A presentation on the stages of the mining cycle and how communities can be involved. Module No. 1 Life Cycle of Large-Scale Mining.

Slides:



Advertisements
Similar presentations
Ministry of Mines and Steel Development ``FORMALIZATION AND LEGALIZATION OF ARTISANAL AND SMALL- SCALE MINING IN NIGERIA A PRESENTATION BY ENGR. CHARLES.
Advertisements

Policies and Procedures for Civil Society Participation in GEF Programme and Projects presented by GEF NGO Network ECW.
IMMIGRATION LAW SECTION 9 CONTRACTING WITH GOVERNMENTAL ENTITIES.
Environmental Assessment in Nova Scotia
Subchapter M-Indian Self- Determination and Education Assistance Act Program Part 273-Education Contracts under Johnson-OMalley Act.
Learning and Development Evidence Collection Planning January 2015.
SOCIAL DEVELOPMENT AND MANAGEMENT PROGRAM (SDMP)
The BC Oil & Gas Commission Proactively Participating in Project Decision Making Processes James O’Hanley Deputy Commissioner.
Water Demands for Mining Richard Lowerre Adapted from presentation to Texas Groundwater Summit September 2013.
April 14, 2015 |AIM Conference Center, Makati City
1 Licensing in the Energy Sector Georgian National Energy And Water Supply Regulation Commission Nugzar Beridze June 27 – July 3, 2008.
Improved Transaction Flows and Cost 1 Improved Transaction Flows and Costs Commitments Secretary Peter B. Favila Department of Trade and Industry Chair,
S1: Introduction Financial Audit A course for Audit Staff (Sr.AOs, AAOs & SOs)
5-1 McGraw-Hill/Irwin ©2002 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 5 Audit Planning.
Audit Planning and Documentation
NHPA, Section 106, and NEPA Highlights and Misconceptions.
Mining Lease Application Assessment: Processes within the Minerals and Energy Division PIRSA.
SARA IMG Event Johannesburg 10 April 2014 Changes in South African Immigration Law.
Part 1.3 Mineral Rights & Leasing. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Understand.
Environmental Assessment in Newfoundland & Labrador Environmental Assessment in Federations: Current Dynamics and Emerging Issues Conference Current Dynamics.
IDEA 2004 Procedural Safeguards: Legal Rights and Options Mississippi Association of School Superintendent Spring, Mississippi Department of Education.
UNECE and OSCE joint event, Almaty, May 2012
Audit of Public Procurement
1 INTERREG IIIB “ATLANTIC AREA” Main points of community regulation 438/2001 financial management and control systems EUROPEAN COMMISSION SPAIN.
SEMINAR on the EEA Financial Mechanism THE EUROPEAN COMMISSION DIRECTORATE- GENERAL REGIONAL POLICY Brussels 13 June 2005 Control and Audit Nicholas Martyn.
7 - 1 Copyright  2003 Pearson Education Canada Inc. CHAPTER 7 Audit Planning and Documentation.
MiFID and Derivative Markets Burçak Inel Head of Regulatory Affairs Federation of European Securities Exchanges (FESE) 9 th Annual Conference of the Association.
Legal Procedure of Formation of Company
Chapter 8: Client Risk Profile and Documentation
INCREASE OF AUTHORISED SHARE CAPITAL 1)Where a company planning to increase its share capital beyond its authorised share capital, it should file with.
The CDM Project Cycle. The first step -- submit a PIN (template on Description of Project Proponent Type of Project Location of.
HDMF HDMF, more popularly known as PAG- IBIG fund was the solution to the need for national savings program and shelter financing for Filipino workers.
Exploration for and Evaluation of Mineral Resources: IFRS 6 Wiecek and Young IFRS Primer Chapter 12.
