Presented to: By: Date: Federal Aviation Administration 2015 GAA Conference Georgia Airports Association Atlanta Airports District Office October 14, 2015.

Slides:



Advertisements
Similar presentations
Module N° 4 – ICAO SSP framework
Advertisements

1 Welcome Safety Regulatory Function Handbook April 2006.
Airport Layout Plans (ALPs)
Agenda Introduction Advisory Circular Changes Consultant Selection Procedures Contract Format and Provisions Methods of Contracting and Allowable Costs.
Presenter Todd G. Johnson, Airport Solutions Specialist September 14, 2012.
Presented to: By: Date: Federal Aviation Administration Safety Management System (SMS) at Airports : Principles APEC TPT-WG AEG-SAF Jim White, Deputy Director.
AACC Compatible Land Use Planning Series Series Includes Presentations from: FAA Airports Division – March 10 AACC Meeting Planning Department, Municipality.
Federal Aviation Administration FAA Airports Programs Update IRWA Federal Agency Update Washington, DC March 24, 2014 Rick Etter FAA Office of Airports.
AAAE Airport Finance & Administration Conference Daytona Beach, Florida March 4-7, 2012 Federal Controls on the Use of Airport Revenue Pablo O. Nüesch.
Rick Etter, Airports Acquisition Specialist FAA Office of Airports, Planning and Environmental Washington, DC Federal Aviation Administration Guidance.
Ken Jacobs Airport Planning & Environmental Division March 3, 2010 Federal Aviation Administration Federal Aviation Administration 33.
Presented to: AIP Grant Process Workshop By: Roxane Wren and Edward Gabsewics, CEP Date: December 2009 Federal Aviation Administration Grant Application.
Presented to: By: Date: Federal Aviation Administration Properly Aligning your ACIP for the annual planning meeting 2014 Annual ACA Conference Patrick.
Federal Aviation Administration 1 35 th Annual Airports Conference – April 3, 2012 FAA Air show Waiver Reviews Presentation to: Name: Date: 35 th Annual.
Presented to: By: Date: Federal Aviation Administration PASSENGER FACILITY CHARGE PROGRAM UPDATE 29 TH Annual Airports Conference Sheryl Scarborough, FAA.
Federal Aviation Administration 1 Georgia Airports Association February 25, 2015 Presented to: By: Date: Federal Aviation Administration GAA 2015 Spring.
1 Comprehensive Management Plan for East Hampton Airport  Safety, Noise and Operations Peter J. Kirsch December 1, 2011.
Presented to: By: Date: Federal Aviation Administration Federal Grants and Airport Capital Improvement Programs Western-Pacific Region Association of California.
Recent Lighting and Marking Design Challenges/Trends
OHIO AVIATION ASSOCIATION April 22, WELCOME AND INTRODUCTIONS Dave Dennis – Aviation Planner, ODOT Office of Aviation; Project Manager for Focus.
Presented to: Hershey Aviation Conference By: Ed Gabsewics, Charlie Campbell & Suki Gill Date: March 3, 2010 Federal Aviation Administration Environmental.
Airport Planning. errata Traditional forecasting techniques are still in play, but are considered archaic. US airlines are focused on international travel.
Contractor Management and ISO 14001:2004
Rail Freight Assistance Program (RFAP) S ETTING THE S TAGE FOR THE F UTURE Rail Transportation Assistance Program (Rail TAP) RFAC Meeting April 28, 2010.
Presented to: By: Date: Federal Aviation Administration 2015 GAA Spring Workshop Georgia Airports Association Atlanta Airports District Office February.
Georgia Airports Association Spring Workshop February 25, 2015 Georgia Department of Transportation FAA Policy and Procedures Concerning the Use of Airport.
Presented to: By: Date: Federal Aviation Administration What Does the Asset Study Mean for California Airports? Robin Hunt and Patrick Lammerding September.
Presented to: By: Date: Federal Aviation Administration Changes in Reimbursable Agreements 31 st Annual Airports Conference V Thompson & R Farrell, Lead.
Page CDBG Recipients' Workshop Community Finance Division NEPA Environmental Procedures.
By: Carol Martineau, Acting Assistant Manager, Aircraft Maintenance Division, AFS-301 Date: June 7, 2015 Federal Aviation Administration ASA Conference.
Federal Aviation Administration Rick Etter Airports Acquisition Specialist FAA, Office of Airport Planning and Programming International Right-of-Way Association.
New Decade - New Challenges Annual Conference September 2010 Water Services Training Group 14 th Annual Conference New Decade – New Challenges 9 th September.
