Roma, Riunione CSN1: Maggio 2004F. Bedeschi, INFN-Pisa 1/13 CDF  Stato del Tevatron  Stato del rivelatore  Upgrades in corso  Richieste finanziarie.

Slides:



Advertisements
Similar presentations
Leptoquark Searches at the Tevatron April 16th, 2004 XII th Deep Inelastic Scattering Workshop Štrbské Pleso, Slovakia For the CDF and DØ Collaborations.
Advertisements

Franco Bedeschi – INFN-Pisa Gruppo1 – 13 Maggio 2003 CDF: Prospettive e upgrades Stato Tevatron e CDF Stato di avanzamento dell’analisi Calcolo (v. presentazione.
CDF Operations Bob Wagner, ANL May 09, 2005 All Experimenters’ Meeting.
CDF CDF Operations Steve Hahn February 7, 2005 All Experimenters ’ Meeting.
Bob Wagner, ANL Dec 15, 2005 CDF Weekly Meeting
LHCb Upgrade Overview ALICE, ATLAS, CMS & LHCb joint workshop on DAQ Château de Bossey 13 March 2013 Beat Jost / Cern.
Status of Eric Kajfasz CPPM/Fermilab GDR-Susy, Lyon - 26 novembre 2001.
FPCP 2002, 05/16-18/2002 p. 1 Richard E. Hughes, The Ohio State UniversityCDF Run II Status Status of CDF and Prospects Flavor Physics and CP Violation.
J. Leonard, U. Wisconsin 1 Commissioning the Trigger of the CMS Experiment at the CERN Large Hadron Collider Jessica L. Leonard Real-Time Conference Lisbon,
CDF Trigger System Veronica Sorin Michigan State University Silicon Workshop UCSB May 11,2006.
Silicon Tracking for Forward Electron Identification at CDF David Stuart, UC Santa Barbara Oct 30, 2002 David Stuart, UC Santa Barbara Oct 30, 2002.
CDF Current Status and Future Prospects Ted Liu Fermilab DOE review, May 2006.
Pisa: Settembre 2003F. Bedeschi, INFN-Pisa 1 CDF: Prospettive e upgrades  Stato Tevatron e CDF  Risultati recenti e prospettive  Run IIB:  Situazione.
13 January All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 January 6-12 We had to sacrifice.
EPS 2003, July 19, 2003David Buchholz, Northwestern University Performance of the D0 Experiment in Run II Detector Commissioning and Performance Accelerator,
CDF perspectives and Computing needs KISTI, Dec 5 th 2008 DongHee Kim.
Lukens - 1 Run IIb Project Motivations Integrated luminosity or duration of the run motivates us to  Replace the silicon detector - Radiation damage to.
Scientific Highlights : CDF Experiment 1.Introduction 2.CDF Run-II detector 3.Phyiscs highlights B Physics, Top, Higgs, … to be continued by Rob October.
June 28, 2002BEACH2002 B Physics at the Tevatron B Physics at the Tevatron Jack Cranshaw Texas Tech University For the CDF and D0 Collaborations.
P5 recommendation on Tevatron running Report of June 8 meeting FNAL.
Cluster Finder Report Laura Sartori (INFN Pisa) For the L2Cal Team Chicago, Fermilab, Madrid, Padova, Penn, Pisa, Purdue.
27 July 2006Trigger Upgrades Review1 Status & Plans of the TDWG Mission Statement What Do We have to Guide Us ? Caveats & Concerns Current & Anticipated.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
The CDF Online Silicon Vertex Tracker I. Fiori INFN & University of Padova 7th International Conference on Advanced Technologies and Particle Physics Villa.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
FNAL Users’ Meeting, 06/02/03, p. 1 Top and Electroweak Results from CDF Igor Volobouev LBNL for the CDF Collaboration.
17 February All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 February Dedicated some.
TDAQ Upgrade Software Plans John Baines, Tomasz Bold Contents: Future Framework Exploitation of future Technologies Work for Phase-II IDR.
All Experimenters MeetingDmitri Denisov Week of July 16 to July 22 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 1.6pb -1 u Recorded:
CDF Performance and Improvements: Young-Kee Kim (U.Chicago), Sept , P5 Meeting0 CDF Performance and Improvements Detectors, Triggers, Offline, and.
Tevatron II: the world’s highest energy collider What’s new?  Data will be collected from 5 to 15 fb -1 at  s=1.96 TeV  Instantaneous luminosity will.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
