Project Risk Management. Risk-Defined A situation involving exposure to danger; “The combination of the probability of an event and its consequences”

Slides:



Advertisements
Similar presentations
Chapter 7 Managing Risk.
Advertisements

Managing Risk CHAPTER SEVEN Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
PROJECT RISK MANAGEMENT
OPSM 639, C. Akkan1 Defining Risk Risk is –the undesirable events, their chances of occurring and their consequences. Some risk can be identified before.
Project Management Gaafar 2007 / 1 This Presentation is uses information from PMBOK Guide 2000 Project Management Risk Management* Dr. Lotfi Gaafar.
Project Management.
Chapter 7: Managing Risk
© 2013 Cengage Learning. All Rights Reserved. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part.
Software Development Problems Range of Intervention Theory Prevention, Treatment and Maintenance Planning, Development and Use Cost of Intervention.
Project Based Risk Management Defusing a potential ticking time bomb
Managing Project Risk.
Managing Risk to Reduce Construction Claims (And Improve Project Success) Presented by Laurie Dennis, PE, CVS-Life, FSAVE.
© 2012 McGladrey LLP. All Rights Reserved.© 2014 McGladrey LLP. All Rights Reserved. © 2012 McGladrey LLP. All Rights Reserved. © 2013 McGladrey LLP. All.
8 Managing Risk Teaching Strategies
7-1 Risk Management. 7-2 Risk Risk (in general, in finance): deviation, variance The change can be positive or negative Project risk: any possible event.
7-1 Risk Management Chapter 7 © 2007 Pearson Education.
Don Cole Risk Assessment and Mitigation Project Management for ARA Engineers and Scientists.
Project Risk Management
Role and Components of Project Evaluation
© 2006 ITT Educational Services Inc. SE350 System Analysis for Software Engineers: Unit 6 Slide 1 Chapter 5 Initiating and Planning Systems Development.
PMI Knowledge Areas Risk Management.
Project Risk Management. The Importance of Project Risk Management Project risk management is the art and science of identifying, analyzing, and responding.
Chapter 11: Project Risk Management
Chapter 10 Contemporary Project Management Kloppenborg
November, 2000 Slide 1 Project Services Division RISK MANAGEMENT Project Services Division Presentation By: Adam Malkhassian November, 2000.
Managing Risk. Objectives  To Describe Risk Management concepts and techniques  To calculate and analyze a project using Probability of completion 
Risk management process
Introduction Time Quality Cost Project Constraints Success Introduction.
Risk Management in the Built Environment Qualitative and Quantitative Risk Management By Professor Simon Burtonshaw-Gunn – licensed under the Creative.
Managing Risks in Projects. Risk Concepts The Likelihood that some Problematical Event will Occur The Likelihood that some Problematical Event will Occur.
Risk Management Project Management Digital Media Department Unit Credit Value : 4 Essential Learning time : 120 hours.
Quick Recap Monitoring and Controlling. Phases of Quality Assurance Acceptance sampling Process control Continuous improvement Inspection before/after.
Hartley, Project Management: Integrating Strategy, Operations and Change, 3e Tilde Publishing Chapter 10 Risk Management Proactively managing the positive.
Project Management By: Dr Madhu Fernando Project Risk Management
Risk Assignment in The Delivery of a Project  RISK! –Construction projects have lot of it –Contractors manage it –Owners pay for it.
7-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Risk Management Chapter 7.
7-1 Risk Management Chapter 7 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.
Chapter 7 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall 7-1 Risk Management.
Welcome to Session 3 – Project Management Process Overview
Advanced Project Management Project Risk Management Ghazala Amin.
Risk management (lecture). D efinitions of risk General: standard deviation Finance: volatility of return and costs Risk in project management (Lockyer.
Ch 10 - Risk Management Learning Objectives You should be able to: List and describe risk management processes, inputs, outputs, and tools List and describe.
Question Four: Project Risk Management PMBOK definition of Project Risk Project risk management is the art and science of identifying, analyzing, and responding.
Managing Risk CHAPTER SEVEN Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
SOFTWARE PROJECT MANAGEMENT
Managing Risk CHAPTER SEVEN Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Project Risk Management Planning Stage
Software Engineering Lecture 6: Risk Analysis & Management.
Risk Management. 7–2 Where We Are Now 7–3 Risk Management Process Risk –Uncertain or chance events that planning can not overcome or control. Risk Management.
RISK MANAGEMENT YULVI. Introduction Time Quality Cost Project Constraints Success Introduction.
Introduction to Project Management Chapter 9 Managing Project Risk
Risk. Step 1-Risk identification Analyze the project to identify the source of risk Step 2-Risk Asessment Assess risk interms of Severity of impact Likely.
1 1 Effective Administration of Commercial Contracts Breakout Session # Session D06 Name: Holly Walker, CPCM Corporate Learning Solutions and Contract.
PROJECT MANAGEMENT week 8
Stoimen Stoimenov QA Engineer SitefinityLeads,SitefinityTeam6 Telerik QA Academy Telerik QA Academy.
Business Continuity Planning 101
ON “SOFTWARE ENGINEERING” SUBJECT TOPIC “RISK ANALYSIS AND MANAGEMENT” MASTER OF COMPUTER APPLICATION (5th Semester) Presented by: ANOOP GANGWAR SRMSCET,
Managing Project Risk – A simplified approach Presented by : Damian Leonard.
Systems Analysis and Design in a Changing World, 4th Edition
8 Managing Risk (Premium).
CHAPTER11 Project Risk Management
Recognization and management of RISK in educational projects
Identifying and Prioritizing Risks
Risk management Chapter 7 Copyright ©2016 Pearson Education, Inc.
Risk Register I want to plan a project
Risk management.
Chapter#8:Project Risk Management Planning
Risk management.
Effective Risk Management in Decision Making Process
Chapter#8:Project Risk Management Planning
Presentation transcript:

Project Risk Management

Risk-Defined A situation involving exposure to danger; “The combination of the probability of an event and its consequences” “Effect of uncertainty on objectives”  Uncertainties include events (which may or not happen);  Uncertainties caused by ambiguity or a lack of information; and  Also includes both negative and positive impacts on objectives.