International Right-of-Way Association
Presented to: 2012 Pacific Aviation Director’s Workshop, Guam By: Juan S.A. Reyes, A.C.E., ACSI Date: March 13-15, 2012 Federal Aviation Administration.
Presented by Cassandra Isackson January 28, 2015 Rochester Int’l Airport.
Federal Aviation Administration Advisory Circular 150/5370-2F Operational Safety on Airports During Construction Presented to: Eastern Region 35 th Annual.
Focus Points Airport Layout Plan (ALP) Overview ALP Guidance
Presented to: By: Date: Federal Aviation Administration Airports Division Eastern Region Grant Closeout Guidance 33 rd Annual Airports Conference Patricia.
HIGHWAY/UTILITY PROGRAM OVERVIEW ROADWAY CONFERENCE APRIL 20, 2009.
Federal Aviation Administration FAA Presentation to Prospective Bidders Chicago Midway International Airport July 30, Airports Division Great Lakes.
Presented to: By: Date: Federal Aviation Administration Airport Inspection & Maintenance at General Aviation Airports Airport Compliance Airports Conference.
Presented to: By: Date: Federal Aviation Administration 2012 ACA Annual Conference David F. Cushing, Manager, LAX-ADO Wednesday, September 11, 2013 Construction.
Presented to:FAA field personnel By:AOSC Date:February 17, 2006 Presented to:FAA field personnel By:AOSC Date:February 17, 2006 Federal Aviation Administration.
Presented to: By: Date: Federal Aviation Administration Environmental Best Practices Air Quality Issues 2010 Hershey Conference Maria Stanco, AEA Environmental.
Federal Aviation Administration 14 CFR Part 147 Aviation Advisory Committee Working Group Training Updates Presented to: World Aviation Training Symposium.
By: Nancy S. Williams Date:March 4, 2010 Federal Aviation Administration Eligibility of Safety, Security and Snow Removal Equipment Under AIP.
Federal Aviation Administration Rick Etter Airport Acquisition Specialist FAA, Office of Airport Planning and Programming (202) ,
Federal Aviation Administration 1 Eastern Regional Conference March 2, 2011 Hershey, PA Office of Airport Planning and Programming Airport Improvement.
Federal Aviation Administration 0 0 FAA Hot Topics Reauthorization, Continuing Resolutions and Environmental Issues Federal Aviation Administration Presented.
State Safety Inspections and Sponsor Expectations.
Non-Aeronautical Use of Hangars Update
2015 GDOT PowerPoint Title Page Sub Titles Body Text GDOT Aviation Programs Update Georgia Airports Association October 14, 2015 Presented By Steven V.
NOAA Aviation Safety Board Meeting May 16, 2006 Lieutenant Commander Debora Barr NOAA Aviation Safety Program.
University of Minnesota Internal\External Sales “The Internal Sales Review Process” An Overview of What Happens During the Review.
Federal Aviation Administration Update Topics 1.FY 16 AIP 2.New Compliance Philosophy 3.SMS 4.Airports GIS 5.Competitive Consultant Selection 1.
OMB Memorandum M Implementation of the Government Charge Card Abuse Prevention Act of 2012 (Charge Card Act) September 2013.
Federal Aviation Administration Clarification to Policy and Procedures Concerning Use of Airport Revenues; Proceeds from Taxes on Aviation Fuel Presented.
Presented to: 34 th Annual Airports Conference By: Ed Gabsewics, CEP Date: March 3, 2011 Federal Aviation Administration Planning and Environmental Guidance.
Federal Aviation Administration 1 Georgia Airports Association 2016 Spring Workshop February 18, Federal Aviation Administration Office of Airports.
Federal Aviation Administration ARP SOP No SOP for CATEX Determinations Effective Date: Oct. 01, 2014 February 2016.
Federal Aviation Administration Navigating the AIP April 18, 2016 By:Glenn A Boles, Manager, AR/OK ADO Kathy Franklin, Program Manager, AR/OK ADO Presented.
Presented to: By: Date: Federal Aviation Administration 2016 GAA Workshop Georgia Airports Association Atlanta Airports District Office February 17, 2016.
1 Federal Aviation Administration AirTAP Fall Forum Wednesday, October 11, Airport Funding Status AirTAP Fall Forum Bob Huber Federal.
Session objectives After completing this session you will:
State Safety Inspections
Hangar Use Policy Winter Operations and Field Condition Reporting
ACA – Fall Conference FAA AIP Grants Management
AIRPORT PLANNING 101- THE BASICS
Airport Planning.
AIP Eligibility Presented to: Oklahoma Airport
Presentation transcript:

Presented to: By: Date: Federal Aviation Administration 2015 GAA Conference Georgia Airports Association Atlanta Airports District Office October 14, 2015

Federal Aviation Administration 2 Georgia Airports Association October 14, 2015 Federal Update Recap of FY 2015 AIP Program FY 2016 AIP Program Hot Topics

Federal Aviation Administration 3 Georgia Airports Association October 14, AIP Program October 1, 2014 – September 30, 2015 ATL-ADO Total Program = $157 Million GA: $20.5 Million for the Commercial Airports GA: $41.9 Million for the General Aviation Airports GA: $35.6 Million in Discretionary GA: Total = $62.4 Million

Federal Aviation Administration 4 Georgia Airports Association October 14, 2015 FY 2016 AIP Program All Airports Submitted Their Annual CIP’s in December 2014 ADO Established 2016 AIP Program in May 2015 ADO PM’s to begin conducting Pre-Grant Conferences for FY16 Projects Work with ADO PM on Bidding schedules

Federal Aviation Administration 5 Georgia Airports Association October 14, 2015 FY 2017 AIP Program CIP Call Letter To Be Issued In October 2015 (Dec. 1 submittal) Dec April ADO PM’s will be scrubbing CIP’s. May 2016 – Selection of FY17 Projects & Disc. Program. We Continue to Encourage Prior-year Design

Federal Aviation Administration 6 Georgia Airports Association October 14, 2015 Safety Runway Safety Areas – FAA is wrapping up a 15 year effort to improve all Runway Safety Areas at air carrier airports. This is a congressional mandate that must be complete by the end of calendar year Runway Incursions – The prevention of runway incursions continues to be a high safety priority of the FAA. The Office of Airports recently took an in depth look at runway incursion data for a six year period. We found that airport geometry played an important role in many of these incidents. In late 2015, The Office of Airports unveiled a new comprehensive and multiyear program to work with airports to identify, prioritize, and implement projects to correct these confusing airport geometry to reduce runway incursions. (Runway Incursion Mitigation (RIM) Program) Hot Topics for Airports

Federal Aviation Administration 7 Georgia Airports Association October 14, 2015 Safety Continued: Sign and Markings - There have been several sign and marking standards changes over the last couple of years. We encourage sponsors to review these Advisory Circulars and ensure your airports meet the standards. Wildlife – Please review your wildlife hazard assessment and management plan and update as necessary. Safety Management Systems (SMS) – FAA continues to implement internal SMS all Large, Medium and soon Small hub airports. This is a comprehensive user wide look at the overall safety of airport development projects. We also continue to pursue rulemaking for the implementation of SMS at 14 CFR part 139 airports. Hot Topics for Airports

