Welcome to the Manage Flood Mapping – Distributing Preliminary Map Products module of the “MIP Release 3 Study Workflow Training” course! This module guides.

Slides:



Advertisements
Similar presentations
SAM 2007 v4 The Student Experience Including SAM Projects, SAM Exams and SAM Training.
Advertisements

MIP Workbench: Revisions FEMA Learning Management System FEMA REVISION LEAD.
MIP Workbench: Revisions FEMA Learning Management System Audit Lead.
MIP Workbench: Revisions FEMA Learning Management System FEE ADMINISTRATION ROLE.
Page 1 of 21 This module will describe the procedure for a Metis Bid Request and how to upload the Metis supporting documentation. Welcome To the ETS –
2 eGrants Coaching Unit 3 create/edit Service Opportunity Listings Grantee Recruiter search for listings, register, & apply to serve Applicants view.
TFACTS Private Provider Financial/Invoicing Overview 1.
Self-paced study guide for Online Performance Evaluations – Detailed steps for Employee Self-evaluation.
Self-paced study guide for Online Performance Evaluations.
Edgecombe County Public Schools Schoolnet Assessment Training (HOME BASE) November/December 2013 Accountability Services ( ) 1.
Homepage To learn about eLOMA click on the ‘Learn about eLOMA’ link under the Tools For Professionals.
Welcome to the Manage Quality Assurance module of the “MIP Release 3 Study Workflow Training” course! This module guides you through the process of managing.
Health and Wellness for all Arizonans Bureau of EMS and Trauma System Secure, Encrypted, On-Line EMS Services System 2015 Training Programs System Instruction.
SP14 Producer Training. Welcome  Welcome  Introductions  Classroom Protocol  Agenda.
MANAGE PRE-SCOPING MIP Home. Manage Pre-Scoping/SS03 SS03 “Pre-scope project: Pre-scoping checklist”  This is the pre-scoping checklist. The goal of.
MIP Workbench: Revisions FEMA Learning Management System PROJECT ADMINISTRATION ROLE.
Welcome to the Manage Flood Mapping – Setup Map Production module of the “MIP Release 3 Study Workflow Training” course! This module guides you through.
Moodle (Course Management Systems). Assignments 1 Assignments are a refreshingly simple method for collecting student work. They are a simple and flexible.
Nipissing’s ROMEO e-System Internal Research Funding (IRF) Internal Research Grant Application Form (IRG)
Welcome to the Manage Revalidation module of the “MIP Release 3 Study Workflow Training” course! This module guides you through the revalidation process.
MIP Workbench: Revisions FEMA Learning Management System TASK LEAD ROLE MODULE.
Welcome to the Manage Scoping module of the “MIP Release 3 Study Workflow Training” course! This module guides you through the process of managing the.
The Basics of the Effort Certification and Reporting Technology (ECRT) System.
101 P C O L S Role: A/OPC How to Complete Your A/OPC User Profile in AIM I N T E R A C T I V E T U T O R I A L.
MIP Workbench: Revisions FEMA Learning Management System PROJECT LEAD.
Welcome to the Create Project module of the “MIP Release 3 Study Workflow Training” course! This module guides you through the process of creating study.
1 MIP Sequencing Tool Training Introduction to the Sequencing Tool.
Susan G. Komen Central Wisconsin Affiliate Komen Grants eManagement System GeMS Community Grants Application Training October 2015.
Komen Grants eManagement System GeMS. Why Online Grants  Reduce the amount of administrative paperwork being completed by applicants and grantees. 
Module Table of Contents (By Section) Produce Preliminary Map Products Citrix Web Interface & Load Data Artifacts Validate Content Submission Perform Independent.
MIP Workbench: Revisions FEMA Learning Management System REVISION RESOURCE MANAGER.
Flood Map Modernization 1 1 MIP: SOMA. Flood Map Modernization 2 2 SOMA APPLICATION IN MIP MIP HOME PAGE.
Staff Module and Summary of Changes 1. Icon Changes: Page 3 Signing In and Password/Pin Changes: Page 4 Logging Out: Page 8 Staff Module Changes: Page.
Page 1 of 42 To the ETS – Create Client Account & Maintenance Online Training Course Individual accounts (called a Client Account) are subsets of the Site.
UNCLASSIFIED – For Official Use Only 1 Contract Load Notification “Fly-in” Action ( Continue to Page Down/Click on each page…) Electronic Document Access.
2/17/ TimeTrex Your Guide to Better Time Tracking.
Staff Module and Summary of Changes 1. Icon Changes: Page 3 Signing In and Password/Pin Changes: Page 4 Logging Out: Page 8 Staff Module Changes: Page.
Review Data Received/ADR Click on the Workbench link to open up your Work Item List. To work on an Activity you must first click the Claim button.
Turn It In Getting Started. Access and click on Create an Account.
Completing the Contracts Module for PEPPM-Generated Contracts Complete this task BEFORE beginning a Form 471. Julie Tritt Schell PA E-rate Coordinator.
From the Workbench click the Create Project tab..
Completing the Contracts Module Complete this task BEFORE beginning a Form 471 if you are requesting funding for a contracted service. Julie Tritt Schell.
Editor Guide: Sending Author Revision Reminders in Editorial Manager™ Created by J. Strusz 06/01/2011.
American Diploma Project Administrative Site Training.
PEOPLESOFT 101 October 27, INTRODUCTION The detailed business process for reconciling/approving PCard transactions (including uploading documentation)
Welcome to the Manage Flood Engineering module of the “MIP Release 3 Study Workflow Training course! This module guides you through the process of obligating.
Project Management: Messages
Welcome! To the ETS – Create Client Account & Maintenance
Student Registration/ Personal Needs Profile
To the ETS – Agreement Management Online Training Course
Student Registration/ Personal Needs Profile
Moving Students Between Sessions
MyGaDOE Portal Provisioning for Security Officers
Critical Warnings and Alerts
Students Welcome to “Students” training module..
Orders & Shipment Tracking
Centene’s Broker Online Self Service Tool User Guide
Fantastic Graphics Inc. 2017
For Computer-Based Testing
Assign Courses New – Group administrators can now assign courses to their staff NEW FEATURE: Training Coordinators can now assign courses to their staff.
Adding Students With A Temporary ID
To the ETS – Agreement Management Online Training Course
For Computer-Based Testing
Student Registration/ Personal Needs Profile
Moving Students Between Sessions
Student Registration/ Personal Needs Profile
Student Registration/ Personal Needs Profile
Building a healthy nation is what we do. Sidra Supplier Bid Submission.
Permit Tracking Events
Presentation transcript:

Welcome to the Manage Flood Mapping – Distributing Preliminary Map Products module of the “MIP Release 3 Study Workflow Training” course! This module guides you through the process of verifying outreach activities, distributing preliminary map products, and setting up post preliminary processing for study projects. Only authenticated users with a Preliminary Map Products Task Lead and Study Project Administrator role can manage these tasks. Training manual users will find workflow and role diagrams throughout the modules. Web-based users, may click on the “View Workflow” and “View Role” buttons to see where you are in the workflow and role descriptions with associated organization types. Module Table of Contents Verify Outreach Activities Distribute Preliminary Map Products Setup Post Preliminary Processing Self Quiz Where are you in the Workflow? MANAGE FLOOD MAPPING – DISTRIBUTING PRELIMINARY MAP PRODUCTS

The Verify Outreach Activities screen allows the Preliminary Map Products Task Lead to identify the outreach activities that have been completed prior to distributing the preliminary maps. Check the required boxes to indicate that FEMA/NSP have been contacted to determine the required level of community outreach support and that coordination with the appropriate FEMA/NSP regional staff has occurred. Reminder: Online Help content provides assistance to users and is available throughout the MIP. Throughout this module the role performing the activity and a numerical or descriptive identifier for the screen are displayed in bold on the bottom left and right hand corners of the screen shot to the right. MANAGE FLOOD MAPPING Manage Flood Mapping ROLE: Preliminary Map Products Task Lead Description of Role: Responsible for producing the preliminary map products and outreach. Organization Type: Assigned Prelim Org. Any org type could register to do this task. SI00 Verify Outreach Activities (coordinate with MOD-HQ and FEMA) Preliminary Map Products Task LeadSI00 Where are you in the Workflow? Verify Outreach Activities

(Continue) Use the drop-down lists to indicate which method of communication was used to alert each group to the issuance of the preliminary maps. Note: Clicking the Save Work button will save the data a user has entered; however, a user can not save a screen that is only partially completed. For all study workflow tasks, there will be a Review screen (where all task information entered can be reviewed) and a Complete Task screen. MANAGE FLOOD MAPPING SI00 Preliminary Map Products Task Lead Verify Outreach Activities

The Distribute Preliminary Map Products screen allows you to enter the date the preliminary maps were mailed. This should be the same date that was stamped on the preliminary map panels. This date is used for calculating KPI1 and starts the 30-day comment period. For each community, indicate if the new preliminary maps have any BFE changes, whether advanced copies were sent prior to the preliminary date, and to whom the copies were sent. Make a list of the recipients of advanced copies. Click “Add Community” and repeat for each community. MANAGE FLOOD MAPPING Preliminary Map Products Task LeadSI01 Manage Flood Mapping ROLE: Preliminary Map Products Task Lead Description of Role: Responsible for producing the preliminary map products and outreach. Organization Type: Assigned Prelim Org. Any org type could register to do this task. SI01 Distribute Preliminary Map Products (and preliminary SOMA). Where are you in the Workflow? Distribute Preliminary Map Products

(Continued) For each community, indicate if the new preliminary maps have any BFE changes, whether advanced copies were sent prior to the preliminary date, and to whom the advanced copies were sent. Also, enter to whom the preliminary maps were distributed (this field is required but does not have to be the same person/location you provided for the advanced copies). This data will be saved to the MIP and allows you to keep a list of the recipients of the preliminary maps. Click “Add Community” and repeat for each community. MANAGE FLOOD MAPPING Preliminary Map Products Task LeadSI01 Bottom Distribute Preliminary Map Products

The Setup Post Preliminary Processing screen allows the Study Project Administrator to authorize post preliminary processing activities if the task was not funded during the “Obligate Project Funds” task. Select the type of organization (e.g. CTP) and the organization responsible for post preliminary processing of the selected study project area (usually performed by MOD HQ). Correct selection of “Organization Type” and “Organization Name” ensures the post preliminary processing tasks will be routed to the Work Item List of the appropriate post preliminary task lead(s) of that organization. Enter the baseline “Start Date” and “End Date,” and “Cost” information, for the post preliminary processing tasks. Click “Add Cost” and repeat for each negotiated cost. MANAGE FLOOD MAPPING Manage Flood Mapping ROLE: Study Project Administrator Description of Role: Responsible for initiating new projects (i.e., entering all required information about project geography, responsible organization, cost, and schedule) and updating the cost and schedule information throughout the project. Organization Type: Same org that completed SM01. ModRMC, ModHQ, FEMARegion, or FEMA HQ could register to do this task. SP01 Set up post preliminary processing (if post prelim was not funded) Study Project Administrator SP01 Where are you in the Workflow? Setup Post Preliminary Processing

(Continued) Important Note: The “End Date” for post preliminary processing should be the projected effective date. Note: Independent QA for the final map product is always performed by the NSP, therefore no QA contract information needs to be entered. After the post preliminary processing task has been set up, the “Determine Community Meeting Schedule” task will appear on the Pre-Appeal Study Task Lead(s) Work Item List of that selected organization. Take the time to complete the short Self Quiz on the following page before proceeding to the next training module. MANAGE FLOOD MAPPING Study Project AdministratorSP01 Setup Post Preliminary Processing

1. Prior to distributing the preliminary maps, FEMA/NSP must be contacted to determine the required level of community outreach support. True or False 2. There is a 60-day comment period which begins on the date the preliminary maps are mailed. True or False This concludes the Manage Flood Mapping – Distributing Preliminary Map Products module of the “MIP Release 3 Study Workflow Training” course. Please proceed to the next module in the course, Manage Post Preliminary Processing – Community Meeting and Appeal Determination.MIP Release 3 Study Workflow Training MANAGE FLOOD MAPPING Self Quiz Answers: 1. True, 2. False Self Quiz