March 29, 2005Arizona Public Service Company Presentation to NERC/NAESB Conference on the Future of OASIS The future view of transmission reservations,

Slides:



Advertisements
Similar presentations
WEQ EC Scoping Task Force on Coordination of Service Across Multiple Transmission Systems In Order 890, FERC directed transmission providers, working through.
Advertisements

WEQ EC Scoping Task Force on Coordination of Service Across Multiple Transmission Systems In Order 890, FERC directed transmission providers, working through.
FERCs OASIS II ANOPR Marvin Rosenberg Economist Division of Policy Analysis and Rulemaking Office of Markets, Tariffs and Rates Federal Energy Regulatory.
NAESB OASIS 1A Subcommittee Wendy Weathers, Chair ESS Meeting May 2005 Resale Recommendation.
Primary Objectives of WIT
MIC/ISAS LIAISON REPORT June 15, 2007 April, 2007 ISAS Meeting Highlights.
David H. Wiggs General Manager Los Angeles Department of Water and Power September 24, 2003.
Extended Connectivity Test Overview May 16 th, 2013.
Oasis Overview. 2 OASIS Overview What is OASIS? S –Open Access Same Time Information System –Electronic site for transmitting utility information to customers.
PacifiCorp-CAISO EIM Initiative Overview
The Power of Industry-Specific Business Magazines.
OASIS Subcommittee Status EC Meeting 2/18/14. Preemption and Competition Annual Plan Items Affected 2013 AP Item 2(a) Develop version 2 business practice.
EC Meeting 2/24/ AP Item 7(b) Modify NAESB standards WEQ , WEQ , and related standards to be consistent with the Commission’s policy.
Transmission Tariff and Market Design Rulemaking Alice Fernandez, Mark Hegerle, Kevin Kelly, Dave Mead, Ed Murrell, Joe Power, and Dave Withnell.
9/22/00 1 Jerry W. Smith. 9/22/00 2 Jerry W. Smith.
Duke Energy Carolinas Stakeholder Meeting Independent Entity Services September 12, 2008.
Pseudo-Tie Reservations
Conference on the Status of OASIS II MARCH 29 TH, 2005 FERC Offices Washington, DC John Simonelli ISO New England Inc Manager, Tariffs, Schedules & OASIS.
Andy Meyers Bonneville Power Administration Merchant Alert Protocol Market Interface Committee March 2015 Salt Lake City, UT.
Andy Meyers Interchange Scheduling and Accounting Subcommittee Chair Discussion Item: Use of Emergency eTags January 2015 Salt Lake City, UT.
© 2003 The McGraw-Hill Companies, Inc. All rights reserved. Return, Risk, and the Security Market Line Chapter Thirteen.
Network Economy System Overview and Demonstration May 3, 2007 Raj Hundal.
Joint Electric Scheduling Subcommittee Update August 20, 2013.
11 Why BPA Transmission Customers Aggregate Reservations Feb. 20, 2013.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N WIAB WECC Interchange Authority Backup BY LOU MIRANDA BONNEVILLE POWER ADMINISTRATION TRANSMISSION.
NERC Congestion Management Congestion Management Option 3 Vendor Meeting Julie Pierce – NERC IDCWG Chair.
PCI Webinar on Using PCI Energy Accounting System to Validate Meter Data March 5, 2015.
2013 Calendar Year Customer Survey Results
NAESB WEQ UPDATE Interchange Scheduling and Accounting Subcommittee Meeting Salt Lake, UT August 26, 2015 Bob Harshbarger Puget Sound Energy.
OASIS Overview Transmission Customer Forum May 8-9, 2008 Jim Viikinsalo May 8-9, 2008 Jim Viikinsalo.
Energy Markets 101 Tribal Solar Working Group March 24, 2015.
DC Tie Reservation and Scheduling with Mexico Shams Siddiqi representing Sharyland Utilities WMS Meeting May 15, 2007.
Duke Energy Carolinas Quarterly Stakeholder Meeting Independent Entity Services Thursday, May 13th, :00 to 3:00 p.m. EDT.
WestConnect Regional Transmission Service Tariff March 16, 2015.
Resale Business Practice Standards 3 Options remain.
OASIS Insights & Observations Transmission Customer Forum September 21-22, 2006 Jim Viikinsalo September 21-22, 2006 Jim Viikinsalo.
2014 Calendar Year Customer Survey Results. Background Open for comment February 12, 2015 through March 31, 2015 for evaluation of prior year – 21 close.
California Independent System Operator Participating Generator (PG) Certification Process CDWR Generation Resource Development Workshop 3/29/01 Kyle Hoffman.
Lead from the front Texas Nodal 1 EDS 4 Release 9.1 DAM/RUC/SASM Market Call January 11, 2008.