Federal Aviation Administration 8 Georgia Airports Association October 14, 2015 Compliance Use of Airport Revenue/FAA Policy on Aviation Fuel Taxes - The FAA issued its final policy on proceeds from taxes on aviation fuel for publication in the Federal Register on November 7, This action finalizes the amendment of FAA’s Policy and Procedures Concerning the Use of Airport Revenues (Revenue Use Policy). The FAA’s Final Revenue Use Policy considers state or local taxes on aviation fuel (except taxes in effect on December 30, 1987) to be airport revenue subject to the revenue-use requirement. However, state and local taxes on aviation fuel may be used to support state aviation programs or for noise mitigation purposes, on or off airport. The policy amendment applies prospectively to the use of proceeds from both new taxes and to existing taxes that do not qualify for grandfathering from revenue use requirements. States and counties have one year from December 8, 2014 to develop a plan to comply and the plan should take no more than 3 years to implement. Hot Topics for Airports

Federal Aviation Administration 9 Georgia Airports Association October 14, 2015 Congressional Representatives March 2014 Georgia Airports Association October 14, 2015 Hot Topics for Airports Compliance Continued: Non-Aeronautical use – Last year FAA issued a policy of non- aeronautical use of aviation facilities. This policy actually takes a common sense approach to use of aviation facilities on your airport and allows for exceptions based on aviation need. Leases – It is important to charge fair market value for non aeronautical leases. FAA must review these leases prior to execution. Commercial Space – In 2015 a letter was sent to all airport sponsors of NPIAS airports asking for early coordination if interested in space activity at your airport.

Federal Aviation Administration 10 Georgia Airports Association October 14, 2015 Hot Topics for Airports Compliance Continued: Special Events – (involving temporary airport closure) Complete or Partial Closure of Airport Facility Coordinate with ADO PM through (iOE/AAA) Timely Include Safety Plan Crowd Control Plan – FSDO review – 45 days Fair Market compensation Refer to FAA Order B, Compliance Manual

Federal Aviation Administration 11 Georgia Airports Association October 14, 2015 Compliance Continued: Unmanned Aircraft Systems - Public UAS activity is provided through the Certificate of Authorization or Waiver (COA) process, which allows specific public agency and aircraft access to specific airspace during specified hours. The COA process allows UAS to be accommodated in the NAS today. Most of today’s UAS activity is by small UAS that are not runway dependent and operate from non-airport locations. To date based on language in 2012 reauthorization, we have issued approval for 6 test sites and waivers for commercial use in the film making, aerial surveying, oil and gas flare stack monitoring, and construction monitoring. The FAA has established the UAS Integration Office to provide a one- stop portal for information. Information can be found on the FAA website at Hot Topics for Airports

Federal Aviation Administration 12 Georgia Airports Association October 14, 2015 Planning Project Coordination - We can be extremely helpful in project coordination both on and off the airport, but the key in this is early coordination. –We want to ensure you do not inadvertently impact your airport with both on or off airport development. Potential impacts include – limiting future growth of your airport both physically and financially or reducing capacity through airspace restrictions –We want to make sure you are compliant with laws and regulations such as NEPA, 14 CFR part 77 and part 139; and in compliance with grant assurances. Runway Protection Zone (RPZ) – On September 27, 2012, the FAA Office of Airports issued interim guidance to clarify FAA Advisory Circular Airport Design. This guidance requests airport sponsors to provide an alternative analysis for any new or modified land use in the RPZ. Hot Topics for Airports

Federal Aviation Administration 13 Georgia Airports Association October 14, 2015 Hot Topics for Airports Planning Continued: Airports Geographic Information System (GIS) – Its Here!!! 2014: Call for all aeronautical data at Large, Medium, Small, Non-Hubs, Part 139 or Towered NP Airports. Safety Critical Data at all airports. (RWY’s, TWY’s. RSA’s, NAVAIDs, etc..) 2015: New module released in FY-15 (20:1 Surface Analysis and Visualization Tool) 2016: Two new modules currently in beta testing (Modification to Standards and eALP) Advisory Circulars 150/ , 17 & 18

Federal Aviation Administration 14 Georgia Airports Association October 14, 2015 Thank You! Atlanta Airports District Office

Federal Aviation Administration Knowing the AIP Handbook; Your Airport’s Plan for Optimal Funding Chuck Garrison, ATL ADO Assistant Manager Aimee McCormick, ATL ADO Planner & Program Manager The Airport Improvement Program (AIP) Handbook, FAA Order D Knowing the AIP Handbook; Your Airport’s Plan for Optimal Funding Georgia Airports Association Annual Conference Oct 14, 2015 Chuck Garrison, ATL ADO Assistant Manager Aimee McCormick, ATL ADO Planner & Program Manager

16 Federal Aviation Administration For Optimal Airport Funding, Know the AIP Handbook What is the Airport Improvement Program Handbook? FAA Order D, commonly called AIP Handbook. This major revision was published on September 30, 2014 and includes: –2012 FAA Reauthorization, –new policy limiting the AIP investment to specific runway safety projects for airports that do not meet NPIAS entry criteria, and –all published FAA Program Guidance Letters (PGLs) Change 1 is already underway

17 Federal Aviation Administration For Optimal Airport Funding, Know the AIP Handbook FAA Orders are traditionally internal FAA documents, but are now widely available to the public via the internet. The content of The AIP Handbook is used by ADO/ GDOT to make project eligibility, justification & funding decisions that effect Y-O-U. By sharing this information with Y-O-U, your airport development & funding plans can be improved. Who Uses the AIP Handbook?

18 Federal Aviation Administration For Optimal Airport Funding, Know the AIP Handbook Basic principles remain the same Reflects changes in funding formulas and the types of projects funded Easier to read with more tables for easy guidance Reduced cross references & duplications More explanation of legislative/ FAA policy background Changes in the Handbook

19 Federal Aviation Administration For Optimal Airport Funding, Know the AIP Handbook Basic Handbook 6 Chapters (about 240 pages) 30 Appendices (about 250 pages) Chapters 1.What do I need to know about this Order? 2.Who can get a grant? 3.What projects can be funded? 4.What AIP funding is available? 5.How does the grant process work? 6.What special AIP funding programs are available? What is the New Format?

20 Federal Aviation Administration For Optimal Airport Funding, Know the AIP Handbook Chapters 1 &2 Chapter 1, Clarifies the Basis of AIP  The Act is a Permissive Statute including only those items that can be funded.  If it doesn’t say you can, then you can’t!  It includes a warning on taking the handbook out of context stating “…legislative exceptions do not amend, change, or modify the general guidance and requirements. These exceptions do not apply to other situations and must not be taken out of context.” Chapter 2, Sponsorship & Assurances  No new changes, but expanded explanations

21 Federal Aviation Administration For Optimal Airport Funding, Know the AIP Handbook Chapter 3 - AIP Project Requirements  Eligible  Justified  On Airport Property  On Approved ALP  Intergovernmental Review  Environmental Finding  Usable Units of Work  Meets FAA Standards  Proper Procurement  All Costs Allowable  All Cost Necessary  All Costs Reasonable  Costs Incurred Post-Grant Execution  Other Federal Money  Within Federal Share  Complete Without Delay

22 Federal Aviation Administration For Optimal Airport Funding, Know the AIP Handbook Chapter 4 – AIP Funding Explains types of AIP funds and projects that can be funded based on airport size and type. Clarifies funding limitations. Clarifies federal share, including Public Land states and other statutory exceptions.

23 Federal Aviation Administration For Optimal Airport Funding, Know the AIP Handbook Chapter 5 - The Grant Process Spells out the Step-By-Step Process from Pre- Grant Actions through Close-Out including: o A new ADO grant checklist i.e. Project Evaluation Report and Development Analysis (PERADA), o Notifications to new sponsors, o Grant oversight requirements for ADO/ GDOT staff, o Rationale behind each requirement.

24 Federal Aviation Administration For Optimal Airport Funding, Know the AIP Handbook Chapter 6 – Special AIP Programs There are 9 special AIP programs:  Letter of Intent (LOI)  Innovative Financing  Energy Efficiency Enhancement  Military Airport Program (MAP)  State Block Grant  Voluntary Airport Low Emission (VALE)  Zero Emission Vehicles  Private Development Rights  Redevelopment Pilot

25 Federal Aviation Administration For Optimal Airport Funding, Know the AIP Handbook Appendices A & B Appendix A – Definitions –Relies on the law as much as possible. –Resolves AIP & PFC definitions to avoid conflict. Appendix B- References & Links –Provides a quick summary of the links & references.

26 Federal Aviation Administration For Optimal Airport Funding, Know the AIP Handbook Appendix C – Prohibited Projects & Unallowable Costs This is a new Appendix, but is not new policy. It is based on statute, past project experience & audit findings. Captures examples of past eligibility & allowable cost decisions.

27 Federal Aviation Administration For Optimal Airport Funding, Know the AIP Handbook Appendices D – T: Project Tables Includes specific project justification & eligibility AppendixProject Types DMiscellaneous – Wash racks, Fuel Farms, Obstruction Lighting, etc. E, FPlanning Projects, New Airport Projects G, H, IRunway, Taxiway, Apron Projects J, KMarking, Signage, NAVAIDs L, MSafety and Security Equipment, Other Equipment N, OTerminal Buildings, Other Buildings P, QRoads & Surface Transportation, Land Projects R, SNoise Compatibility, Environmental Projects TMilitary Airport Projects

28 Federal Aviation Administration For Optimal Airport Funding, Know the AIP Handbook Appendices D – T: Project Tables Used for AIP & PFC eligibility to ensure consistency. Use Table & Paragraph numbers to justify AIP & PFC eligibility decisions when applicable/ required. Project tables provide a virtual checklist of what is required for specific project justification & eligibility.

29 Federal Aviation Administration For Optimal Airport Funding, Know the AIP Handbook Appendix U - Procurement This appendix provides a step-by-step procurement analysis for airports/ consultants. Procurement as covered in Chapter 3 is for use by FAA/ GDOT field staff. A noncompliant procurement process is the first step to losing out on airport funds.

30 Federal Aviation Administration For Optimal Airport Funding, Know the AIP Handbook Appendix V - CC These appendices provide background & information on: –App. VForms –App. WRevenue for AIP –App. XCompetition Plans –App. YBuy American –App. ZGrant Assurances –App. AA Federal Shares in Public Land States –App. BBPolicy for ILS Installations –App. CCTransition to 2 CFR 200

31 Federal Aviation Administration For Optimal Airport Funding, Know the AIP Handbook The basic principles remain the same yet there is expanded guidance & explanation to avoid costly AIP mistakes & interpretation. So What’s Changed Exactly?

32 Federal Aviation Administration For Optimal Airport Funding, Know the AIP Handbook Some AIP Limitations Runway Identification/ Eligibility Unclassified Airport Projects Maintenance Work Pavement Maintenance Navaids/ Instrument Landing Systems (ILS) Administrative Costs Airport Police/ ARFF Vehicles & Storage Command & Control Centers Security Dogs/ Kennels & Terminal TSA Access Control Automated Weather Observation Systems Equipment Bonding, Etc. This is Not New Policy, Just Further Clarified

33 Federal Aviation Administration For Optimal Airport Funding, Know the AIP Handbook Runway Identification & Eligibility Runway work is AIP eligible but not all runways are AIP eligible.  Although runway eligibility is unchanged, Paragraph 3-11 now requires all runways be identified.  Identification is as follows: Primary Runway Crosswind Runway (wind coverage) Secondary Runway (demand capacity) If a runway does not meet the criteria for one of these, it is an Additional Runway. Additional Runways are not AIP eligible.

34 Federal Aviation Administration For Optimal Airport Funding, Know the AIP Handbook Unclassified Airport Projects Unclassified airports do not meet NPIAS entry criteria. These low-activity airports are limited to: –Primary Runway Rehabilitation (1 every 10 years) –Runway Maintenance Projects –Eligible Obstruction Removal Limited AIP funding is restricted to nonprimary entitlements or state apportionment.