Risk Management Project risk management is the art and science of identifying, assigning, and responding to risk throughout the life of a project and in the best interests of meeting project objectives  A proactive attempt to recognize and manage internal events and external threats that affect the likelihood of a project’s success.  What can go wrong (risk event).  How to minimize the risk event’s impact (consequences).  What can be done before an event occurs (anticipation).  What to do when an event occurs (contingency plans).

The Risk Management Process

Managing Risk  Step 1: Risk Identification  Generate a list of possible risks through brainstorming, problem identification and risk profiling.  Macro risks first, then specific events  Step 2: Risk Assessment  Scenario analysis for event probability and impact  Risk assessment matrix  Failure Mode and Effects Analysis (FMEA)  Probability analysis  Decision trees, NPV, and PERT  Semi quantitative scenario analysis

Managing Risk  Step 3: Risk Response Development  Mitigating Risk  Reducing the likelihood an adverse event will occur.  Reducing impact of adverse event.  Avoiding Risk  Changing the project plan to eliminate the risk or condition.  Transferring Risk  Paying a premium to pass the risk to another party.  Requiring Build-Own-Operate-Transfer (BOOT) provisions.  Retaining Risk  Making a conscious decision to accept the risk.

Contingency Planning  Contingency Plan  An alternative plan that will be used if a possible foreseen risk event actually occurs.  A plan of actions that will reduce or mitigate the negative impact (consequences) of a risk event.  Risks of Not Having a Contingency Plan  Having no plan may slow managerial response.  Decisions made under pressure can be potentially dangerous and costly.

Managing Risk  Step 4: Risk Response Control  Risk control  Execution of the risk response strategy  Monitoring of triggering events  Initiating contingency plans  Watching for new risks  Establishing a Change Management System  Monitoring, tracking, and reporting risk  Fostering an open organization environment  Repeating risk identification/assessment exercises  Assigning and documenting responsibility for managing risk

Effective Risk Management

IDENTIFY UNCERTAINTIES Explore the contract and relationship for areas of uncertainty ANALYSE RISKS Specify how each uncertainty can impact performance - duration, cost, meeting requirements PRIORITIZE RISKS Establish risks to be eliminated (too severe), requiring committed management attention, minor in effect MITIGATE RISKS Take advance action to reduce effect. It is better to spend on mitigation than to include contingency. PLAN FOR EMERGENCIES For all significant risks, have an emergency plan in place. MEASURE AND CONTROL Track the effects of the risks identified and manage to a successful conclusion.

What Constitutes Risk in Projects?  New technology.  Uncommon systems or methods.  Uncertain funding.  Unusual financing arrangements.  Controversial functions are provided by the project.  Unrealistic completion dates and/or budgets.  Changing customer ownership/control  Unusual contracting arrangements  Project scope is not clearly defined.  Project need and alternatives have not been rigorously evaluated.  Large number of approvals are required.  Conflict among project participants.  Relationship between parent organization's role and the project is not clear

Typical Risk Categories  Technical Feasibility  Political and External Market  Financial and Economic  Legal and Contractual  Human Behavior  Scope and Schedule  Project Organization

Technical/Feasibility Risks 13  Organizational lack of familiarity with the technology  Relative level of technical complexity  Maturity of the technology (new vs. tried and tested)  Interconnectivity of technology with existing systems  Existing assets are underutilized in this project  Obsolete approach for program delivery  Customer demand projections incorrect  Uncertainty over customer ownership and control

Political/External Risks 14  Marketplace Positioning/competition  Regulatory Environment unfavorable  Customer Corporate/Organizational changes in priorities  Customer Commitment/viability of project  Changes in decision makers  Natural Hazards  Political changes (new laws, tax policies etc.)

Financial/Economic Risks 15  Project costs can exceed budget  High inflation or cost increases  Customer bankruptcy  Cash flow profile unfavorable  Funding not approved by customer  Excessive price fluctuation on imported components  Required investment too high for return

Legal and Contractual Risks 16  Breach of contract/termination's  Penalty clauses  Excessive warranties  Contract claims/failure to perform  Contract disputes escalation procedure inadequate  Excessive liability  Patent/copyright infringement  Team unfamiliar with procurement method

Human Behavior Risks 17  Unavailability of Internal technical expertise  Unavailability of External technical expertise  Lack of staff support for project  Delays in customer approvals  Delays in documentation  Actions by labor unions

Scope and Schedule Risks 18  Unreality of stated deadlines  Inadequate project definition  Standards incompatible with requirements  Design incorporates high maintenance materials  Lack of resource availability  Lack of product availability  Poor coordination of resources  Requirement inflexibility

Project Organization Risks 19  Unavailability of key project personnel  Change of key customer personnel  Unsatisfactory choice of subcontractors  Engineering design not kept to schedule  Inadequate coordination of partners and subcontractors  Staff not trained in time  Inadequate contract documentation  Inadequate security of site during installation