Moving toward a Final Resource Adequacy Standard Resource Adequacy Forum Steering Committee Meeting September 27, 2007.

Slides:



Advertisements
Similar presentations
Out of Region Market Assumptions Resource Adequacy Technical Committee April 6 th, 2011.
Advertisements

Preliminary Resource Adequacy Assessment for the 2017 Pacific Northwest Power Supply NW Resource Adequacy Forum Technical Committee Meeting August 16 th.
Preliminary Impacts of Wind Power Integration in the Hydro-Qubec System.
Power Supply Adequacy Assessment Model/Methodology Review Steering Subcommittee Meeting January 29, 2010.
Preliminary Review of July 24 th Extreme Temperature Event & Implications for Pilot Capacity Standard Mary Johannis & Wally Gibson PNW Resource Adequacy.
Genesys Model Enhancements October 4, 2011 NW Resource Adequacy Steering Committee Meeting Gwendolyn S Shearer.
Ad Hoc West-wide Resource Assessment Team (WRAT) : Assessment of Western System Adequacy in the Short-term Jeff King Northwest Power Planning Council Presentation.
April Runoff Forecasts for the Columbia Basin and Power Supply Implications Jim Ruff and John Fazio Council Meeting April 14, 2010 Boise, ID.
ERCOT PUBLIC 4/21/ Loss of Load Probability Assessment for NERC April, 2015.
NW Resource Adequacy Forum Steering Committee Conference Call November 4, 2010.
Announced Coal Unit Retirements: Effect on Regional Resource Adequacy Council Meeting January 16, 2013 Portland, Oregon Boardman Centralia 1.
1 Planning Reserve Margin Dan Egolf Senior Manager, Power Supply & Planning.
A Resource Adequacy Standard for the Pacific Northwest Resource Adequacy Technical Committee January 17, 2008 Portland Airport.
Resource Adequacy Technical Committee Meeting April 6, 2011.
Developing an Adequacy Metric Resource Adequacy Forum Technical Subcommittee Meeting October 16, 2009.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 2009 Draft Resource Program Released: September 30, 2009 Accepting Comments until: November 30,
California Energy Commission Staff Paper - April 12,20071 Estimating the Generation Resource Mix of Electricity Imports to California – Energy Commission.
Power System Research, Inc. Review of the PNW Adequacy Standard Resource Adequacy Forum Technical Committee Meeting October 1, 2010.
Adequacy Assessment for the 2017 Pacific Northwest Power Supply Steering Committee Meeting October 26, 2012 Portland, Oregon 1.
Revising the Pacific Northwest Resource Adequacy Standard Resource Adequacy Technical Committee June 23, 2011.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Northwest Power and Conservation Council Generating.
Loss of Load Probability (LOLP) Project October 16, 2009 Resource Adequacy Technical Committee Meeting.
ERCOT Planning WMS 10/20/2010 Target Reserve Margin and Effective Load Carrying Capability of Installed Wind Capacity for the ERCOT System – Methodology.
Illustrative FCRPS Examples Comparing Capacity Adequacy Calculations for Federal Hydro- Dominated System Mary Johannis PNW Resource Adequacy Technical.
Comparison of LOLP Practices Mary Johannis PNW Resource Adequacy Technical Committee Mtg January 23, 2009.
Powered by the Loads and Resource Information System (LaRIS) Pacific Northwest Loads and Resources Operational Peaking Adjustment Council Briefing.
May 31, Resource Adequacy Capacity Standard Resource Adequacy Forum Technical Committee May 31, 2006 Background Image: Bennett, Christian Science.
June 27, Pacific Northwest Resource Adequacy Assessment for 2010 and 2012 Resource Adequacy Forum Steering Committee Meeting Northwest Power Pool.
Resource Adequacy Technical Committee Meeting April 6, 2011.
Evaluating Hydro Capacity for Capacity Adequacy Standard: Selection of Hydro Events Mary Johannis PNW Resource Adequacy Technical Committee Mtg November.
Resource Adequacy Steering Committee Meeting October 4, 2011.
Guidance for Utility Adequacy Assessments Steering Committee Meeting January 29, 2010.
Relationship of Regional Resource Adequacy Standards to Utility Planning PNW Resource Adequacy Steering Committee Meeting June 27, 2007.
Providing Resource Planning Guidance to Individual Utilities PNW Resource Adequacy Technical Committee Meeting June 20, 2007.
EFFECTIVE LOAD CARRYING CAPABILITY FOR WIND-POWER.
2009 Pacific Northwest Resource Adequacy Assessment Resource Adequacy Technical Committee October 16, 2009.
Wind Power Capacity Assessment Mary Johannis, BPA, representing Northwest Resource Adequacy Forum Northwest Wind Integration Forum Technical Working Group.
2010 Work Plan Steering Committee January 29, 2010.
Evaluation of Columbia River Sustained Hydro Peaking Capacity Eric King / Mary Johannis PNW Resource Adequacy Technical Committee Meeting May 31, 2006.
Providing Resource Planning Guidance to Individual Utilities PNW Resource Adequacy Steering Committee Meeting April 13, 2007.
Work Plan Resource Adequacy Forum Technical Committee July 29, 2009.
CALIFORNIA ENERGY COMMISSION Workshop on the Staff Draft 2006 Summer Outlook Report December 8, 2005 Hearing Room B.
Capacity Metric & Hydro Capacity Assessment Decisions Mary Johannis PNW Resource Adequacy Technical Committee Meeting June 20, 2007.
Resource Adequacy Assessment for 2015 Resource Adequacy Forum Technical Committee Meeting October 1, 2010.
Pacific Northwest Resource Adequacy Assessment for 2011 and 2013 Resource Adequacy Forum Steering Committee Meeting July 21, 2008.
Economic Adequacy Target Resource Adequacy Forum Steering Committee September 27, 2007.
Sustained Hydro Peaking Capacity Contract with Don Long Finalizing Phase II SOW Mary Johannis PNW Resource Adequacy Technical Committee Mtg January 23,
Probabilistic Approach to Resource Adequacy Resource Adequacy Forum Technical Committee Meeting Portland, OR January 23, 2009.
LOLEv Methodology Details GATF April 5, Calculation of the Target Reserve Margin in the LOLEv study The reserve margin is calculated by the following.
ISO Confidential Overview of California’s Current Drought and its Effects on the Energy System Dede Subakti, P. E. Director, Operations Engineering Services.
RFPEG2013 PRE-BID MEETING RFPEG2013 – Pre-Bid meeting January 9, 2014 Presentation by Derek Davis – Public Utilities Commission.
Defining LOLP Resource Adequacy Forum Technical Subcommittee Meeting November 14, 2008.
Steering Committee Meeting March 9, Why talk about assumptions? Garbage in, garbage out! “Let’s go dumpster diving!” Results sensitive to key.
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
Modeling the Hydroelectric System in GENESYS Resource Adequacy Forum Technical Committee Meeting July 25, 2007.
2010 Northwest Regional Forecast Resource Adequacy Technical Committee April 22, 2010.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Generating Resource Advisory Committee Meeting.
Power Supply Adequacy for the 2021 Operating Year Resource Adequacy Advisory Committee Steering Committee Webinar June 8, 2016.
Demand Response in the 7th Power Plan
Steering Committee Webinar March 25, 2016
Resource Adequacy Assessment for 2015 Interim Results Resource Adequacy Forum Technical Committee Meeting July 28, 2010.
GENESYS Current Functionality
Pacific Northwest Resource Adequacy Assessment
2021 Adequacy Assessment Status Report
Capacity Analysis in the Sixth Plan
Technical Committee Meeting March 18, 2016
Technical Committee Meeting March 18, 2016
Steering Committee Webinar March 25, 2016
Progress on Resource Adequacy Assessment for 2017
Resource Adequacy Steering Committee Meeting October 4, 2011
Presentation transcript:

Moving toward a Final Resource Adequacy Standard Resource Adequacy Forum Steering Committee Meeting September 27, 2007

September 27, Outline Review current standard Changes that will not alter the standard Changes that will alter the standard Future considerations for the Forum A look at curtailment events

September 27, PNW Resource Adequacy Standard Based on the assumption that the region will tolerate a 1-in-20 year likelihood of a significant curtailment due to lack of supply The underlying standard is a 5 percent loss-of- load-probability (LOLP) The LOLP standard is “translated” into an annual load/resource balance target to gauge the energy supply And into a peak period surplus reserve margin target to gauge the capacity supply

September 27, Metrics for the NW Standard The choice of metrics is almost arbitrary. The metric must show some relationship between resources and loads. The adequacy target for the metric is derived from a scenario with a 5-percent LOLP.

September 27, Metrics for the NW Standard The metric can be the annual, monthly or even hourly difference between loads and resources, calculated from the 5% LOLP scenario. It can be portrayed in terms of absolute megawatts or in terms of percent.

September 27, Metrics for the NW Standard The metric can include a line item for market supplies in the tally of resources, but it doesn’t have to. The load is usually based on normal weather, but it doesn’t have to be. It can be based on critical hydro, but it doesn’t have to be.

September 27, Caveat Whatever assumptions are used to define the metric must also be used when evaluating the status of the power supply. When one or more of the assumptions in the definition of the metric changes, the underlying standard does not change. Updating resource and load data or improving the simulation program does not change the standard. Under any of these cases, real life resource acquisition decisions will not be altered.

September 27, What can change the Standard? Any change in assumptions that alters the underlying 5 percent LOLP will change the standard. Examples include: The definition for a significant energy event. The definition for a significant capacity event. The months over which events are counted. Adding or subtracting random variables to the simulation. Directly changing the 5 percent target to something else.

September 27, Adequacy Forum’s Charge The Forum is charged with reevaluating the energy and capacity targets each year. As conditions change, the targets may change but the underlying standard remains intact. The Forum is also charged with reviewing the underlying 5 percent LOLP standard and altering it if appropriate. Altering the LOLP standard will change resource acquisition actions.

September 27, Future Considerations that may change the Standard The definition for a significant energy event. The definition for a significant capacity event. Consider using all months of the year. Consider calculating a single LOLP instead of a separate energy and capacity LOLP. Should only “bad” years be counted or should the LOLP be based on bad events? Review the 5 percent LOLP target.

September 27, Cold Hydro Limited GENESYS SimulationIllustrative Example Only

September 27, Curtailment Events (Peaking problems and energy shortages) Each event has a peak and duration.

September 27, Curtailment Events L/R Bal approximately -1,500 aMW This is a scenario that is just adequate for energy needs.

September 27, Curtailment Events L/R Bal approximately -2,000 aMW Or, 500 aMW higher load target

September 27, Additional Slides

September 27, Energy Metric Assumptions Averaged over all hours of the year Load is based on normal weather and includes net interregional firm contracts Resources include In-region spot market (uncommitted IPPs) Critical-year hydroelectric generation A 1500 MWa planning adjustment (derived from the LOLP analysis) accounting for out-of-region spot markets and non-firm hydro generation

September 27, Capacity Metric Assumptions Averaged over the peak load duration hours Load is based on normal weather and includes net interregional firm contracts Resources include In-region spot market (uncommitted IPPs) Critical-year hydroelectric generation A planning adjustment accounting for out-of-region spot markets and non-firm hydro generation

September 27, Resource Assumptions In-region spot market (uncommitted IPPs) Nov-May full IPP capability Jun-Oct 1,000 MW only Out-of-region spot market Nov-May 3,000 MW Jun-Oct 0 MW Non-firm hydro and hydro flex Nov-May 2,000 MW Jun-Oct 1,000 MW

September 27, Targets for the NW Standard Targets are set so that the resulting Loss-of- Load Probability (LOLP) is 5 percent Energy – zero, that is, annual average loads and resources should be in balance Capacity 25 percent for winter months 19 percent for summer months