Exploration for and Evaluation of Mineral Resources: IFRS 6 Wiecek and Young IFRS Primer Chapter 12.
Onshore oil and gas: environmental regulation and the consenting process UKELA Seminar 23 September 2015.
Nadine Peterson Preservation Planner NH Division of Historical Resources Lynne E. Monroe Preservation Company Christopher W. Closs Christopher W. Closs.
1 Workshop on the Directive 96/61/EC concerning (IPPC) Integrated pollution prevention and control INFRA Public participation & access to environmental.
Surveying principles 1 Public Water Suppliers S. Ross Hansen P.E., L.S. Region Engineer 4/10/2014 Rural Water Certification Class.
INTRODUCTION The 1987 Philippine Constitution lays down the basic framework for our policy on the environment. Section 16, Article II states that “The.
SEVESO II transposition and implementation – possible approaches and lessons learned from MS/NMS SEVESO II transposition and implementation – possible.
Environmental Impact Assessment in the Slovak republic.
Copyright © 2007 Pearson Education Canada 7-1 Chapter 7: Audit Planning and Documentation.
FORMING A COMPANY. STAGES INVOLVED IN THE PROCESS PROMOTION REGISTRATION OR INCORPORATION CAPITAL SUBSCRIPTION COMMENCENT OF BUSINESS.
A presentation on the stages of the mining cycle and how communities can be involved. Module No. 3 Life Cycle of Large-Scale Mining.
PH-CSO Agenda Extractive Industry Transparency Initiative (EITI)
S1: Introduction Financial Audit A course for IA&AS Officers.
A presentation on the stages of the mining cycle and how communities can be involved. Module No. 2 Life Cycle of Large-Scale Mining.
1 Waste Discharge Authorization Application - British Columbia WG6 Application Process WG Document Review presented by Helga Harlander October x, 2008.
DELINEATION OF THE PHILIPPINE Department of Energy, Philippines
Formation of a company is a complex activity involving completion of a lot of legal formalities and procedures. To fully understand the process one can.
SEVESO II transposition and implementation: Possible approaches and lessons learned from member states and new member states SEVESO II transposition and.
Field Work Laws and Regulations. Field Work Laws and Regulations This is one of a series of mini – modules designed to give the auditor guidance in the.
Lecturer: Lina Vladimirovna Zhornyak, associated professor.
Mirae Energy Asia Corporation (MAEC) Pursuant to RA 9513 or the Renewable Energy Act of 2008, Mirae Energy Asia Corporation was established and registered.
FSC Caribbean Group of Securities Regulators 10th Annual Conference and Workshop November 6 -8, 2013.
1 BSO Welcome. 2 General Login Attestation 3 BSO Login.
Lithuanian Water Suppliers Association LEGAL REGULATION OF WASTEWATER DISPOSAL AND TREATMENT IN LITHUANIA.
Preparation and Analysis of Project Report. What is a Project Report?  A Project Report is a detailed description of the Project  The Project Report.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
Pat Nestor MSCSI MRICS Head of Building Control Dublin City Council
Public Participation Network
Public Participation Network
CHAPTER 7 Audit Planning and Documentation
Formation of a Joint Stock Company
Lockheed Martin Canada’s SMB Mentoring Program
Lockheed Martin Canada’s SMB Mentoring Program
Operationalizing Export Certification and Regionalization Programmes
AOITI WG3 Privacy-in-IoT Taskforce
New Special Education Teacher Webinar Series
CLIENT PROFILE REGISTRATION SYSTEM (CPRS)
Presentation transcript:

A presentation on the stages of the mining cycle and how communities can be involved. Module No. 1 Life Cycle of Large-Scale Mining

First Stage: Mineral Scoping & Assessment Of Mining Project Feasibility Module 1: Exploration Phase

Advocating transparency & accountability in the extractive industry Exploration Defined As defined by RA 7942 (Mining Act), section 3(q), Chapter 1: “searching or prospecting for mineral resources by geological, geochemical, or geophysical surveys, remote sensing, test pitting, trending, drilling, shaft sinking, tunneling or any other means for the purpose of determining the existence, extent, quantity and quality thereof and the feasibility of mining them for profit.”

Overview Advocating transparency & accountability in the extractive industry File an application for an EXPLORATION PERMIT

Overview Advocating transparency & accountability in the extractive industry Secure area status/consent/clearance

Overview Advocating transparency & accountability in the extractive industry Ensure the publication of the Notice of Application

Overview Advocating transparency & accountability in the extractive industry Secure other necessary permits

Overview Advocating transparency & accountability in the extractive industry Exploration activities

Overview Advocating transparency & accountability in the extractive industry Renewal of Exploration Permit, if applicable

Advocating transparency & accountability in the extractive industry STEP 1: File an application for an Exploration Permit Requirements 1.Two-year exploration work program (MGB Form No.5-4) 2.Location map/sketch plan of the proposed permit area 3.Proof of technical competence 4.Proof of financial capability National Mapping & Resource Info. Authority (NAMRIA)

Advocating transparency & accountability in the extractive industry STEP 1: File an application for an Exploration Permit Requirements 5. Photocopy of Articles of Incorporation/Partnership/ Association, By-Laws and Certificate of Registration 6. Affidavit of Undertaking for corporation, partnership, association or cooperatives (Annex A of DENR Memorandum Order No ) Securities and Exchange Commission

Advocating transparency & accountability in the extractive industry STEP 1: File an application for an Exploration Permit Requirements 7. Environmental Work Program (MGB Form No or MGB Form No. 16-1A) 8. Certificate of Environmental Management and Community Relations Record (CEMCRR)/Certificate of Exemption OPTIONAL: 1) Local governments concerned; 2) affected communities 1) DENR- MGB regional office & 2) DENR- Environmental Management Bureau

Advocating transparency & accountability in the extractive industry STEP 1: File an application for an Exploration Permit Requirements 9. Certification Precondition/Certificate of non-overlap 10. Other supporting documents required National Commission on Indigenous Peoples DENR-Mines and Geosciences Bureau (MGB) regional office

Advocating transparency & accountability in the extractive industry STEP 2: Secure Area Status/Consent/Clearance On the government end: The MGB Regional Office will check in the control maps if the area is free or open for mining applications. Affected municipalities/ cities and other relevant offices or agencies of the Government will be given a copy of the location map/sketch plan of the applied area for their information.

Advocating transparency & accountability in the extractive industry STEP 2: Secure Area Status/Consent/Clearance The mining company, however, is responsible for securing the necessary consent and clearances from these relevant offices and communities. Reasons for denial of clearance should have legal and technical basis. These include cases of overlapping of claims/conflicts/ complaints from landowners, NGOs, LGUs and other concerned stakeholders.

Advocating transparency & accountability in the extractive industry STEP 3: Posting of the Notice of Application in the Appropriate Channels Requirements 1. Pay for the expenses of the publication/ posting/radio announcements of the Notice of Application 2. Secure certification as proof of publication/ posting 1) DENR-MGB Regional Office; 2) Provincial Environmental and Natural Resources Office(s); 3) Community Environmental and Natural Resources Office(s); 4) concerned province(s) and municipality(ies), copy furnished the barangay(s) Same as above

Advocating transparency & accountability in the extractive industry STEP 4: After Exploration Permit, Secure Other Necessary Permits Requirements 1. Permits in cutting trees and timber rights, following relevant laws and regulations 2. Ensure Free and Prior Informed Consent DENR 1) Host Communities; 2) Indigenous Peoples; 3) CSOs, NGOs, POs

Advocating transparency & accountability in the extractive industry STEP 5: Exploration Activities Requirements 1. Gathering of data 2. Initial evaluation and development of pre- feasibility study 3. Preparation to file for declaration of mining project feasibility

Advocating transparency & accountability in the extractive industry Requirements 4. Preparation for the Environmental Impact Statement (EIS) and Initial Environmental Examination (IEE) report that are needed in obtaining the Environmental Compliance Certificate (ECC) in the next stage of the mining cycle. 1) Host Communities; 2) Indigenous Peoples; 3) CSOs, NGOs, POs STEP 5: Exploration Activities

Advocating transparency & accountability in the extractive industry Requirements 1. Justification of renewal 2. Comprehensive and validated technical report on the outcome of the two-year exploration works, including their environmental effects 3. Audited report of expenditures incurred during the exploration period STEP 6: Renewal of Exploration Permit, if applicable

Advocating transparency & accountability in the extractive industry Requirements 4. Two-year Exploration Work Program (MGB Form No. 5-4) 5. Environmental Work Program (MGB Form No or MGB Form No. 16-1A) STEP 6: Renewal of Exploration Permit, if applicable

Advocating transparency & accountability in the extractive industry Requirements 6. Other supporting papers as the Department/ Bureau may require or the applicant may submit. 7. Pay the expenses of the field verification by the DENR-MGB regional office STEP 6: Renewal of Exploration Permit, if applicable DENR-Mines and Geosciences Bureau (MGB) regional office

Acknowledgements of the support for materials development from: