YETS COMPLEX PS 2015/2016 Travaux EN/EL/CF P. LELONG, J-M. LASSAUCE & G. GEORGIEV 12 Novembre 2015.

Slides:



Advertisements
Similar presentations
XB YETS PS-TT2 Indico EDMS
Advertisements

BI Outlook for BI Day 2012 Based on latest (last Monday) feedback from EN/EL XXX As foreseen originally Partially ‘As foreseen originally‘ Postponed.
LIU CABLING & OPTICAL FIBRES STRATEGY Georgi Minchev Georgiev EN-EL-CF.
TDC2/TCC2 consolidation EATM 15/07/2014. EN/EL – DC and control cable identification and cut completed – Old light removal in TDC2 – New AUG installed.
EN-EL Organisation and Needs for LIU project Mar 4, 2015 Daniel RICCI, Jerome PIERLOT Section Leaders Cabling and Low Voltage, on behalf of the EN-EL group.
Session 8 - Long Shutdown 2 Strategy and Preparation LIU Planned Activities Reference : RLIUP Oct.2013 (indico) “Work Effort in the LHC Injector Complex,
The new MEF Group S. Baird 12 th December The new MEF Group Mandate for the MEF Group MEF structure Support for LHC experiments Formal meetings/committees.
Injector De-cabling Project Project Team Meeting #
Injector De-cabling Project Enlarged meeting # S. EVRARD, EN-MEF, on behalf of the Injector De-cabling Project Team.
LIU-IONS Linac3 meeting LIU Project – Planning and Installation Julie Coupard EN/MEF-OSS.
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
Injector De-cabling Project Enlarged meeting # E. HARROUCH, EN-MEF, on behalf of the Injector De-cabling Project Team.
MEF - Machines & Experimental Facilities Linac4 project EN/MEF roles & responsibilities EN/MEF group meeting October J.Coupard1.
Injector De-cabling Project Enlarged project meeting # S. EVRARD, EN-MEF, on behalf of the Injector De-cabling Project Team.
TE-EPC Activities during LS2 V. Montabonnet on behalf of TE-EPC group.
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
How to keep the Injectors running for another 25 years S Baird (on behalf of EN/MEF/ABA) LHC Performance workshop Chamonix January 2010.
K.Hanke – PS/SPS Days – 19/01/06 K.Hanke - PS/SPS Days 19/01/06 Recommissioning Linac2/PSB/ISOLDE from CCC  remote operation from CCC  upgrades & changes.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
YETS PS&TT2 list of works planned and planning Simon Mataguez EN/MEF-OSS More info about the PS machine? Many thanks.
2. Linac Systems 3. Booster Systems 4. Installation commiss. 5. Building, Infrastruct. 2.1 Ion Source and LEBT, R. Scrivens, BE/ABP 2.2 Radio Frequency.
Planning of Injector Activities for Linac4-to-PSB Connection and LS2 Thanks to all the valuable input from the LIU project leaders and LIU work- package.
Injector De-cabling Project Project meeting # 7, S. EVRARD, EN-MEF, on behalf of the Injector De-cabling Project Team.
EN-EL Activities for LS2 LIU, Consolidation, Maintenance, Operation Nicolas Bellegarde on behalf of EN-EL.
Each converter 3 racks (fighting for 2?) Access from front and rear of each rack! 56 racks total + 6 racks Ethernet/control Existing RF equipment to be.
LIU-PSB Working Group meeting: 25/06/2015, Markus Zerlauth Consolidation of magnet interlocks in the PS complex – Warm magnet Interlock System (WIC) R.Mompo,
LIU–PLI report LIU Project Team meeting. Follow-up on the Engineering Change Requests Engineering Change Requests for the YETS PSB PS.
Electrical Group Inputs for LIU-Ions J. Devine, on behalf of EN/EL.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
PSB and PS test systems status. M. Haase September 14 th Finemet Review.
Linac4-PSB 160 MeV connection readiness review
SPS LS1 Planning meeting (N019) 04/09/13
Controls & software Andy Butterworth.
BE-CO Activities for LIU-CPS and LIU-SPS
YETS & LS2 Reminder P. Lelong / G. Georgiev / JM Lassausse
BE-BI Activities and Status: LHC and Injectors
LIU & MME ACTIVITIES Fabrication Alessandro DALLOCCHIO on behalf of the EN-MME Workshop LIU & MME ACTIVITIES – Fabrication A. Dallocchio.
EYETS David Hay EN-OSS.
ELENA installation and commissioning status
LIU Wire Scanner Milestones June 2017
EYETS LHC 2016/2017 Works EN/EL/CF
Activités SPS pour BE/ICS Systèmes d’Alarmes YETS
LIU – EVM status and next steps
EYETS16-17 ACTIVITIES EN-EL-CF
Planning and Installation
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
De-cabling strategy during YETS
prepared by R.A.Barlow 30/056/2016
PS Booster Hardware Tests & Cold Check-out planning 16th of March 2017
TE/EPC activities for YETS & LS2 LINAC 2-3, PSB, PS & TT2
TE/EPC activities for LINAC 2, PSB, PS & TT2 during EYETS
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
SPS Planning for the EYETS Meeting 8 (07/12/2016)
SPS Planning for the EYETS Meeting 9 (14/12/2016)
Update on the Ethernet Network Installation Campaign
Summary of ECRs for the YETS Booster, PS, ISOLDE and associated transfer lines (LIU + Consolidation) T. Birtwistle (EN-MEF-DC)
Short LHC-TS week 38 Confirmed by LMC on 16th August
GIS PORTAL RACKS Integration of Equipment Racks in the Geographic Information Service (SMB/SE) Olivier Barrière.
EN-CV interventions during EYETS for PS and PSB
YETS PS + PS SWY + TT2 Facility Coordinator:
EN-HE L2 – PS – PSB – TT2 works during YETS
BE-CO Activities for PSB
Georgi Minchev Georgiev EN-EL-FC
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
PS Booster Report from: David HAY, Cyrille BEDEL 12-Jan-2018
Vers PS YETS PS Booster David HAY & Cyrille BEDEL.
ABP/RTL Main RTL Activities for 2007/8:-
East Hall under construction
LIU EL-FC ACTIVITIES Updated on 28/11/2017
Presentation transcript:

YETS COMPLEX PS 2015/2016 Travaux EN/EL/CF P. LELONG, J-M. LASSAUCE & G. GEORGIEV 12 Novembre 2015

Agenda 1. Copper cabling Booster 2. Copper cabling PS 3. Optical fibres Booster & PS 4. Support needed 5. Conclusion 12/11/2015

1. Copper cabling Booster 1/3 12/11/2015G. Georgiev AffaireLOCALISATIONTitleGroupUserNb. cablesLength (m) C213AFZ302001BAT361 - BAT354CONDITIONS EXTERNES BOOSTER PSBEX-YEA1BE-BISAID C213AFZ303001BAT361 - BAT193RÉNOVATION Z30 PSBEX-YEA1GS-ASERAFFOURT C213AFZ304001BAT361CABLAGE EPC DIPOLES PSBEX-YEA1TE-EPCPITTET32332 C213AFZ933001BAT361 - BAT354CABLAGE BE-CO POUR SIMPL DE RESEAU PSBEX-YEA1BE-BISAID C213AFZ305001BAT361WIC DIPOLES PSBEX-YEA1TE-MPEMOMPO8120 C213AFZ306001BAT361CONN STIRRERS TO DIPOLES PSBEX-YEA1TE-EPCPITTET16 TOTAL Campaign PSBEX-YEA1 No possibilities to execute additional requests

1. Copper cabling Booster 2/3 12/11/2015G. Georgiev Campaign PSBEX-YEA1 anticipation – work before YETS Fireproof closures will be open

1. Copper cabling Booster 3/3 12/11/2015G. Georgiev Campaign PSBEX-YEA1 during YETS Work in shifts needed – cabling / de-cabling project

2. Copper cabling PS 1/8 12/11/2015P. Lelong Campaign PSREX-YEA1 AffaireLOCALISATIONTitleGroupUserNb. cablesLength (m) FZ100001BAT150-BAT151CABLAGE REMOTE RESETBE-RFLANDRE2350 FZ102001BAT150-BAT151CABLAGE REMOTE RESETBE-RFTOTOS51250 FZ123001BAT151CABLAGE REMOTE RESETBE-RFTOTOS18335 FZ138001BAT368CABLAGE OASIS BLMBE-COSAID FZ CABLAGE DI RENOVATION Z29GS-ASERAFFOURT FZ143001BAT 355LIU-PS / PS-QDN-QFN (ETHERNET)TE-EPCGOMEZ COSTA44494 FZ144001BAT 355LIU-PS / PS-QDN-QFN (DC CABLING)TE-EPCPITTET42840 FZ148001BAT 150CABLAGE MAGNET INTERLOCK LEIRTE-MPEMOMPO4140 FZ156001BAT359 - BAT151CABLAGE MTGBE-COSAID1250 FZ161001BAT 151REPRISE CABLES EXISTANTSTE-EPCDE MALLAC450 FZ167001BAT 355LIU - ALIM APOLO_2STE-EPCREIGNIER280 FZ169001BAT 365CABLAGE ETHERNETTE-EPCGOMEZ COSTA130 FZ170001BAT 355CABLAGE ETHERNET APOLOTE-EPCGOMEZ COSTA140 FZ MULTICABLAGE BE-CO SIMPLIF. RESEAUBE-COSAID92115 FZ172001BAT BAT 250LEIR / CTRL CONVERTISSEURSBE-COCATIN382 FZ173001BT 355MAG.INTERLOCKS QFN / QDNTE-MPEMOMPO9880 FZ175001BAT 355CABLAGE 1553BE-COSAID150 Total No possibilities to execute additional requests

2. Copper cabling PS 2/8 12/11/2015P. Lelong Campaign PSREX-YEA1 QFN/QDN: -FZ143 -FZ144 -FZ173 -FZ175 APOLO: -FZ167 -FZ170 REMOTE-RESET: -FZ100 -FZ102 -FZ123 OASIS BLM: -FZ138 RENOV DI Z29: -FZ141 INTERL LEIR: -FZ148 MTG: -FZ156 CTRL CONV: -FZ172 Reprise 4 câbles: -FZ161 CABLAGE BE-CO: -FZ939 (Bat )

2. Copper cabling PS 3/8 12/11/2015P. Lelong Campaign PSRIN-YEA1 No possibilities to execute additional requests AffaireLOCALISATIONTitleGroupUserNb. cablesLength (m) FZ146001BAT ? - PS (SS82)CABLAGE BGIBE-BISTOREY FZ147001BAT PSCABLAGE CAVITY PS 20/40/80/200MHZBE-RFHAASE FZ148002BAT PSCABLAGE MAGNET INTERLOCK LEIRTE-MPEMOMPO4400 FZ150001LINAC3 - PSCABLAGE WICTE-MPEDAHLEN FZ159001BAT157 - PSCONSOLIDATION BTV HALL ESTBE-BIBURGER4340 FZ160001BAT PSREMPLACEMENT CABLES JAUGESTE-VSCDE LA GAMA61100 FZ162001BAT PS (SS90)CABLAGE PICKUP SS90BE-BIBELLEMAN51000 FZ180001BAT BAT 352ECR - PS-YEC EDMS GS-ASENININ21000 FZ168001BAT359 - PSCABLES ANTENNEIT-CSCHAPRON5500 FZ174001BAT BAT 151FINEMET - 1ER TEST 12 CABLES MCA36BE-RFHAASE120 FZ179001BAT BAT 151FINEMET - 2EME TEST 12 CABLES MCA36BE-RFHAASE120 Total

2. Copper cabling PS 4/8 12/11/2015P. Lelong Campaign PSRIN-YEA1 Interl. LEIR: -FZ148 WIC Linac3: -FZ150 BTV Hall Est: -FZ159 Porte Secteur Bat352: -FZ180 Jauges (9/17/18/32): -FZ160 Pickup SS90: -FZ162 GSM: -FZ168 BGI (SS82): -FZ146 Attente infos! Tests câble Finemet: -FZ174 -FZ179 Cavités RF: -FZ147

2. Copper cabling PS 5/8 12/11/2015P. Lelong Campaign PSRIN-YEB1 (if possible) This campaign could be started but not surely completed! AffaireLOCALISATIONTitleGroupUserNb. cablesLength (m) FZ177001BAT PSCABLAGE BLM (PS-BLO)BE-BIZAMANTZAS Câbles BLM: -SD14 à SD18 Câbles BLM: -SD40 à SD49 Câbles BLM: -SD71 à SD83

2. Copper cabling PS 6/8 12/11/2015P. Lelong Campaign ADEX-YEA1 (From AD to TT2) AffaireLOCALISATIONTitleGroupUserNb. cablesLength (m) FZ104001BAT 193 – TT2CABLAGE TRANSFO TFA9012BE-BILENARDON2540 Plateforme de racks AD Transfo TFA9012

2. Copper cabling PS 7/8 12/11/2015P. Lelong Campaign TOFIN-YEA1 (Tunnel NTOF + EAR2) Rack DI Bris de glace et Sirènes Câblage local: - FZ171 FZ140 Affaire LOCALISATIONTitleGroupUserNb. cablesLength (m) FZ BAT TT2ACABLAGE BIWGS-ASERAFFOURT8920 FZ BAT 380CABLAGE ALARM DOOREN-STILENDARO8250 TOTAL161170

2. Copper cabling PS 8/8 12/11/2015P. Lelong Other campaign for PS complex AffaireCampagneLOCALISATIONTitleGroupUserNb. cablesLength (m) FZ152001EXEIN-YEA1BAT BAT 2009CABLAGE DI (RENOVATION Z24)GS-ASERAFFOURT81800 FZ153001CTFIN-YEA1 BAT BAT 2002CABLAGE DI (RENOVATION Z27)GS-ASERAFFOURT4480 FZ159002EXEIN-YEA1BAT157CONSOLIDATION BTV HALL ESTBE-BIBURGER190 FZ150002LI3IN-YEA1LINAC3CABLAGE WICTE-MPEDAHLEN TOTAL Summary CampagneNb. cablesLength (m) PSREX-YEA PSRIN-YEA ADEX-YEA12540 TOFIN-YEA OTHERS TOTAL Km of cable for PS complex YETS activity, Excluding BLM campaign (PSRIN-YEB1 – 17.5km) !

ActivitésLocalisationContraintesDurée - Travaux bâtiments de surface - Installation Infrastructure tube, pour futures liaisonsSurface (354, 359, 353)Ouverture faux planchers2 jours - Installation d'une liaison entre Bldg 354 et 368 (5 fibres)Surface (354, 359, 368)Ouverture faux planchers2 jours - Installation liaison Trigger Oasis CBAOS7Surface (354, 361)Ouverture faux planchers2 jours - Travaux sous-sol - Installation tubes et liaisons entre le 151-R-005 et 5 différentes positions autour PS-Ring 151-R05, PS-RINGOuverture caniveau, visite préparatoire5 jours - Installation d'un tube et 12 SM Rad-Hard fibres368, SS82(PS-Ring)Ouverture caniveau, visite préparatoire2 jours - Visites techniques - Visites locaux techniques IT Tous bâtiments de surface aucunen/a - Déplacement d'un Rack au Ouverture faux planchersn/a - Etude cheminements pour Beam Wire Scanner PSBPSBaucunen/a 3. Optical fibres Booster & PS 1/1 J-M. Lassauce

4. Support needed DGS/RP Work Dose Planning (only PS) EN/MEF Detail schedule VIC Scaffolding if needed, … EN/HE Drums transport and handling Opening cables trenches 12/11/2015

5. Conclusion 12/11/2015 Work in shifts needed – cabling / de-cabling project (PSB). Extended working hours for PS. Missing information for BGI (needed ASAP). Many fireproof closure will be open (PSB). Many other groups will be involved in our interventions. No possibilities to execute additional requests