Development of Fiducial Shots with LLD: Strike Point Control Improvement and Incorporation in Regular Operation Egemen “Ege” Kolemen, S. Gerhardt, D. Gates.

Slides:



Advertisements
Similar presentations
Potential Upgrades to the NBI System for NSTX-Upgrade SPG, TS NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U.
Advertisements

Exploiting 3-D Fields to Improve the Efficacy of ELM Pace Making with Vertical Jogs J. M. Canik, S.P. Gerhardt, J-W. Ahn Advanced Scenario and Control.
NSTX-U T&T TSG Contributions to FY15 JRT NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu Tokai U.
Langmuir Probe Peer Review Josh Kallman for the LLD Team February 13, 2009 NSTX Supported by College W&M Colorado Sch Mines Columbia U Comp-X General Atomics.
Development and characterization of intermediate- δ discharge with lithium coatings XP-919 Josh Kallman Final XP Review June 5, 2009 NSTX Supported by.
Vertical Stability for NSTX and NSTX-U Egemen Kolemen D. A. Gates, S. Gerhardt Monday Physics Meeting PPPL, NJ Nov/15/2010 NSTX Supported by College W&M.
NSTX NSTX Team Meeting Jan. 3, 2013 NSTX Team Meeting Jan. 3, 2013 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu.
NSTX Team Meeting May 28, 2008 Supported by Office of Science College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL.
Edge Stability of Small-ELM Regimes in NSTX Aaron Sontag J. Canik, R. Maingi, R. Bell, S. Gerhardt, S. Kubota, B. LeBlanc, J. Manickam, T. Osborne, P.
Relay Feedback and X-point Height Control Egemen Kolemen S. Gerhardt and D. A. Gates 2010 Results Review Nov/30/2010 NSTX Supported by College W&M Colorado.
PCS Navigation D. Mueller January 26-28, 2010 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu Tokai U NIFS.
ISTP (and other…) Update Stefan Gerhardt NSTX-U Monday Physics Meeting Feb. 20, 2015 B318 NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima.
Non-axisymmetric Control Coil Upgrade and related ideas NSTX Supported by V1.0 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U.
Current status of high k scattering system J. Kim 1, Y. Ren 2, K-C. Lee 3 and R. Kaita 2 1) POSTECH 2) PPPL 3) UC Davis NSTX Monday Physics Meeting LSB-318,
1 Update on Run Schedule R. Raman NSTX Team Meeting PPPL, Princeton, NJ, 08 February, 2006 Work supported by DOE contract numbers DE-FG02-99ER54519 AM08,
RF Operations: Commissioning the RF systems and antenna conditioning J. Hosea et al. NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima.
Supported by Office of Science Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu Tokai U NIFS Niigata U U.
Simple As Possible Plasmas (SAPP) on NSTX Adam McLean, ORNL Boundary TSG Session NSTX Research Forum Dec. 2, 2009 NSTX Supported by College W&M Colorado.
NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu Tokai U NIFS Niigata U U Tokyo JAEA Hebrew.
Radiative divertor with impurity seeding in NSTX V. A. Soukhanovskii (LLNL) Acknowledgements: NSTX Team NSTX Results Review Princeton, NJ Wednesday, 1.
NSTX Team Meeting July 21,, 2011 NSTX TF Update NSTX Team Meeting July 21, 2011 NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima.
NSTX Effects of NTSX Upgrades on DiagnosticsFebruary 8, NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL Johns.
Second Switching Power Amplifier (SPA) Upgrade Physics Considerations Discussion S.A. Sabbagh 1, and the NSTX Research Team 1 Department of Applied Physics,
ASC Five Year Plan Chapter Status Stefan Gerhardt NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu.
XP817: Transient CHI – Solenoid free Plasma Startup and Coupling to Induction Office of Science R. Raman, B.A. Nelson, D. Mueller, T.R. Jarboe, M.G. Bell.
1 R Raman, B.A. Nelson, D. Mueller 1, T.R. Jarboe, M.G. Bell 1, J. Menard 1, R. Maqueda 2 et al. University of Washington, Seattle 1 Princeton Plasma Physics.
Xp705: Multimode ion transport: TAE avalanches E D Fredrickson, N A Crocker, N N Gorelenkov, W W Heidbrink, S Kubota, F M Levinton, H Yuh, R E Bell NSTX.
0. System ID with relay 1. Strike point for high elongation –Add upper strike control –Coordinate with squareness 2. X-point with strike MIMO (add off.
XP 1058: Impact of Outer Squareness on High-kappa Discharge Performance Egemen “Ege” Kolemen, S. Gerhardt, D. Gates 2010 NSTX XP Review Room B-318 July.
NSTX FY2007 Physics Results 1 Strike Point Control Dynamics Supported by Office of Science College W&M Colorado Sch Mines Columbia U Comp-X General Atomics.
Development of Improved Vertical Position Control S.P. Gerhardt, E. Kolemen ASC Session, NSTX 2011/12 Research Forum Location Date NSTX Supported by College.
1 Roger Raman for the NSTX Research Team University of Washington, Seattle NSTX Run Usage 27 February – 5 May, 2006 NSTX Mid-Run Assessment PPPL, Princeton,
NSTX Upgrade Project – Final Design Review June , NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL.
NSTX-U Collaboration Status and Plans for: X Science LLC Ricky Maqueda NSTX-U Collaborator Research Plan Meetings PPPL – LSB B318 April / May 2014 NSTX-U.
Energy Confinement Scaling in the Low Aspect Ratio National Spherical Torus Experiment (NSTX) S. M. Kaye, M.G. Bell, R.E. Bell, E.D. Fredrickson, B.P.