Proprietary and confidential. Do not copy or distribute without permission from OATI - © Open Access Technology International, Inc. Slide 1 ISO New England.
1 Joint Initiative Northwest Wind Integration Forum Policy Steering Committee Meeting January 6, 2010.
WestConnect RTO-ACC Update September 2, 2003 Cary Deise APS.
1 /17 Running Diagnostics Within TaxWise Online © 2006, Universal Tax Systems, Inc. All Rights Reserved. Running Diagnostics Within TaxWise Online Objectives.
Resale Business Practice Standards 3 Options remain.
Challenged Programs Undergraduate: –Electronics Technology –Energy Technology Graduate: –MCLL –Philosophy –Sociology –Parks, Tourism, & Recreation Management.
Kathy Anderson Idaho Power
Duke Energy Carolinas Quarterly Stakeholder Meeting Independent Entity Services Wednesday, January 28, :00 to 3:00 p.m. ET.
Electronic signature Validity Model 1. Shell model Certificate 1 Certificate 2 Certificate 3 Signed document Generate valid signature validCheck invalidCheck.
Workshop on State-Level Electricity Reforms: Firm Choices, Emerging Generation Markets and Externalities “Open Access: Experiences” ALOK ROY General Manager,
Federal Energy Regulatory Commission MISO/Alliance Companies’ RTO Status Reports Presented by: Joseph Power Tony Ingram Rahim Amerkhail Patrick Clarey.
– 1Texas Nodal Texas Nodal ICCP Business Case By Jeyant Tamby, ERCOT.
NAESB Update Kathy Anderson October 2015 MIC Meeting.
Chapter6: E-Commerce Web Sites HNDIT11062 – Web Development 1.
1 CREPC 101 September 19, 2005 San Diego. 2 CREPC 101 CREPC History – Doug Larson Operation of Committee – Marsha Smith Relationship with other Western.
SATMathVideos.Net A set S consists of all multiples of 4. Which of the following sets are contained within set S? A) S2 only B) S4 only C) S2 and S4 D)
Transmission Customer Meeting March  Sponsor Supervisors o John Walker o Amy Light  Team o Matt Richard o Johnny Useldinger o Jonnette Hemry.
After-the-Fact Workgroup Update Sheryl Welch ISAS Meeting January 12-13, 2016 Phoenex, AZ.
Searching ASSIST DoD Standardization Conference March 4, 2008 Joseph Delorie, DSPO.
WEQ Executive Committee Contract Path Task Force Additional Issues Related To Contract Path Management ( WEQ and WEQ )
UNCONDITIONAL AND LEAD TIMES PREEMPTION AND COMPETITION TIMING.
NITS on webSmart OASIS. NITS on webSmart OASIS Agenda  Company and User Permissions  Electronic Industry Registry requirement  WebSmart OASIS NITS.
TST R01-MBT_for_test_suites_development Use of MBT for test suites development- discussion Group Name: TST WG Source: Easy Global Market (EGM)
Multiplication Timed Tests.
FIN 571 Week 5 DQ 1 Because the weighted average is always a correct measure of a required return, why do firms not create securities to finance each project.
GeoMesh Blockchain Networking - Slide Presentation
Police Conduct Certificate
Tagging a Network Scheduling Right
Best Social Media Marketing Company
2019 Annual Plan Items 3b and 3f (formerly 2018 API 3c and 3h)
OASIS Notification Recommendation.
Presentation transcript:

March 29, 2005Arizona Public Service Company Presentation to NERC/NAESB Conference on the Future of OASIS The future view of transmission reservations, e-tagging and scheduling

March 29, 2005Arizona Public Service Company Current OASIS, Scheduling and E-tagging OASIS systems do not share E-tagging system allows the creation of bad e-tags Some systems can communicate adjacent IA schedules to each other Hence check-out may still be verbal

March 29, 2005Arizona Public Service Company Current OASIS, Scheduling and E-tagging Some TP have hourly product but may only be one type (firm or non-firm) Some TP’s have like products to that contiguous transmission available

March 29, 2005Arizona Public Service Company Example of an existing OASIS that assists the energy markets Common UI and security certificates Some wesTTrans TP’s have like products to that make contiguous transmission possible OASIS like wesTTrans make multiple non-contiguous reservations possible

March 29, 2005Arizona Public Service Company Future OASIS, Electronic Scheduling and E-Tagging OASIS is made and linked to others Linked OASIS ready for E-tag creation E-Tag generated from OASIS data  POR/POD consistency  Source/Sink consistency  Correct ordering of SE’s  Electronic validation and checkout