11 June 2015 Thomas Bergauer (HEPHY Vienna) Belle II SVD beam Test SPS 2015 SPS users meeting.

Slides:



Advertisements
Similar presentations
The Belle II Silicon Vertex Detector Markus Friedl (HEPHY Vienna) for the Belle II SVD Group VCI, 13 February 2013.
Advertisements

A Low Mass On-chip Readout Scheme for Double-sided Silicon Strip Detectors 13th February 2013 C. Irmler, T. Bergauer, A. Frankenberger, M. Friedl, I. Gfall,
DC/DC Converters Markus Friedl (HEPHY Vienna) B2GM, 14 March 2012.
Electrical QA Markus Friedl (HEPHY Vienna) IPMU, 19 March 2012.
Belle-II Meeting Nov Nov Thomas Bergauer (HEPHY Vienna) Status of DSSD Sensors.
The Silicon Vertex Detector of the Belle II Experiment
Milestones and Schedule of SVD Construction Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
Summary of the SVD session 19 March 2009 T. Tsuboyama (KEK)
The Belle II Silicon Vertex Detector Readout Chain Markus Friedl (HEPHY Vienna) TWEPP2012, 19 September 2012.
Using the EUDET pixel telescope for resolution studies on silicon strip sensors with fine pitch Thomas Bergauer for the SiLC R&D collaboration 21. May.
The Origami Chip-on-Sensor Concept for Low-Mass Readout of Double-Sided Silicon Detectors M.Friedl, C.Irmler, M.Pernicka HEPHY Vienna.
Construction and Status of the Origami Module Prototype C. Irmler HEPHY Vienna.
Resolution studies on silicon strip sensors with fine pitch Thomas Bergauer for the SiLC R&D collaboration EUDET Meeting, Oct. 6 th 2008.
Striplet option of Super Belle Silicon Vertex Detector Talk at Joint Super B factory workshop, Honolulu 20 April 2005 T.Tsuboyama.
The AMS-02 detector is based on a large acceptance (~0.5 m²sr) and high sensitivity spectrometer composed by a super-conducting magnet (0.8 T), cooled.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
Construction and Performance of a Double-Sided Silicon Detector Module using the Origami Concept C. Irmler, M. Friedl, M. Pernicka HEPHY Vienna.
21 Sept 2009 Markus Friedl Electronics 1 Electronics 2 Machine Shop HEPHY Scientific Advisory Board Meeting.
DC/DC Converter Update Markus Friedl (HEPHY Vienna) B2GM, 22 July 2012.
M.Friedl, C.Irmler, M.Pernicka HEPHY Vienna
19 November 2009 Christian Irmler (HEPHY Vienna) APV25 and Origami Scheme 4 th Open Meeting of the Belle II Collaboration.
The Silicon Vertex Detector of the Belle II Experiment
Electrical Quality Assurance Markus Friedl HEPHY Site Qualification, 6 August 2015.
1 Conceptual design adopts state-of-the-art silicon sensor techniques (compare ATLAS/CMS/ALICE inner tracker layers, BaBar tracking of B mesons). Design.
The Silicon Vertex Detector of the Belle II Experiment
Tobias Haas DESY 7 November 2006 A Pixel Telescope for Detector R&D for an ILC Introduction: EUDET Introduction: EUDET Pixel Telescope Pixel Telescope.
Silicon microstrip sensor R&D for the ILC Experiments
27 January 2010 Immanuel Gfall (HEPHY Vienna) Belle II SVD Mechanics and Cooling DEPFET Meeting Prag.
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD Mechanics IDM.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
7 th B2GM SVD Summary 19 November 2010 Markus Friedl (HEPHY Vienna)
1 SiLC sensors for the LP-TPC Thomas Bergauer Institute for High Energy Physics (HEPHY) Austrian Academy of Sciences, Vienna for the SiLC Collaboration.