Some Halo Current Measurements in 2009 S.P. Gerhardt Thanks to: E. Fredrickson, H. Takahashi, L. Guttadora NSTX Results Review, 2009 NSTX Supported by.
Characterization of the LLD with a two-color infrared camera Adam McLean, ORNL J.-W. Ahn, T. Grey, R. Maingi Lithium TSG Session NSTX Research Forum Dec.
NSTX Team Meeting February 7, 2007 Supported by Office of Science College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U.
Supported by Office of Science NSTX H. Yuh (Nova Photonics) and the NSTX Group, PPPL Presented by S. Kaye 4 th T&C ITPA Meeting Culham Lab, UK March.
Development and characterization of intermediate- δ discharge with lithium coatings XP-919 Josh Kallman XP Review - ASC Feb 2, 2009 NSTX Supported by College.
NSTX Team Meeting December 21, 2009 College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL LLNL Lodestar MIT Nova Photonics.
Enhancement of edge stability with lithium wall coatings in NSTX Rajesh Maingi, Oak Ridge National Lab R.E. Bell, B.P. LeBlanc, R. Kaita, H.W. Kugel, J.
Effect of 3-D fields on edge power/particle fluxes between and during ELMs (XP1026) A. Loarte, J-W. Ahn, J. M. Canik, R. Maingi, and J.-K. Park and the.
NSTX-Upgrade Magnetics And Related Diagnostics SPG NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu.
First results of fast IR camera diagnostic J-W. Ahn and R. Maingi ORNL NSTX Monday Physics Meeting LSB-318, PPPL June 22, 2009 NSTX Supported by College.
NSTX NSTX TF, PF and umbrella Upgrade Internal ReviewFeb 24, NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL.
NSTX NSTX LidsJuly 6, NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL Johns Hopkins U LANL LLNL Lodestar.
NSTX Team Meeting June 30, 2009 College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL LLNL Lodestar MIT Nova Photonics.
Supported by Office of Science NSTX S.M. Kaye, PPPL ITPA PPPL 5-7 Oct Confinement and Transport in NSTX: Lithiumized vs non-Lithiumized Plasmas Culham.
NSTX-U Disruption PAM Working Group – Controlled Shutdown XP Discussion S. A. Sabbagh and R. Raman Department of Applied Physics, Columbia University,
Planning for Toroidal Lithium Divertor Target for NSTX and Supporting Experiments on CDX-U/LTX R. Kaita Boundary Physics Science Focus Group Meeting July.
Upgrades to PCS Hardware (Incomplete) KE, DAG, SPG, EK, DM, PS NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo.
NSTX 2007 MHD XP Review – J. Menard 1 Optimization of RFA detection algorithms during dynamic error field correction Presented by: J.E. Menard, PPPL Final.
Presently Planned Vacuum-Side Diagnostics for the NSTX-Upgrade Center Column NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima.
XP-945: ELM Pacing via Vertical Position Jogs S.P. Gerhardt, J.M. Canik, D. Gates, R. Goldston, R. Hawryluk, R. Maingi, J. Menard, S. Sabbagh, A. Sontag.
Preliminary Results from XP1020 RFA Measurements J.W. Berkery Department of Applied Physics, Columbia University, New York, NY, USA NSTX Monday Physics.
XMP-65 Optimization of  -Control XP-1019: Test of  -Control for Disruptivity Reduction S.P. Gerhardt, E. Kolemen, D. A. Gates, S. A. Sabbagh Macrostability.
V. A. Soukhanovskii, XP1002 Review, 9 June 2010, Princeton, NJ 1 of 9 XP 1002: Core impurity density and P rad reduction using divertor condition modifications.
NSTX NSTX Team Meeting –Masa Ono August 15, 2014 NSTX-U Team Meeting August 15, 2014 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo.
Advanced Scenario Development on NSTX D. A. Gates, PPPL For the NSTX Research Team 50th APS-DPP meeting Dallas, TX November 17, 2008 College W&M Colorado.
NSTX-U Collaboration Status and Plans for: M.I.T. Plasma Science and Fusion Center Abhay K. Ram, Paul Bonoli, and John Wright NSTX-U Collaborator Research.
1 Status of the 2008 ASC TSG Run plan Presented by D. A. Gates (J. Menard Deputy) At the NSTX Mid-run asessment PPPL April 16, 2008 Supported by Office.
1 Roger Raman for the NSTX Research Team University of Washington, Seattle Update on the NSTX Run Plan PPPL, Princeton, NJ, 15 May, 2006 Supported by Office.
Monitoring impact of the LLD Adam McLean, ORNL T. Gray, R. Maingi Lithium, TSG group preliminary research forum PPPL, B252 Nov. 23, 2009 NSTX Supported.
Comments on HC Measurements for NSTX- Upgrade SPG CS Upgrade Meeting 11/2/11 NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima.
Supported by Office of Science NSTX K. Tritz, S. Kaye PPPL 2009 NSTX Research Forum PPPL, Princeton University Dec. 8-10, 2008 Transport and Turbulence.
Neutron diagnostic calibration transfer XMP D. Darrow and the NSTX Research Team XMP & XP review meeting Control Room Annex June 11, 2015 NSTX-U Supported.
Profiles Variations in NSTX-U and their Potential Impact on Equilibrium and Stability Magnetoboss 12/6/2013 NSTX-U Supported by Culham Sci Ctr York U Chubu.
XP-950: XP-950: Dependence of metallic impurity accumulation on I p and the outer gap in the presence of lithium deposition S. Paul, S. P. Gerhardt are.
NSTX NSTX Upgrade Project – Final Design ReviewJune 22-24, NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL.
Presentation transcript:

Development of Fiducial Shots with LLD: Strike Point Control Improvement and Incorporation in Regular Operation Egemen “Ege” Kolemen, S. Gerhardt, D. Gates 2009 NSTX XP Review, ASC Room B-318 January 5 th, 2009 College W&M Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL LLNL Lodestar MIT Nova Photonics New York U Old Dominion U ORNL PPPL PSI Princeton U Purdue U SNL Think Tank, Inc. UC Davis UC Irvine UCLA UCSD U Colorado U Maryland U Rochester U Washington U Wisconsin Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu Tokai U NIFS Niigata U U Tokyo JAEA Hebrew U Ioffe Inst RRC Kurchatov Inst TRINITI KBSI KAIST POSTECH ASIPP ENEA, Frascati CEA, Cadarache IPP, Jülich IPP, Garching ASCR, Czech Rep U Quebec NSTX Supported by

This year NSTX will need a new fiducial shot development due to the new restrictions and requirements due to LLD installation. We can’t let the strike point hit the LLD (at least not routinely) Medium δ shots may be part of regular XPs. Strike point controllers are operational but they are still not part of the regular run. –We need to improve and prove that the controller works robustly Need for Developing a New Fiducial with LLD

Long term aim: –Use all the PF coils to control the plasma shape together. –Very hard to implement at once. –Incrementally increase the control capability to reach aim Full Multiple-Input-Multiple-Output Control -Inner Gap -Lower Inner Strike Point -Vertical Position -Squareness Upper X-point Height … -Inner Gap -Lower Inner Strike Point -Vertical Position -Squareness Upper X-point Height …

Current System ID System Id: Identify the effect of these coils on the boundary shape. Last year: Reaction Curve Method Results from last year: Problem: –Many shots needed –Not precise PP KpKp KiKi KdKd P  P/  C p )  (T/L) -- PI    P/  C p )  (T/L)  P/  C p )  (3.3  T/L 2 ) - PID    P/  C p )  (T/L)  P/  C p )  (2  T/L 2 )  P/  C p )  (T/2)

Inner Strike Point Control on the Vertical Divertor via a PI controller with PF2L PI tuned to [5000, 5000] for inner strike point. RMS ~ 1cm (Has offset need higher I) PF2L controls outer SP in red segments. PF1AL controls inner SP in the blue segment. Current Capability: Inner Strike Point Control PF2L PF1AL

Outer Strike Point Control on the Inner Divertor via a PI controller with PF2L PI controller gains are tuned using Ziegler and Nichols to [400, 800]. RMS ~ 1.5 cm (Kappa ~ ) PF2L controls outer SP in red segments. Current Capability: Outer Strike Point on the Inner Divertor PF2L PF1AL

Outer Strike Point Control on the Outer Divertor via a PI controller with PF2L PI controller gains are tuned using Ziegler and Nichols to [400, 800]. RMS ~ 2 cm (Has offset need higher I) PF2L controls outer SP in red segments. PF1AL controls inner SP in the blue segment. Current Capability: Outer Strike Point on the Outer Divertor PF2L PF1AL

1.Is bull-nose tile addition a problem for OSP? »Not a big problem. PCS uses a linear segment to find the SP, we can’t make it a curved surface. Maybe the line segment can be modified but not really that important. SP control tries to match flux on two points, if the reference is moved down. 2.Present status of OSP control on the inner divertor. Do we have a shot? Do we need more work? –We have a shot, need to add D gain to stabilize. 3.Transient control compared to control during the Ip flat top. »This is the main problem. Strike point moves all around. Plasma touches the bottom of the vessel. With sprayed lithium on the inner divertor, this may be a problem. 1.Implement X-point height control. 2.Adding D to SP controller. 3.Upper strike point controllers Problems That Needs to be Addressed before LLD Commissioning

This Year: Offline System ID (Subspace Numerical Method) This year Offline System ID (via Subspace Numerical Method): Find minimal-state realization by converting to a form where error matrix (w k and v k ) is minized We parameterize the matrices by A(θ) and B(θ), then solve NLP: Best known method: L. Ljung: ARMAX input-output models used in Maximum Likelihood. IMPORTANT: System Delays are not included in this formalism. –Include that as additional parameters in the optimization.

Offline System ID (via Subspace Numerical Method) Requirements: –Need an equilibrium –Need variation of the control input (PF1/2…). Thus a working controller (can be a very poor one) is needed. Then clean up the response –Find the portion of the response that depends mostly on the control –Take out trend lines, biases… Use Subspace Algorithm with delays to find system. Pros: –Don’t need XP run time! –Great for improving a already existing controller. Cons: –Precision may not be perfect. –Need a running controller

This Year: Offline System ID This year Offline System ID (via Subspace Numerical Method): Example: System Id for PF2L to OSP compared to XP data. Enables better initial guess within a factor of 2 Need a working controller for best results. Guesses Obtained: –I for PF3 –D for SP (PF1/PF2) –Off-diagonal terms for PF1/PF2 to ISP/OSP controller. –Initial guess for X-point controller harder (no working controller) When we reach this closed-loop plant response pattern the oscillation period (P u ) and the amplitude (A) of the plant response can be measured and used for PID controller tuning. where Only a single experiment is needed. Closed loop: More stable K= 2.4e-6, T = 9.9 and L = 6.0 K =3.5e-6, T=10, and L =7 tauD_method2 = –Relay Feedback is almost implemented on PCS. Note that shot used for system ID is not in this list

We propose a 1 day XP: 1.Load shot and see if the shot is still the same and SP controllers are working (2 shots) 2.Improve control: We will be adding derivative gain and tuning the controllers for better performance (XMP): –Add D to PF2 for strike point control – Reduce RMS < 1 cm (3 shots) Relay Feedback System ID –Multi-Input Multi-Output: PF1A/PF2 to ISP/OSP (3 shots) [May not work] –Add I to PF3 – Need to get rid of Bias Error (~1 cm) (3 shots) –Test Integral Fix (1 shot) 3.Add upper strike point controllers: Currently, the strike point controllers work only for the lower side, we will implement the upper strike point controller in PCS. (4 shots) 4.Scan the strike-point from cm. (5 shots) 5.Improve transient phase: Study and tune the start phase to avoid the plasma touching the lower plasma boundary. (6 shots) Experimental Plan for the New Fiducial

Study and tune the start phase to avoid the plasma touching the lower plasma boundary. 1.Implement the X-point height controller 2.After the Integrator start fix, try to start the controller later (i.e during flat top). Set the PF1/PF2 to constant values for the ramp up. 3.Tweak the squareness and Drsep. 4.Change upper strike point locations 5.Other ideas? Other Ways to Improve Transient Phase?

Backup Slides