /11 ALC xxxxxALCT672 ME2_1, ME3_1, ME4_1108 /130 /9 ALM xxxxxALCT_MEZ one type, 1 per chamber468 / /20 LVD xxxxxLVDB one type, 1 per chamber468 /?? /?? LVM xxxxxLVMB one type, 1 per chamber468 /?? /?? AFE xxxxxAFEB one type, many per chamber10,152 /11,616 /1054 NOTE: Have ~18 spare chambers, each with full complement of on-chamber boards
21-Jan-2009CSC - ESSC Jan'0910 LV & PCRATE CSC LV Power Supplies > Wiener Maraton System, Air Cooled installed /total /spares PFCB LVPS 72500xxxx OPFC Bin (Crate) 6 /8 /2 PFCM LVPS 71960xxxx OPFC Module 36 /40 /4 MARS LVPS 72920xxxx Maraton Supply 36 /40 /4 MARC LVPS 72960xxxx Maraton Crate 36 /38 /2 Peripheral Crate, pcrate, Components installed /total /spares EMUPC PC xxxx pcrate crate75 /60 /15 CBP PC xxxx pcrate back plane 70 /60 /10 CRB PC xxxx pcrate regulator brd88 /60 /28 PCM PC xxxx PCMB 79 /60 /19 ELM PC xxxx ELMB on PCMB 79 /60 /19 Pcrate boards installed /total /spares VCC PC xxxx Crate Controller 73 /60 /15 CCB PC xxxx Clock and Control84 /60 /24 DMB PC xxxx DAQ Mother Brd. 550 /468 /82 MPC TriggerPC xxxx Muon Port Card70 /60 /10 TMB TriggerPC xxxx Trig Mother Brd. 570 /468 /102 RAT TriggerPC xxxx RPC ALCT Trns. 690 /468 /222
21-Jan-2009CSC - ESSC Jan'0911 CSC HV HV ME1/1> CAEN System installed /total /spares CcHV13052##Crate2 /2 /0 CcHV13052##Board16 /18 /2 HV> UF Custom System installed /total /spares HVUF Custom Systeminstalled /total /spares HDS xxxxxDistribution /157 /31 HDL xxxxxDistribution /179 /36 HDC xxxxxDistrib Crate30 /34 /4 HDP xxxxxDistrib Patch8 /9 /1 HMB xxxxxMaster board40 /50 /10 HMC xxxxxMaster Crate8 /10 /2 HPS xxxxxPrimary HV src8 /10 /2 HCC xxxxxControl comp2 /3 /1 HLV xxxxxLV power supply2 /3 /1 HMP xxxxxMaster Patch2 /5 /3 HLP xxxxxLV patch panel2 /4 /2 HCP xxxxxControl patch2 /4 /2 HPC xxxxxPrimary HVPS ctr8 /8 /2 (spare parts)
21-Jan-2009CSC - ESSC Jan'0912 CSC Track Finder CSC TF installed /total /spares CCCTrigger TF U CAEN VME 1 /3 /1 0Trigger TF wiener crate ( trigger) 1 /2 /1 0Trigger TF TF backplane 1 /3 /2 DDUTrigger TF DDU 1 /2 /1 DDETrigger TF DDU extender 1 /3 /1 TSPTrigger TF SP 12/17 /2 CCBTrigger TF CCB 1 /3 /1 0 Trigger TF muon sorter 1 /5 /3 0TriggerTF CSC-DT transition board12/ 18/ 5 NOTE: Covered under Trigger as well
21-Jan-2009CSC - ESSC Jan'0913 CSC FED FED Crates> Wiener 9U VME installed /total /spares FED FED FED Crate 4 /4 /0 (1 sp PS) FED Boards> OSU Custom Brds installed /total /spares CVC FED CAEN 6U CC 4 /5 /1 –One sent to CAEN for repair, good spare is loan from pool DCC FED Clock and Control 4 /6 /2 –2 more to be shipped to CERN DDU FED Data Board 36 /?? /?? Pcrate Network > GBit installed /total /spares GNS GIG GBit Ethernet switch 8 /10 /2 (1 sp installed)