Tracker Summary Alan Bross MICE CM17 CERN February 25, 2007.

Slides:



Advertisements
Similar presentations
Takashi Matsushita Imperial College T. Matsushita 1 Station 5 status.
Advertisements

MICE Collaboration MTG IIT – Feb 2002 The Fiber Tracker Option for MICE Spectrometers The D0 Central Fiber Tracker – Experience and Implications for MICE.
Status of MICE Tracker System H. Sakamoto, Osaka University (on behalf of the MICE Collaboration) International Muon Ionization Cooling Experiment (MICE)
First Results from Tracker 1  Cryostat Commissioning  AFE/VLSB Firmware and Readout  Cosmic Ray Setup  Tracker Readout  Software  Trigger Timing.
1 Scintillating Fibre Cosmic Ray Test Results Malcolm Ellis Imperial College London Monday 29 th March 2004.
Status of the MICE SciFi Simulation Edward McKigney Imperial College London.
MICE Tracker Readout Overview channel AFE II-t boards - 8 Visible Light Photon Counter (VLPC) cassettes - 4 cryostats.
1 VLPC system and Cosmic Ray test results M. Ellis Daresbury Tracker Meeting 30 th August 2005.
KEK Analysis Report Makoto Yoshida Osaka Univ. 2006/06/10 MICE CM15.
MICE Tracker Front End Progress Tracker Data Readout Basics Progress in Increasing Fraction of Muons Tracker Can Record Determination of Recordable Muons.
1 MICE Tracker Readout Update, Preparation for Cosmic Ray Tests Introduction/Overview AFE-IIt firmware development VLSB firmware development Hardware progress.
1 Online data quality and monitoring M. Ellis Daresbury DAQ Meeting 31 st August 2005.
February 8 th, 2001 Status Report: SciFi for MICE Edward McKigney Imperial College London.
MICE Video MTG 9/25/2002 MICE Fiber Tracker Design Update Requirements and Proposed Detector Implementations A. Bross Fermilab.
G.Barber Tracker Update, Berkeley 10 Feb Tracker Progress Contents:- Station Space Frame Patch Panel / Vacuum Seal Light Guide Map Position of Degrader/Support.
1 Analysis code for KEK Test-Beam M. Ellis Daresbury Tracker Meeting 30 th August 2005.
1 KEK Beam Test Analysis Hideyuki Sakamoto 15 th MICE Collaboration Meeting 10 st June,2006.
Prototype Performance in D0 test stand & fiber intrinsic performance with KEK test beam M.Yoshida (Osaka Univ.) Osaka.
Tracking Detectors Working Group MICE Collaboration Meeting March 30, 2004 A. Bross.
1 Status of the MICE SciFi Tracker Malcolm Ellis Imperial College London Tuesday 9 th March 2004.
6 th April 2005 Malcolm Ellis, Imperial College London 1 Sci Fi Status & KEK Test.
G.Barber 28 Oct Construction/Refurbishment Of The Tracker Prototype Contents:- Welcome Back Plans Layout Things to be addressed New Schematic.
Takashi Matsushita Imperial College T. Matsushita 1 Full tracker station assembly/QA, schedule.
J. Estrada - Fermilab1 AFEII in the test cryostat at DAB J. Estrada, C. Garcia, B. Hoeneisen, P. Rubinov First VLPC spectrum with the TriP chip Z measurement.
Takashi Matsushita Imperial College T. Matsushita 1 Station5 in UK.
Scintillating Fiber, Ribbon Production, Cryo Update Alan Bross MICE Tracker Meeting IC November 8, 2006.
MICE Tracker Readout Increased Data Readout Rate VLSB Development 16 AFE II t boards 8 Visible Light Photon Counter (VLPC) cassettes 4 cryostats.
1 MICE/AFE II t Update IIT Analog Front End (AFE) Test Stand AFE Conceptual Design Report (CDR) Terry Hart, Illinois Institute of Technology, February.
Fiber, Ribbon Production and Cryo Update Alan Bross Tracker Phone October 26, 2006.
MICE Tracker Update Alan Bross NFMCC Friday Meeting November 10, 2006.
MICE Tracker Readout and Data Acquisition; Solenoid Magnetic Field Measurement Terry Hart for the MICE Collaboration, Illinois Institute of Technology,
1M. Ellis - MICE Video Conference - 15th March 2007 Software Report  New G4MICE Users  TOF Simulation and Digitisation  SciFi Reconstruction  Tracker.
Takashi Matsushita Imperial College T. Matsushita 1 Tracker Status.
1 MICE Tracker Update M. Ellis UKNFIC Meeting 25 th August 2005.