35 Federal Aviation Administration For Optimal Airport Funding, Know the AIP Handbook Table 3-2 describes the differences between project maintenance, rehabilitation, reconstruction, and replacement. Table 3-3 includes project examples & their eligibility. Table 3-4 aids in determining project justification and eligibility. These tables help Y-O-U evaluate your projects early for successful justification, eligibility and potential funding. Defining Maintenance Work

36 Federal Aviation Administration For Optimal Airport Funding, Know the AIP Handbook Pavement Maintenance As found in Table 3-2(a), maintenance work is not considered Airport Development as defined in the Act and is therefore NOT AIP eligible EXCEPT... for routine runway, taxiway, & apron pavement maintenance at nonhub primary & nonprimary airports. Typical pavement maintenance includes routine cleaning, filling and/ or sealing of longitudinal & transverse cracks; grading pavement edges; maintaining pavement drainage systems; patching pavement; and remarking pavement areas. Pavement maintenance is AIP eligible when justified for all NPIAS airports in Georgia with the exception of 3 airports.

37 Federal Aviation Administration For Optimal Airport Funding, Know the AIP Handbook Navaid Minimum Standards & ILS’s The new Handbook contains updated minimum standards that must be met to decide that a NAVAID is justified. In December 2011, the FAA published a Federal Register Notice advising that ATO is no longer installing Cat I ILS. Neither ATO nor AIP have installed an ILS in over a decade. Due to lower costs & near-equivalent minimums, RNAV approaches are the new replacement for a CAT I ILS. FAA will no longer install an ILS without an ATO determination that a satellite approach will not work.

38 Federal Aviation Administration For Optimal Airport Funding, Know the AIP Handbook Obstruction Clearing  Grant Assurance # 13, Operations and Maintenance, states the responsibility of the airport sponsor to maintain and protect approaches.  The AIP Handbook defines the eligibility and limitations of obstacle clearing vs. maintenance.  FAA Memo, Reminder of Responsibilities for FAA Personnel and Airport Sponsors for Protecting Approach and Departure Surfaces, dated August 18, 2015 reminds us all of these shared safety critical responsibilities. Obstruction Clearing is FAA’s latest National Priority

39 Federal Aviation Administration For Optimal Airport Funding, Know the AIP Handbook Obstruction Clearing Know your approach/ departure surfaces Use existing data to analyze critical surfaces (AGIS, GDOT) Plan for early mitigation (inventory, environmental, acquisition) Use AGIS Tool (its free) to upload, coordinate and track your mitigation plan with FAA (Required for FY17-19) Know your restrictions/ resources AIP/ state funds may not be available due to previous grants, critical timing/ funding cycle, other project priorities. Airports are often restricted by off-airport property owners, environmental impacts, unknown legal data, resources, etc. Implement a proactive, local management plan Adopt/ enforce Airport Protection Zones tied to local development permitting Request local dedicated airport funds to manage obstructions and protect from liability

40 Federal Aviation Administration For Optimal Airport Funding, Know the AIP Handbook To improve funds planning, FAA/ GDOT are requiring Y-O-U to provide more detailed project information with CIPs & Preapplications. With the introduction of GDOTs Aviation System Manager (ASM), Y-O-U will be required to code and prioritize their projects using a similar process to that of the ADO. Y-O-U will be required to properly define your projects, assign work codes, provide justification and prioritize projects that ultimately determines funds eligibility and program placement. The better Y-O-U become at understanding and applying AIP Handbook applications to strategize your project needs, the more likely you will be at successful funding. Why Y-O-U Need The AIP Handbook

41 Federal Aviation Administration For Optimal Airport Funding, Know the AIP Handbook Stay Calm & Plan On Chuck Garrison, ATL ADO Assistant Manager Aimee McCormick, ATL ADO Planner & Program Manager

42 Federal Aviation Administration For Optimal Airport Funding, Know the AIP Handbook GIS - Construction vs. Planning AIP funded construction projects currently require a GIS As-Built end product for upload/ approval into the FAA’s Airports GIS (AGIS) database BEFORE project completion and final drawdown. AIP funded planning/ environmental projects are being encouraged by HQ, but there is confusion regarding commitment and costs to participating airports. Once GIS, always GIS. If you cannot keep a 100% commitment to GIS based work, don’t propose it! All planning/ environmental GIS scopes require prior approval by the ADO within the AGIS system. All GIS project data must be properly formatted for final upload/ approval into AGIS as final project product. GIS project data not deposited/ managed in FAA’s AGIS system is not eligible. Hardware, software, training nor data management are eligible.