YETS COMPLEX PS 2015/2016 Travaux EN/EL/CF P. LELONG, J-M. LASSAUCE & G. GEORGIEV 12 Novembre 2015
Agenda 1. Copper cabling Booster 2. Copper cabling PS 3. Optical fibres Booster & PS 4. Support needed 5. Conclusion 12/11/2015
1. Copper cabling Booster 1/3 12/11/2015G. Georgiev AffaireLOCALISATIONTitleGroupUserNb. cablesLength (m) C213AFZ302001BAT361 - BAT354CONDITIONS EXTERNES BOOSTER PSBEX-YEA1BE-BISAID C213AFZ303001BAT361 - BAT193RÉNOVATION Z30 PSBEX-YEA1GS-ASERAFFOURT C213AFZ304001BAT361CABLAGE EPC DIPOLES PSBEX-YEA1TE-EPCPITTET32332 C213AFZ933001BAT361 - BAT354CABLAGE BE-CO POUR SIMPL DE RESEAU PSBEX-YEA1BE-BISAID C213AFZ305001BAT361WIC DIPOLES PSBEX-YEA1TE-MPEMOMPO8120 C213AFZ306001BAT361CONN STIRRERS TO DIPOLES PSBEX-YEA1TE-EPCPITTET16 TOTAL Campaign PSBEX-YEA1 No possibilities to execute additional requests
1. Copper cabling Booster 2/3 12/11/2015G. Georgiev Campaign PSBEX-YEA1 anticipation – work before YETS Fireproof closures will be open
1. Copper cabling Booster 3/3 12/11/2015G. Georgiev Campaign PSBEX-YEA1 during YETS Work in shifts needed – cabling / de-cabling project
2. Copper cabling PS 1/8 12/11/2015P. Lelong Campaign PSREX-YEA1 AffaireLOCALISATIONTitleGroupUserNb. cablesLength (m) FZ100001BAT150-BAT151CABLAGE REMOTE RESETBE-RFLANDRE2350 FZ102001BAT150-BAT151CABLAGE REMOTE RESETBE-RFTOTOS51250 FZ123001BAT151CABLAGE REMOTE RESETBE-RFTOTOS18335 FZ138001BAT368CABLAGE OASIS BLMBE-COSAID FZ CABLAGE DI RENOVATION Z29GS-ASERAFFOURT FZ143001BAT 355LIU-PS / PS-QDN-QFN (ETHERNET)TE-EPCGOMEZ COSTA44494 FZ144001BAT 355LIU-PS / PS-QDN-QFN (DC CABLING)TE-EPCPITTET42840 FZ148001BAT 150CABLAGE MAGNET INTERLOCK LEIRTE-MPEMOMPO4140 FZ156001BAT359 - BAT151CABLAGE MTGBE-COSAID1250 FZ161001BAT 151REPRISE CABLES EXISTANTSTE-EPCDE MALLAC450 FZ167001BAT 355LIU - ALIM APOLO_2STE-EPCREIGNIER280 FZ169001BAT 365CABLAGE ETHERNETTE-EPCGOMEZ COSTA130 FZ170001BAT 355CABLAGE ETHERNET APOLOTE-EPCGOMEZ COSTA140 FZ MULTICABLAGE BE-CO SIMPLIF. RESEAUBE-COSAID92115 FZ172001BAT BAT 250LEIR / CTRL CONVERTISSEURSBE-COCATIN382 FZ173001BT 355MAG.INTERLOCKS QFN / QDNTE-MPEMOMPO9880 FZ175001BAT 355CABLAGE 1553BE-COSAID150 Total No possibilities to execute additional requests
2. Copper cabling PS 2/8 12/11/2015P. Lelong Campaign PSREX-YEA1 QFN/QDN: -FZ143 -FZ144 -FZ173 -FZ175 APOLO: -FZ167 -FZ170 REMOTE-RESET: -FZ100 -FZ102 -FZ123 OASIS BLM: -FZ138 RENOV DI Z29: -FZ141 INTERL LEIR: -FZ148 MTG: -FZ156 CTRL CONV: -FZ172 Reprise 4 câbles: -FZ161 CABLAGE BE-CO: -FZ939 (Bat )
2. Copper cabling PS 3/8 12/11/2015P. Lelong Campaign PSRIN-YEA1 No possibilities to execute additional requests AffaireLOCALISATIONTitleGroupUserNb. cablesLength (m) FZ146001BAT ? - PS (SS82)CABLAGE BGIBE-BISTOREY FZ147001BAT PSCABLAGE CAVITY PS 20/40/80/200MHZBE-RFHAASE FZ148002BAT PSCABLAGE MAGNET INTERLOCK LEIRTE-MPEMOMPO4400 FZ150001LINAC3 - PSCABLAGE WICTE-MPEDAHLEN FZ159001BAT157 - PSCONSOLIDATION BTV HALL ESTBE-BIBURGER4340 FZ160001BAT PSREMPLACEMENT CABLES JAUGESTE-VSCDE LA GAMA61100 FZ162001BAT PS (SS90)CABLAGE PICKUP SS90BE-BIBELLEMAN51000 FZ180001BAT BAT 352ECR - PS-YEC EDMS GS-ASENININ21000 FZ168001BAT359 - PSCABLES ANTENNEIT-CSCHAPRON5500 FZ174001BAT BAT 151FINEMET - 1ER TEST 12 CABLES MCA36BE-RFHAASE120 FZ179001BAT BAT 151FINEMET - 2EME TEST 12 CABLES MCA36BE-RFHAASE120 Total
2. Copper cabling PS 4/8 12/11/2015P. Lelong Campaign PSRIN-YEA1 Interl. LEIR: -FZ148 WIC Linac3: -FZ150 BTV Hall Est: -FZ159 Porte Secteur Bat352: -FZ180 Jauges (9/17/18/32): -FZ160 Pickup SS90: -FZ162 GSM: -FZ168 BGI (SS82): -FZ146 Attente infos! Tests câble Finemet: -FZ174 -FZ179 Cavités RF: -FZ147
2. Copper cabling PS 5/8 12/11/2015P. Lelong Campaign PSRIN-YEB1 (if possible) This campaign could be started but not surely completed! AffaireLOCALISATIONTitleGroupUserNb. cablesLength (m) FZ177001BAT PSCABLAGE BLM (PS-BLO)BE-BIZAMANTZAS Câbles BLM: -SD14 à SD18 Câbles BLM: -SD40 à SD49 Câbles BLM: -SD71 à SD83
2. Copper cabling PS 6/8 12/11/2015P. Lelong Campaign ADEX-YEA1 (From AD to TT2) AffaireLOCALISATIONTitleGroupUserNb. cablesLength (m) FZ104001BAT 193 – TT2CABLAGE TRANSFO TFA9012BE-BILENARDON2540 Plateforme de racks AD Transfo TFA9012
2. Copper cabling PS 7/8 12/11/2015P. Lelong Campaign TOFIN-YEA1 (Tunnel NTOF + EAR2) Rack DI Bris de glace et Sirènes Câblage local: - FZ171 FZ140 Affaire LOCALISATIONTitleGroupUserNb. cablesLength (m) FZ BAT TT2ACABLAGE BIWGS-ASERAFFOURT8920 FZ BAT 380CABLAGE ALARM DOOREN-STILENDARO8250 TOTAL161170
2. Copper cabling PS 8/8 12/11/2015P. Lelong Other campaign for PS complex AffaireCampagneLOCALISATIONTitleGroupUserNb. cablesLength (m) FZ152001EXEIN-YEA1BAT BAT 2009CABLAGE DI (RENOVATION Z24)GS-ASERAFFOURT81800 FZ153001CTFIN-YEA1 BAT BAT 2002CABLAGE DI (RENOVATION Z27)GS-ASERAFFOURT4480 FZ159002EXEIN-YEA1BAT157CONSOLIDATION BTV HALL ESTBE-BIBURGER190 FZ150002LI3IN-YEA1LINAC3CABLAGE WICTE-MPEDAHLEN TOTAL Summary CampagneNb. cablesLength (m) PSREX-YEA PSRIN-YEA ADEX-YEA12540 TOFIN-YEA OTHERS TOTAL Km of cable for PS complex YETS activity, Excluding BLM campaign (PSRIN-YEB1 – 17.5km) !
ActivitésLocalisationContraintesDurée - Travaux bâtiments de surface - Installation Infrastructure tube, pour futures liaisonsSurface (354, 359, 353)Ouverture faux planchers2 jours - Installation d'une liaison entre Bldg 354 et 368 (5 fibres)Surface (354, 359, 368)Ouverture faux planchers2 jours - Installation liaison Trigger Oasis CBAOS7Surface (354, 361)Ouverture faux planchers2 jours - Travaux sous-sol - Installation tubes et liaisons entre le 151-R-005 et 5 différentes positions autour PS-Ring 151-R05, PS-RINGOuverture caniveau, visite préparatoire5 jours - Installation d'un tube et 12 SM Rad-Hard fibres368, SS82(PS-Ring)Ouverture caniveau, visite préparatoire2 jours - Visites techniques - Visites locaux techniques IT Tous bâtiments de surface aucunen/a - Déplacement d'un Rack au Ouverture faux planchersn/a - Etude cheminements pour Beam Wire Scanner PSBPSBaucunen/a 3. Optical fibres Booster & PS 1/1 J-M. Lassauce
4. Support needed DGS/RP Work Dose Planning (only PS) EN/MEF Detail schedule VIC Scaffolding if needed, … EN/HE Drums transport and handling Opening cables trenches 12/11/2015
5. Conclusion 12/11/2015 Work in shifts needed – cabling / de-cabling project (PSB). Extended working hours for PS. Missing information for BGI (needed ASAP). Many fireproof closure will be open (PSB). Many other groups will be involved in our interventions. No possibilities to execute additional requests
Thank you for your attention!