January 29, 2014 MWG Meeting Topics for Discussion.

Slides:



Advertisements
Similar presentations
1 Market Trials Outage Scheduling Qualifications Weekly Update February 18, 2010.
Advertisements

[INSERT APPLICABLE REGIONAL ENTITY NAME/LOGO] [ENTITY NAME] [FUNCTION CERTIFYING] Certification [LOCATION] – [DATES OF ON-SITE VISIT] [Presenter Name,
October 16, 2012 MWG Meeting Topics for Discussion.
1 Nodal Stabilization Market Call December 28, 2010.
Lead from the front Texas Nodal 1 EDS 3 Release 5 Phase 1 Testing Monday / Friday Market Updates August 27, 2007.
1 Market Trials Outage Scheduling Qualifications Weekly Update April 02, 2010.
1 GENMAP Registration Workshop Jan 14, 2010.
1 Market Trials Congestion Revenue Rights Weekly Update May 21, 2010.
Lead from the front Texas Nodal 1 Resource Entity Owned Transmission Asset Data Collection Feb 27, 2009 Kick Off Meeting.
Lead from the front Texas Nodal 1 EDS 3 Release 5 Monday / Friday Market Updates March 07, 2008.
Lead from the front Texas Nodal 1 EDS 3 Release 5 and 6 Friday Market Updates Dec 19, 2008.
1 Nodal Stabilization Market Call December 22, 2010.
1 Market Trials Congestion Revenue Rights Weekly Update June 25, 2010.
Lead from the front Texas Nodal 1 Registration Market Call Apr 10, 2009.
Lead from the front Texas Nodal 1 EDS 3 Release 5 Monday / Friday Market Updates November 30, 2007.
Lead from the front Texas Nodal 1 Registration Market Call Mar 13, 2009.
NPRR 219 & Outage Scheduler Enhancement Workshop April 28, 2014.
SHARYLAND TRANSITION TASKFORCE (STTF) AGENDA STTF MEETING AUGUST 21,
MP Online Data Entry Phase 1 RDWG Market Requirements Workshop November 06, 2013.
Lead from the front Texas Nodal 1 Registration Market Call June Data Collection Window Aug 14, 2009.
1 Cutover Market Call December 01, :30 AM.
1 Market Trials Real-Time Market / LFC Weekly Update April 9, 2010.
December 12, 2013 MWG Meeting Topics for Discussion.
1 Market Trials Outage Scheduling Weekly Update July 02, 2010.
1 Market Trials Open Market Participant Call Weekly Kick Off March 01, 2010.
1 Market Trials Congestion Revenue Rights Weekly Update May 6, 2010.
Lead from the front Texas Nodal 1 Registration Market Call Oct 31, 2008.
Overview Art Deller, P.E. Supervisor, Model Administration New Resource Workshop May 28, 2014.
1 TSP Nodal Engagement Market Participant Call ERCOT September 15, 2010.
Lead from the front Texas Nodal 1 Registration Market Call Mar 27, 2009.
MISUG Meeting Materials Jackie Ashbaugh/Jamie Lavas ERCOT 2/22/2011.
RMS/COPS Workshop VI 1 October 06, Antitrust Admonition ERCOT strictly prohibits Market Participants and their employees who are participating in.
Lead from the front Texas Nodal 1 EDS 4 Outage Scheduler EDS Market Call May 30, 2008.
1 Market Trials Outage Scheduling Weekly Update June 11, 2010.
Lead from the front Texas Nodal 1 EDS 3 Release 5 Phase 1 Testing Monday / Friday Market Updates September 24, 2007.
Lead from the front Texas Nodal 1 EDS 4 Outage Scheduler EDS Market Call June 20, 2008.
SHARYLAND TRANSITION TASKFORCE (STTF) AGENDA STTF MEETING APRIL 17,
Congestion Revenue Rights Market Trials Call 15 January, 2010.
Lead from the front Texas Nodal 1 EDS 3 Release 5 Monday / Friday Market Updates November 16, 2007.
MISUG Meeting Materials Jackie Ashbaugh/Jamie Lavas ERCOT 1/13/2011.
January 14, 2016 MWG Meeting. Topics for discussion: 1.) ERCOT Anti-Trust Admonition (D. Sumbera)9:30 – 9:35 2.) Attendance roll-call and introduction.
1 Market Trials Outage Scheduling Weekly Update August 20, 2010.
1 Nodal Credit Update at WMS June 16, 2010.
Demand Side Working Group Chair Slides May 28 th, 2014.
Welcome to All & Antitrust Admonition Kathy Scott October 16, 2015.
14 Minute Ramp Period Testing Workshop June 30, 2009.
1 Nodal Stabilization Market Call December 03, :30 PM.
1 Market Trials Outage Scheduling Weekly Update August 13, 2010.
E. Follow-up discussion on Parallel CT clarification per SMOG (e) (H. Perez) SMOG (e) Paralleling of Current Transformers – Connected burden.
1 Cutover Market Call November 27, 2010.
1 Nodal Stabilization Market Call December 27, 2010.
Lead from the front Texas Nodal 1 EDS 4 Outage Scheduler EDS Market Call April 25, 2008.
Lead from the front Texas Nodal 1 EDS Market Call Weekly Update Jan 30, 2009.
1 Market Trials Open Market Participant Call Weekly Kick Off Aug 09, 2010.
Lead from the front Texas Nodal 1 Registration Market Call June Data Collection Window June 05, 2009.
1 Market Trials Congestion Revenue Rights Weekly Update May 28, 2010.
ERCOT Wholesale Market SubcommitteeJanuary 12, ERCOT Wholesale Market SubcommitteeJanuary 12, ERCOT/IMM/PUCT Proposal for Redaction of State.
Lead from the front Texas Nodal 1 EDS 3 Release 5 Phase 1 Testing Monday / Friday Market Updates September 26, 2007.
Lead from the front Texas Nodal 1 EDS 3 Release 5 and 6 Friday Market Updates Oct 24, 2008.
Lead from the front Texas Nodal 1 Registration Market Call Nov 14, 2008.
1 Cutover Market Call November 28, 2010.
Lead from the front Texas Nodal 1 Registration Market Call Nov 21, 2008.
1 Nodal Stabilization Market Call December 02, :30 PM.
1 Market Trials Outage Scheduling Qualifications Weekly Update March 26, 2010.
EDS 3 Release 5 and 6 Friday Market Updates Jan 23, 2009
Market Trials Open Market Participant Call
Cutover Market Call November 29, :30 PM
EDS 3 Release 5 and 6 Friday Market Updates Sept 05, 2008
EDS 3 Release 5 and 6 Friday Market Updates Sept 19, 2008
Market Trials Open Market Participant Call
Presentation transcript:

January 29, 2014 MWG Meeting Topics for Discussion

Topics for discussion: 9:00 am – 9:05 am1.) ERCOT Anti-Trust Admonition (D. DiSanto) 9:05 am – 9:15 am2.) Attendance roll-call and introduction (D. DiSanto) 9:15 am – 9:30 am3.) Nomination & selection of new MWG Chairperson & Vice-chairperson (D. Tucker/H. Perez) 9:30 am – 10:30 am4.) Discussion of SMOGRR relating to NPRR-570 (D. Tucker/P. Vinton) 10:30 am – 10:45 am5.) Break 10:45 am – 11:45 am6.) Discussion of data estimation using telemetry points measuring the same energy flows as an EPS metering point (D. Tucker/P. Vinton)

Topics for discussion: 11:45 am – 1:00 pm7.) Lunch Break 1:00 pm – 1:15 pm8.) Follow-up discussion on CCVT 5-year re- certification (H. Perez) 1:15 pm – 1:45 pm9.) Presentation of revised wordings in SMOG regarding Parallel CT (H. Perez) 1:45 pm – 2:15 pm10.) Presentation of revised wordings in SMOG regarding Loss of Potential (H. Perez) 2:15 pm – 2:30 pm11.) Break

Topics for discussion: 2:30 pm – 2:45 pm12.) Presentation of revised wordings in SMOG regarding TDSP’s submission of nameplate photos of newly-installed instrument transformer (CTs & VTs) as part of the Site Certification Documents (H. Perez) 2:45 am – 3:55 pm13.) New or other business items (D. DiSanto) 3:55 am – 4:00 pm14.) Meeting Wrap-up (D. DiSanto) 4:00 pm15.) End of Meeting

1.) Legal Disclaimers and Admonitions Antitrust Admonition ERCOT strictly prohibits market participants and their employees who are participating in ERCOT activities from using their participation in ERCOT activities as a forum for engaging in practices or communications that violate antitrust laws. The ERCOT Board has approved guidelines for Members of ERCOT Committees, subcommittees and working groups to be reviewed and followed by each market participant attending ERCOT meetings. For details, please review the guidelines in the attachments tab of this presentation (if available).

2.Attendance roll-call and introduction (D. DiSanto) If you are planning to attend in person, please me at so we can provide your name to our Security Department and that you will be given access to the meeting venue on that day of the meeting.

3)Nomination and selection of new MWG Chairperson and Vice- chairperson (D. Tucker/H. Perez) Nominations are now open.

4. Discussion of SMOGRR relating to NPRR-570 (D. Tucker/P. Vinton)

5. Break

6)Discussion of data estimation using telemetry points measuring the same energy flows as an EPS metering point (D. Tucker/P. Vinton) - EPS Meter Mapping to Telemetry Point for Estimation during communications failures - Initial Proof-of-Concept with subset of TDSPs/Sites - Initial Setup Process prior to May 1, On-Going Maintenance Process after May 1, 2014

6)Con’t – EPS Meter Mapping to Telemetry Point for Estimation Purposes

7. Lunch Break

8)Follow-up discussion on CCVT 5-year re-certification (H. Perez) * Out of 207 units of CCVTs used as EPS metering PTs in the ERCOT region, only 6 units (2.8% of total) had the original test report when it first came out of the factory and had the “as-found accuracy” and “as-left accuracy” test data from the re-certification test provided to ERCOT. * This is a small sample and may not be useful to arrive at a conclusion on whether the CCVTs retain its metering accuracy over time or not. * Ideally, a more reasonable sample rate would be 36% of the total number of CCVTs * Status of the proposed field testing?

9. Presentation of revised wordings in SMOG regarding Parallel CT (H. Perez) SMOG (e) Paralleling of Current Transformers – Connected burden Paralleling of current transformers is not recommended. However, when it is necessary, the following requirements apply. (e)Each current transformer must be capable of supporting n times the total common connected burden on all CTs in parallel plus its own burden within the accuracy class of the transformers, where n = number of current transformers in parallel. Note: We can re-word the above statement using the concepts illustrated on the attached documents (Current Transformer Burden Sheet Draft V2.1.xls & CPS parallel CTs.pptx)

Open item questions with answers regarding paralleling of CTs: i.How to verify individual impedance on each conductor and common impedance? Answer: By calculation or measurement. ii.Is common burden shared equally between all parallel CTs? Answer: Per CPS study, the total common burden will be shared equally by each CT when flow is distributed equally on paralleled CT’s. For further discussion. iii. Should maximum current (at rating factor) be utilized in calculating total burden on each CT in case of flow thru scenarios (eg. Breaker-and-half scheme)? Answer: Yes. iv. What is the impact if CT primary is shorted? Answer: The burden increases. v. What was the result of the lab test conducted by CPS regarding paralleling of CTs? Answer: CPS study is posted in the key documents.

10. Presentation of revised wordings in SMOG regarding Loss of Potential (H. Perez) 1.4.7Loss of Potential The secondary circuit shall be monitored for loss of potential on each phase whenever meter input voltage falls below 75% of the nominal value for 1 second or more. Note: We can add in the language a statement such as: “This event logging will take effect starting MM/DD/YYYY”.

11. Break

12. Presentation of revised wordings in SMOG regarding TDSP’s submission of nameplate photos of newly-installed instrument transformers (CTs & VTs) as part of the Site Certification Documents (H. Perez) 3.2.3Site Approval Request Package The Site Approval Request Package should be provided within 60 days after the site has been certified and must include: (a)Site Certification Form;.. (i)Readable photos of the nameplates of newly-installed or replaced instruments transformers; (j)Other information as required

Nameplate photos of newly-installed instrument transformers

13. New or other business items (D. DiSanto)

14. Meeting Wrap-up (D. DiSanto)

15. End of meeting

Questions?