1 SciFi Results and Comparison Malcolm Ellis, for the MICE Scintillating Fibre Group Abingdon, 31 st October 2003.
1 MICE Tracking Detectors Malcolm Ellis NFMCC Meeting 12 th March 2006.
G.Barber KEK Test Beam Update, Berkeley 9 Feb KEK Test Beam – Tracker Progress Contents:- Station Space Frame Light Guide Map Station Connectors.
Sci-Fi Tracker: Progress Report Malcolm Ellis, MICE Video Conference Wednesday 6 th October 2004.
Fiber Tracker Update Edward McKigney Imperial College July 3 rd, 2002.
Tracker Summary Alan Bross MICE CM October 10, 2007.
1 MICE Tracker Readout Update, Preparation for Cosmic Ray Tests Cosmic Ray Tests at RAL AFE-IIt Firmware Development VLSB Firmware Development Summary.
G. Barber Sci-Fi Tracker Progress Ral 28 Oct Progress On The Design Of The Full Tracker Contents:- Recap of New Station Layout Version 2.5 Version.
Cryo and AFE IIt Update Fiber Tracker Meeting April 6, 2006 Imperial College A. Bross.
Takashi Matsushita Imperial College T. Matsushita 1 MICE Status Excerpt from talks at MuTAC review:
1M. Ellis - NFMCC - 31st January 2007 MICE Tracker.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
January 31, MICE DAQ MICE and ISIS Introduction MICE Detector Front End Electronics Software and MICE DAQ Architecture MICE Triggers Status and Schedule.
1 KEK test-beam software progress Malcolm Ellis MICE Video Conference 4 th May 2005.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
M. Ellis - MICE Collaboration Meeting - Thursday 28th October Sci-Fi Tracker Performance Software Status –RF background simulation –Beam simulation.
1 MICE Tracker Readout Update AFE IIt firmware development VLSB firmware development Hardware progress Summary Terry Hart, MICE Tracker Meeting, August.
VLPC System Update A.Bross MICE CM Feb 9, Cryo  Production cryostats 1 and 2 ran smoothly at operating temperature  However, Cassette 109 in cryo.
G.Barber/Peter Cooke: Mechanical Design Update Imperial 22 July Mechanical Update for Tracker workshop Contents:- New Station Layout Light Guide.
G.Barber Mice Tracker Mechanical Progress Tracker Mechanical Progress Contents:- Station Space Frame Station Layout Light Guide Map Connectors Patch.
1 MICE Tracker Readout Update Introduction/Overview TriP-t hardware tests AFE IIt firmware development VLSB firmware development Hardware progress Summary.
T. Matsushita 1 Scintillating fibre tracker The scintillating fibre tracker reconstructs muon tracks before and after the MICE cooling section in 4 T magnetic.
Tracker Cosmic Ray Test 2011 Linda R. Coney UC Riverside CM 29 - February 16, 2011.
Detector Summary Tracker. Well, as far as the tracker hardware is concerned, we are done. – Need to do the system test to make sure nothing has degraded.
January 17, MICE Tracker Firmware Dead Time and Muon Detection Studies for the MICE Tracker Tracker Data Readout Basics Progress in Increasing Fraction.
Analysis for QA (temporary) Hideyuki Sakamoto 1 st October 2007 MICE Tracker Phone Meeting.
NUMI NUMI/MINOS Status J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting.
Tracker Readout Progress Terry Hart, MICE Tracker Meeting, July 29, 2008 Cosmic Ray Readout with 1 st Tracker at RAL 2 nd Tracker Preparation at FNAL Firmware.
G.Barber Mice Tracker Mechanical Ral June Tracker Mechanical Update Contents:- Station Space Frame Station Layout Connectors Patch Panel Still to.
Station Acceptance Test. 22/02/2007 M. Takahashi 2 Lab Layout at IC.
1M. Ellis - MICE Tracker PC - 1st October 2007 Station QA Analysis (G4MICE)  Looking at the same data as Hideyuki, but using G4MICE.  Have not yet had.
G.Barber: Summary of Mice Fibre Tracker Meeting FermiLab 8-12 March Developments during Tracker workshop Contents:- Revised Fibre Pitch Fibre Optic.
MICE VLPC Cryo Update Alan Bross MICE CM18 June 13, 2007.
Preparation for Station Acceptance Test
Muon Recording Studies and Progress for the MICE Tracker
Tracker Station QA Acceptance Test Rig Status
Presentation transcript:

Tracker Summary Alan Bross MICE CM17 CERN February 25, 2007

Scintillating fibre tracker  The scintillating fibre tracker reconstructs muon tracks before and after the MICE cooling section in 4 T magnetic field to measure the relative change in emmitance of the muon beam  The tracker consists of five planar scintillating-fibre stations  Each station is composed of three planes of scintillating fibres laid out with 120 degrees radial spacing  Each fibre plane is comprised of a ‘ doublet-layer ’ in which the fibres in the first layer of the doublet are interleaved with those in the second

Production Status  Fiber Mirroring Is COMPLETE  Mean R = 75% RMS=4%

Ribbons  Production Ribbons u COMPLETE u 48 “good” ribbons were produced s 16 stations wort

Fiber Stations  Build stations u Prepare carbon fibre station frames s All carbon fibre stations ready to be machined u Prepare 450 station connectors s 169 station connectors made so far  Construct trackers u Prepare assembly jig u Prepare framing tools

Station Production  Station five built u Will be Fermilab in a few weeks  Full production started on 15 Jan u Station six ready for cutting/polishing u Station seven underway s - view X/W bundled and connectorised; ready for gluing s - view V bundled

T. Matsushita 7 Station 5 Test with cosmic ray Polish with new diamond fly cutter Measure uniformity of height (z) of station

Station 5 Testing Proposal  Options were discussed at the recent tracker workshop.  Solution chosen is: u Waveguides and Station 5 will be shipped to Fermilab. u Cosmic ray test rig will be setup at Fermilab using D1 and D2 from KEK test (currently being tested with some PMTs from Imperial at RAL). u Once cassette will be used on whatever cryostat is available at the time at D0 to readout and the DAQ spreadsheet already used to start cassette charcaterisation will be used.  Once sufficient hardware exists for operating two parallel systems (including UK vs US power) one system will be sent to Imperial and will be used there (after Station 5 test).

Station Production Schedule  Will parallelize production line after the meeting u Help from FNAL starts mid March ETA of the first five stations: end of march

Lab Layout at IC

Source Scan Co57 (122keV photon, O(10 2 ) events) self-trigger on the front end board micro-positioning XY stages to excite 1 channel at a time (1.5 mm width) relative Light Yield for all channels + fibre uniformity check Cosmic Transportable light tight box (will be shipped for station 5 test at FNAL) External trigger using scintillation counters Absorber to filter out < 200MeV/c  extrapolate LY at MICE Test Methods counter0 cosmic box absorber counter1

G.Barber Mice Tracker Mechanical Progress Cern February 2007 Space Frame The components that are used to construct the space frame are nearly all at Imperial we are just a few pieces missing and Peter has a list of these. Even so we have enough to start production of the space frames. New Foot Design Gluing Fillet Design

G.Barber Mice Tracker Mechanical Progress Cern February 2007 Space Frame Tooling The jigs that align the space frames have been modified/re-designed. This will not only accommodate the new foot design but will also allow us to match the new station to station pitch. This work has been carried out by Peter Ford at RAL and he has also produced a set of production drawings.

G.Barber Mice Tracker Mechanical Progress Cern February 2007 Waveguides - Internal

Waveguides - External

Cryo  Production cryostats: u All parts in house s Except for Oxford controllers –Due Mid-March u First Production Cryostat Complete and under test s Uses cassettes 107 and 111 u Unfortunately there are some issues with Cryostat #1 s More in bit  We are having some “issues” with US vs. UK voltage u Cryostat lid heater control circuitry was not UK compatible u We now have the proper electronics in hand for all Production cryostats s #1 already fitted s Prototype cryostat will have to be retro-fitted before it is shipped to IC

 Production Cryostat #1

Production Cryostat #1 – Cooldown #2  Second Cooldown u Cassettes operating at 7.8K (no left-right asymmetry)  Still a little (  0.5K) warm (expected from Prototype performance u Temperature control/stability excellent 2mK rms

Production Cryostat #1 – Cooldown #2  However, we are currently operating with US Voltage u 60 Hz  In the UK we have to derate the system due to 50 Hz operation (from Sumitomo load curves) u At 50 Hz the cassettes will be running approximately 1K higher – 8.8K s This leaves very little margin s This is with a fresh Cold-Head s Would have expected from Prototype Cryo -  Options u Provide 60 Hz in MICE Hall s Expensive u Run hotter (9.5K) s Will characterize cassettes at both 9 and 9.5K to evaluate this option  We can certainly start at 50 Hz

AFE-IIt Boards for MICE D0 has all necessary boards for upgrade. We need about 1 or 2 new AFE-IIt boards per week for next couple months. –Michael Wojcik is performing these MICE-specific tests. –MICE requires 16 AFE-IIt boards + 9 spares.

Firmware Modification Overview for Increasing Data Rate Enable TriP-t pipeline to collect data during digitization. Reduce digitization time for channels below threshold (zero- suppression) –6 cycles for channels above threshold –1 cycle for channels below threshold Use TriP-t 4-level analog buffer to enable data collection during digitization. Much progress has been made in modifying the firmware to effect these changes, but Key Question: Will the AFE-IIt boards with the TriP-t chips work with these changes? Goal – 600 kHz muon collection rate with low dead-time

Where we were. (Digitization time ~ 5600 ns) Fraction of Recorded Muons Digitization Time (ns) No Buffering 1-level Buffering 2-level Buffering 3-level Buffering 4-level Buffering 600 kHz Muon Rate

No Buffering 1-level Buffering 2-level Buffering 3-level Buffering 4-level Buffering Where we are Fraction of Recorded Muons Digitization Time (ns) 600 kHz Muon Rate

Where we’d like to be Fraction of Recorded Muons Digitization Time (ns) No Buffering 1-level Buffering 2-level Buffering 3-level Buffering 4-level Buffering 600 kHz Muon Rate

KEK Test Beam - Track Reconstruction Assuming “ Uniform B-Field ” and “ NO scattering ” Chi2 to be minimized –Input: x i, y i (i=1,4) –Output: x 0, y 0, p 0, R, L –Degree of freedom: 8-5=3 x 0, y 0 00 #4 #3 #2 #1 R

Summary of Residual for Y Fitted_Mean MC DATA Fitted_Sigma 250MeV/c 325MeV/c 400MeV/c

Conclusions  First Tracker under Test in May/June  Second follows soon after  Ready for Beam in August  See you in Didcot u Don’t get Oprah Angry!

Results of T585 Stability of VLPC –There is no problems. Hit efficiency –This is the same as expected by MC. Tracking efficiency Pz resolution Pt distribution