Pixel hybrid status & issues Outline Pixel hybrid overview ALICE1 readout chip Readout options at PHENIX Other issues Plans and activities K. Tanida (RIKEN)
Installation and operation of the LHCb Silicon Tracker detector Daniel Esperante (Universidade de Santiago de Compostela) on behalf of the Silicon Tracker.
Status of SVD Readout Electronics Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
WP9.4 baseline deliverable summary 10 December 2014 Thomas Bergauer (HEPHY Vienna)
Construction and Test of the First Belle II SVD Ladder Implementing the Origami Chip-on-Sensor Design 29 Sept TWEPP 2015, C. Irmler (HEPHY Vienna)
Super-Belle Vertexing Talk at Super B Factory Workshop Jan T. Tsuboyama (KEK) Super B factory Vertex group Please visit
The Belle II Silicon Vertex Detector Florian Buchsteiner (HEPHY Vienna)
Kodali Kameswara Rao TIFR, Mumbai
25 Oct 2011 The Silicon Vertex Detector of the Belle II Experiment IEEE NSS 2011 Thomas Bergauer (HEPHY Vienna) Valencia.
The Mechanical Structure for the SVD Upgrade
SVD Mechanics Markus Friedl (HEPHY Vienna) BPAC, 26 October 2015.
18 March 2009 Thomas Bergauer Prototype batch of DSSD from commercial vendors & Proposal for SVD Layout HEPHY Vienna.
Construction and Status of the Origami Module Prototype C. Irmler, M. Friedl HEPHY Vienna.
Abstract Beam Test of a Large-area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System V. Bhopatkar, M. Hohlmann, M. Phipps, J. Twigger,
The Belle II Silicon Vertex Detector assembly and mechanics
10 September 2010 Immanuel Gfall (HEPHY Vienna) Belle II SVD Upgrade, Mechanics and Cooling OEPG/FAKT Meeting 2010.
Overview SVD 21 Jan C. Irmler (HEPHY Vienna) 7 th Belle II VXD Workshop, Prague.
1 FANGS for BEAST J. Dingfelder, A. Eyring, Laura Mari, C. Marinas, D. Pohl University of Bonn
SVD DAQ Status Koji Hara (KEK) 2012/7/19 DAQ workshop1.
Status of the SVD DAQ Koji Hara (KEK) 2012/1/16 TRG/DAQ meeting1.
SVD Cables & Pipes Markus Friedl (HEPHY Vienna) B2GM, 24 July 2012.
7. Feb 2012 Thomas Bergauer (HEPHY Vienna) WP9.4 Status AIDA WP9.4 meeting.
The new SVD Power Supplies o General requirements o Power supplies structure o Tender process o Test system 2/10/2014SVD Power Supplies1 F.Forti, INFN.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
SVD FADC Status Markus Friedl (HEPHY Vienna) Wetzlar SVD-PXD Meeting, 5 February 2013.
Panja Luukka. Silicon Beam Telescope (SiBT) Group Since 2007 a collaboration of several CMS institutes has been operating a silicon micro-strip beam telescope.
SVD Slow Control Markus Friedl (HEPHY Vienna) DAQ/SC Kickoff Meeting, 8 November 2012.
Silicon Vertex Detector Schedule 23 July 2012 Christian Irmler (HEPHY Vienna) 12 th Open Meeting of the Belle II Collaboration.
SVD FADC SVD-PXD Göttingen, 25 September 2012
SVD Electronics Constraints
SVD Introduction Wetzlar SVD-PXD Meeting, 4 February 2013
Electronics & Machine Shop
Markus Friedl (HEPHY Vienna)
Christoph Schwanda (HEPHY Vienna) For the Belle II SVD group
Silicon Lab Bonn Physikalisches Institut Universität Bonn
Test Beam Measurements october – november, 2016
SVT detector electronics
Setup for testing LHCb Inner Tracker Modules
Presentation transcript:

11 June 2015 Thomas Bergauer (HEPHY Vienna) Belle II SVD beam Test SPS 2015 SPS users meeting

Belle II SVD beam test SPS June 2015 Belle II Silicon Vertex Detector Four layers with 6” double- sided strip detectors at larger radii and forward part Large, individually read out sensors (12 x 6(4) cm) APV25 based FE readout electronics inside acceptance region Maintain low material budget Lightweight mechanics Thin cooling pipes (CO 2 ) Fast readout Layer 3 to 6: 4 layers of double-sided strip sensors Thomas Bergauer (HEPHY Vienna)2 Layer Radius Ladders mm mm mm mm 7 Layer 1-2: Two layers of DEPFET pixels

Belle II SVD beam test SPS 2015 Ladder of Layer 6 Basic element “atomic unit” is one ladder Only FW and BW module can be assembled independently No single Origami module with one sensor possible 11 June 20153Thomas Bergauer (HEPHY Vienna) FW module BW module Possible separate modules: Origami flexes APV25 chips Airex spacer Silicon Sensors PCB Hybrid Pitch adapters Ribs

Belle II SVD beam test SPS June 2015 Belle II SVD Readout System Thomas Bergauer (HEPHY Vienna) APV25 chips Front-end hybrids Rad-hard DC/DC converters Analog level translation, data sparsification and hit time reconstruction ~2m cable 8 DOCK boxes ~10m cable 48 FADC+PROC Optical link (>20m) 48 FTB COPPER FTB COPPER FADC+PROC DOCK Inside of SVD Crates on top of Belle IIElectronics Hut DatCon system Belle II DAQ system Find RoI AMC board PXD

Belle II SVD beam test SPS 2015 Beam test setups: H6A Full Belle II Setup One full ladder (layer 5) „Pseudo-telescope“ with single modules in front/back Prototype of full DAQ system CO 2 cooling system Thomas Bergauer (HEPHY Vienna)11 June 2015 Vienna open CO 2 system 5 H6A DUT box with xy stage and “pseudo-telescope”

Belle II SVD beam test SPS 2015 Beam test setups: H6B AIDA Telescope Two FE-I4 planes with USBPix readout Two DUT planes of Belle II SVD sensors Test resolution Thomas Bergauer (HEPHY Vienna)11 June 20156

Belle II SVD beam test SPS 2015 Hit maps Mimosa AIDA telescope 7Thomas Bergauer (HEPHY Vienna)11 June upstream downstream

Belle II SVD beam test SPS 2015 Correlations Mimosa planes 8Thomas Bergauer (HEPHY Vienna)11 June /1 x0/1 y 0/2 x 0/2 y0/3 x 0/3 y 0/4 x 0/4 y0/5 x 0/5 y Downstream planes misaligned by 100px in both x and y coordinate (1.8mm)

Belle II SVD beam test SPS 2015 FE-I4 plane Three sensors brought to CERN from MPI Munich by Anna Macchiolo –One not working –One FE-I4a installed –One FE-I4b installed –Due to different version (a/b) they cannot read out together Readout with USBPix readout system –Fully integrated by EUDAQ producer Thomas Bergauer (HEPHY Vienna)11 June 2015 Adapter card looks different since our version can read out Up to four single chip cards 9

Belle II SVD beam test SPS 2015 Hitmaps FEI4 Upstream (initial position)downstream 10Thomas Bergauer (HEPHY Vienna)11 June 2015 Misalignment (hopefully) corrected mechanically, but not tested yet

Belle II SVD beam test SPS 2015 FE-I4 Residuals FE-I4 pixel size is 250x50 µm Resolutions: calculated: 72.2 x 14.4 µm Measured: 75.6 x 16.8 µm 11Thomas Bergauer (HEPHY Vienna)11 June 2015

Belle II SVD beam test SPS 2015 DUT residuals Trapezoidal sensor: Pitch on p-side between 50 and 75um with one intermediate strip (capacitively coupled) Strip length on n-side between 57 and 38mm 12Thomas Bergauer (HEPHY Vienna)11 June µm 13µm

Belle II SVD beam test SPS 2015 Beam Profile According to Nikos/Edda horizontal beam profile is not perfectly Gaussian due to low intensity 13Thomas Bergauer (HEPHY Vienna)11 June mm 122mm 0mm 57mm