Electroweak and Related Physics at CDF Tim Nelson Fermilab on behalf of the CDF Collaboration DIS 2003 St. Petersburg April 2003.
DPF2000, 8/9-12/00 p. 1Richard E. Hughes, The Ohio State UniversityHiggs Searches in Run II at CDF Prospects for Higgs Searches at CDF in Run II DPF2000.
Fermilab Users Meeting June R.J. Tesarek Fermilab CDF 2002 Toward Physics Richard J. Tesarek Fermilab For the CDF Collaboration.
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
Online Monitoring for the CDF Run II Experiment T.Arisawa, D.Hirschbuehl, K.Ikado, K.Maeshima, H.Stadie, G.Veramendi, W.Wagner, H.Wenzel, M.Worcester MAR.
7/20/04Director's Review - SVT Upgrade1 Silicon Vertex Trigger (SVT) Upgrade J. Adelman, I. Furic, Y.K. Kim, M. Shochet, U.K. Yang (Chicago) T. Liu (Fermilab)
Jefferson Laboratory Hall A SuperBigBite Spectrometer Data Acquisition System Alexandre Camsonne APS DNP 2013 October 24 th 2013 Hall A Jefferson Laboratory.
ATLAS Trigger Development
Pulsar Status For Peter. L2 decision crate L1L1 TRACKTRACK SVTSVT CLUSTERCLUSTER PHOTONPHOTON MUONMUON Magic Bus α CPU Technical requirement: need a FAST.
All Experimenters MeetingDmitri Denisov Week of September 9 to September 16 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 4.0pb.
SVT Nov 7, 2002Luciano Ristori - Vertex2002_7Nov02.ppt1 SVT The CDF Silicon Vertex Trigger Vertex 2002 Luciano Ristori Istituto Nazionale di Fisica Nucleare.
All Experimenters MeetingDmitri Denisov Week of September 2 to September 8 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.9pb.
Richard E. Hughes 21 September 2003; p.1 IEEE/NSS 2003 Portland, OR eXtremely Fast Tracker; The Sequel Richard Hughes, Kevin Lannon Ben Kilminster, Brian.
1 Electronics Status Trigger and DAQ run successfully in RUN2006 for the first time Trigger communication to DRS boards via trigger bus Trigger firmware.
New Trigger Strategies Discussion Perimeter Institute HL-LHC Workshop June 8, 2015 Eva Halkiadakis, Matt Strassler, Gordon Watts.
Susan Burke DØ/University of Arizona DPF 2006 Measurement of the top pair production cross section at DØ using dilepton and lepton + track events Susan.
First physics results with the Silicon Vertex Trigger at CDF-II 2 nd Workshop on the CKM Unitarity triangle. April 5 th -9 th IPPP Durham, England, UK.
Kaori Maeshima Fermilab Jan. 12, University Evolution: Search in High Mass Dilepton Channel in CDF Pre Run I Run 1A, Run 1B, and Run II......
All Experimenters MeetingDmitri Denisov Week of July 22 to July 29 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.1pb -1 u Live:
1 Run IIb Event Builder upgrade Director’s Review Jan Steve TetherRon RechenmacherMarkus KluteBruce Knuteson MITFNAL/CDMITMIT RonSteve Motivation.
Performances of the upgraded SVT The Silicon Vertex Trigger upgrade at CDF J.Adelman 1, A.Annovi 2, M.Aoki 3, A.Bardi 4, F.Bedeschi 4, S.Belforte 5, J.Bellinger.
Evelyn Thomson Ohio State University Page 1 XFT Status CDF Trigger Workshop, 17 August 2000 l XFT Hardware status l XFT Integration tests at B0, including:
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
Search for Standard Model Higgs in ZH  l + l  bb channel at DØ Shaohua Fu Fermilab For the DØ Collaboration DPF 2006, Oct. 29 – Nov. 3 Honolulu, Hawaii.
Trigger & Tracking detector for CMS
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
Optical data transmission for
Commissioning of the ALICE HLT, TPC and PHOS systems
Trigger, DAQ, & Online: Perspectives on Electronics
Tevatron run issues with higher luminosity
Francesco Forti University and INFN, Pisa
Kevin Burkett Harvard University June 12, 2001
14 paesi, 62 universita’ e laboratori
CMS Goal of the experiment
Example of DAQ Trigger issues for the SoLID experiment
John Harvey CERN EP/LBC July 24, 2001
Susan Burke, University of Arizona
Presentation transcript:

Roma, Riunione CSN1: Maggio 2004F. Bedeschi, INFN-Pisa 1/13 CDF  Stato del Tevatron  Stato del rivelatore  Upgrades in corso  Richieste finanziarie (MOF)  Stato analisi dati  G. Punzi  Stato computing  S. Belforte OUTLINE Riunione CSN1 Roma: 17 Maggio, 2004 Franco Bedeschi INFN-Pisa

Roma, Riunione CSN1: Maggio 2004F. Bedeschi, INFN-Pisa 2/13 Extended Tev goals  Luminosity plan 2002  Goals 2002/03 accomplished  link  link  Goals 2004 ~ 300 pb -1  Very likely  Tevatron is performing very well  P-bars injected from recycler! YearBase plan luminosity/yr (fb -1 ) Design plan Luminosity/yr (fb -1 ) FY FY FY FY FY FY FY FY Total Base plan ~ no recycler link L max = 2 x 10 32

Roma, Riunione CSN1: Maggio 2004F. Bedeschi, INFN-Pisa 3/13 Design and Base Projections We are here

Roma, Riunione CSN1: Maggio 2004F. Bedeschi, INFN-Pisa 4/13 TeV Luminosity (current situation)  Peak luminosity  Best 7.0 x10 31 !!!  Delivered/on tape  500/400 pb -1 /~100 bad due to COT  Analyses use data till Feb. 04  ~ 240 pb -1 > 2 x Run 1 Delivered On tape Integrated Luminosity Initial Instantaneous Luminosity 7 x Luminosity vs. time

Roma, Riunione CSN1: Maggio 2004F. Bedeschi, INFN-Pisa 5/13 Startup luminosity  Current delivered luminosity is exceeding design goals Design Base

Roma, Riunione CSN1: Maggio 2004F. Bedeschi, INFN-Pisa 6/13 COT problem  COT is experiencing an unexpected gain loss ~ 20%/yr  Chamber is currently operating at strongly reduced gain to prevent further damage New wire SL 2 wire now

Roma, Riunione CSN1: Maggio 2004F. Bedeschi, INFN-Pisa 7/13 COT problem  Chamber expected to be very radiation hard  Expected currents on SL1 is 4.5 L = 2x10 32 From 0.15 Coul/cm (2 fb -1 ) to 0.60 Coul/cm (8 fb -1 ) Predict < 1% gain loss at 1 Coul/cm  no problem …..

Roma, Riunione CSN1: Maggio 2004F. Bedeschi, INFN-Pisa 8/13 COT problem  Observations and diagnosis:  Gain loss has z and phi dependence  Reversing gas flow reverses pattern of damage  Damage most likely caused by insufficient gas flow  Actions taken:  Implement gas re-circulation system (80% re-circulated) Old flow 20 SCF/hr  40  200 testing effectiveness now Can push as high as 1000 SCF/hr this summer  Back up plans:  Increase operating temperature 72  82 F  Change gas Ar-CO 2 (or even CF 4 ?)

Roma, Riunione CSN1: Maggio 2004F. Bedeschi, INFN-Pisa 9/13 Trigger status  Continuously update to deal with higher luminosity  December 2003: 10kHz, 300Hz, 55Hz had ~25% deadtime L1: improve prescales and XFT L2: cut on muons, faster code, SVT fast abort L3: 64 more CPU’s, faster code  Now: L1/L2/L3 can run at 20kHz, 350Hz, 60Hz with low dead time, but…  SVT is dropped beyond 6x10 31 ….. Faster SVX readout Road Warrior (mostly Italian work) to remove ghost track before fitters SVT upgrade

Roma, Riunione CSN1: Maggio 2004F. Bedeschi, INFN-Pisa 10/13 Status CPR  M&S:  PO’s completed  ~ All material at Fermilab  Module production started  2 modules finished  Italian techs at work  HV work in progress  Cables and patch panels  Control and monitor software  Timeline:  Installation starts September 04  Module construction ends in July

Roma, Riunione CSN1: Maggio 2004F. Bedeschi, INFN-Pisa 11/13 Status CPR  Performance of first two modules as expected  Production at full speed 16 pe/MIP after full optical path Source scan

Roma, Riunione CSN1: Maggio 2004F. Bedeschi, INFN-Pisa 12/13 Status SVT upgrade  Prototype AM Chip design ready for production  Bid approval by INFN delayed  Hope to get into end of June slot at UMC Chips back in 3 mo  Plan for production in early 2005  With real design less patterns/chip  more chips needed  Additional cost is 40 k€ on FY2005  Long range plans of SVT upgrade being made at CDF  Even more chips may be needed, but with additional out side contributions

Roma, Riunione CSN1: Maggio 2004F. Bedeschi, INFN-Pisa 13/13 MOF  History:  250 k€ requested at September 2003 CSN1 meeting Referees favorable, but only 150 k€ assigned  INFN rep. promised 300 k$ = 250 k€ at IFC meeting in October 2003  150 k€ already spent and accounted for  Plan for use of additional 100 k€ already discussed with Fermilab Mostly help on unexpected COT costs  Request:  100 k€ now to complete FY2004 running cost contributions  Contributions to computing separate  Discussed in Belforte’s presentation

Roma, Riunione CSN1: Maggio 2004F. Bedeschi, INFN-Pisa 14/13

Roma, Riunione CSN1: Maggio 2004F. Bedeschi, INFN-Pisa 15/13 Tev 2003 Luminosity  Goals for 2003  Base goals: 200 pb -1 in FY pb -1 /wk end of x10 31 typical  Stretch goals: 320 pb -1 in FY pb -1 /wk end of x10 31 typical (~max achievable without Recycler)  Integrated luminosity goal achieved, but … Half of shutdown in FY04 Avg. lum. lower than predicted  FY04: Double data set ~150 pb -1 As of 5/6/03 ~250 pb -1 As of 9/3/03 back

Roma, Riunione CSN1: Maggio 2004F. Bedeschi, INFN-Pisa 16/13 Tev goals beyond 2003  Fermilab long range plan (M.Witherell P5 presentation – March 26, 2003) back

Roma, Riunione CSN1: Maggio 2004F. Bedeschi, INFN-Pisa 17/13 Silicon status  ~ 92% operational  ~85% has low readout error rate 92% Operational ladders Error rate < 1% Jan 04Jun 03 Jan 02 Jun 02

Roma, Riunione CSN1: Maggio 2004F. Bedeschi, INFN-Pisa 18/13 CDF Data Acquisition System  Level 1 trigger  pipelined and “deadtimeless”  fully synchronous  designed for 132ns operation  on L1A, write data to 1 of 4 local L2 buffers  Level 2 trigger  asynchronous  L1 + supplemental info  Level 3 trigger  full detector readout  PC farm runs reconstruction  output to mass storage

Roma, Riunione CSN1: Maggio 2004F. Bedeschi, INFN-Pisa 19/13 CDF Run II Trigger System  Level 1 trigger  tracking  calorimeter: jets & electrons, MET  muons  Level 2 trigger  L1 information (tracks, e,  )  calorimeter shower max  silicon information  algorithms run in L2 processor  Level 3 trigger  full detector readout  “offline” processing Detector Readout path

Roma, Riunione CSN1: Maggio 2004F. Bedeschi, INFN-Pisa 20/13 Summary of Run IIb specifications  Level 1 Accept rate: >25kHz (spec 50kHz)  deadtimeless  Level 2 Accept rate: 750 Hz  bursts to 1.1kHz  L2 processing deadtime < 5%  readout deadtime (on L2A) < 5%  Level 3 Accept rate: 85Hz  Event builder rate: 400MB/s  Output data rate: 40MB/s  Reminder: trigger & bandwidth rates estimated based upon Run IIa, significant underestimate possible (assumes linear growth in fake contribution)

Roma, Riunione CSN1: Maggio 2004F. Bedeschi, INFN-Pisa 21/13 DAQ/Trigger Summary  These are the pieces of the CDF Front-end, Trigger and Data Acquisition system we need to upgrade/update to carry out a high p T physics program  TDC replacement  XFT upgrade  SVT upgrade  L2 replacement  Event builder/L3 upgrade  The remainder of the Run IIa CDF front-end/trigger/DAQ system will perform well throughout Run IIb