Delayed Product Differentiation

Slides:



Advertisements
Similar presentations
What other terms can you think of when talking about Procurement and Inventory Management?
Advertisements

McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc. All rights reserved. 3-1 BUSINESS DRIVEN TECHNOLOGY Business Plug-In B3 Supply Chain Management.
Dr. A. K. Dey1 Inventory Management, Supply Contracts and Risk Pooling Dr. A. K. Dey.
MBPF1 Managing Business Process Flows: Supply Chain Management Module Managing the Supply Chain Economies of Scale (Chapter 6) Managing Flow Variability:
Managing Uncertainty in a Supply Chain: Safety Inventory
Inventory Control, Cost & Deterministic models Unit-III Revised version.
PowerPoint presentation to accompany Chopra and Meindl Supply Chain Management, 5e Global Edition 1-1 Copyright ©2013 Pearson Education. 1-1 Copyright.
Delayed Product Differentiation
Topic 3: Variety Postponement September Agenda for the day: 1. Review assignment and lecture on postponement. 2. Hewlett Packard Case.
Hewlett-Packard: DeskJet Printer Supply Chain
Supply Chain Operations: Planning and Sourcing
DEMAND VARIABILITY IN SUPPLY CHAINS Eren Anlar. Literature Review Deuermeyer and Schwarz (1981) and Svoronos and Zipkin (1988) provide techniques to approximate.
Global Manufacturing and Materials Management
Design for Supply Chain Management Phil Kaminsky David Simchi-Levi Philip Kaminsky Edith Simchi-Levi.
Coordinated Product and Supply Chain Design
Supply Chain Drivers and Metrics
1 Managing Flow Variability: Safety Inventory Centralization and ROP At- Ft; Decentralized vs. Centralized.
LOGISTICS OPERATION Industrial Logistics (BPT 3123)
1 Managing Flow Variability: Safety Inventory Centralization and ROP.
9. Coordinated Product and SC Design Case: HP Desk-jet Printer Supply Chain (Read pages ) HP-founded in 1939 Electronic test and measurement equipment.
Chapter 9 Design for Supply Chain Management
Design for Logistics Chap 08 王仁宏 助理教授 國立中正大學企業管理學系 ©Copyright 2001 製商整合科技中心.
Designing & Managing The Supply Chain
Postponement How to respond to demands for –Customized products –Rapid delivery –Competitive prices in the face of short product lifecycles.
Slides 8 Integrating Supply Chain and Development Chain
Chapter 3 Network and System Design. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Understand.
ISQA 407 Introduction to Global Supply & Logistics Management Winter 2012 Portland State University.
Introduction to Materials Management
Global supply chain problem. Different Cases (CASE-1) In March 2000, a serious fire at the plant destroyed critical production equipment. Within three.
Inventory/Purchasing Questions
Supply Chain Integration Class 11: 4/6/11. I NTRODUCTION Effective SCM implies: Efficient integration of suppliers, manufacturers, warehouses, and stores.
Slides 6 Distribution Strategies
1 Challenges in Managing Supply Chains Vinod R. Singhal Scheller College of Business Georgia Institute of Technology Atlanta, GA, 30332
Managing Uncertainty in Supply Chain: Safety Inventory Spring, 2014 Supply Chain Management: Strategy, Planning, and Operation Chapter 11 Byung-Hyun Ha.
HP DeskJet Case: Background  High volume, high speed manufacturing in Vancouver  Many different models, all completed in Vancouver  Three distribution.
Supply Contracts with Total Minimum Commitments Multi-Product Case Zeynep YILDIZ.
Chapter 14 Global Production, Outsourcing and Logistics 1.
“Make to order - Make to Stock Production Systems By: ÖNCÜ HAZIR.
Inventory Management FIN 340 Prof. David S. Allen Northern Arizona University.
Chapter McGraw-Hill/Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. Risk and Capital Budgeting 13.
Inventory Management and Risk Pooling (1)
ElecComp Case Large contract manufacturer of circuit boards and other high tech parts. About 27,000 high value products with short life cycles Fierce competition.
Multi-item Location Inventory Models
1 Managing Flow Variability: Safety Inventory Centralization and ROP A key component has a cost c = 10, holding cost h (for the period) = 1, salvage value.
Intelligent Supply Chain Management Strategic Supply Chain Management
S UPPLY CHAIN MANAGEMENT B Y S HEETAL G AIKWAD. CONTENTS Introduction to supply chain Supply chain of WAL-MART Supply chain objective Supply chain management.
Modeling the Costs and Benefits of Delayed Product Differentiation Eren Anlar.
Northern Illinois University Department of Technology Shun Takai
Computerized Beer Game
Chapter 2 Supply Chain Performance: Achieving Strategic Fit and Scope
Homework 1- Gateway.
BIA 674 supply chain analytics Lecture 2b
Chapter 16: Global Sourcing and Procurement
Supply Chain Management
Distribution Strategies
Inventory Fundamentals
Chapter 3 Supply Chain Drivers and Obstacles
Strategic Capacity Management
Chapter 3 Supply Chain Drivers and Obstacles
Challenges in Managing Supply Chains
Managing Short-Term Assets
Chapter 2 Supply Chain Performance: Achieving Strategic Fit and Scope
Chapter 3 Supply Chain Drivers and Obstacles
Fulfilling omni-channel demand Designing a Distribution Network
Chapter 3 Supply Chain Drivers and Metrics
PURCHASING MANAGEMENT
Chapter 3 Supply Chain Drivers and Obstacles
Chapter 2 Supply Chain Performance: Achieving Strategic Fit and Scope
Building Competitive Advantage Through Functional-Level Strategies
Inventory Fundamentals
Presentation transcript:

Delayed Product Differentiation Ahu SOYLU

Outline Definition of Delayed Product Differentiation Literature Review Proposed Methodology

Introduction Firms have to increase product variety in order to be profitable in the market. Increased product variety makes predicting demand extremely difficult Forecast errors are much greater at individual product level than at aggregate level As product variety increases, the likelihood of correlation among product forecasts increases, making forecasting more difficult.

Difficulties Deciding how much inventory to carry Predicting equipment capacity requirements Forecasting component requirements Increase in the number of suppliers Shorter product life cycles Increased variability makes inventory, equipment capacity, component, supplier and product changeover management more difficult.

The Challenge To minimize the extent in which product variety increases variability in the operating environment. Standardization is the answer. Swaminathan(2001) describes four standardization approaches.

Standardization Approaches Non-Modular Modular Product Part Standardization Maximize component commonality across products Process Standardization Delay customization as late as possible Product Standardization Carry a limited number of products in the inventory Procurement Standardization Leverage equipment and part commonality across parts Non-modular Modular Process

Standardization Approaches Delayed product differentiation benefits the manufacturers by, Increasing their flexibility by enabling them to commit their WIP to a particular product at a later time Decreasing their costs of complexity by reducing the variety of components and processes within the system. Process Standardization Delay customization as late as possible

Delayed Product Differentiation Multiple end-products may share some common components or processes at initial stages. At some point, specialized components or processes are then used to customize WIP into different end products. Common operations 1 2 k

Literature Review The concept of delayed product differentiation was first introduced in the marketing literature by Alderson (1950). Shapiro and Heskett (1985), Zinn and Bowersox (1988), Zinn (1990), van Doremalen and Zinn(1991) Lee et al.(1993) exemplified delayed product differentiation by means of deferring the localization process for the deskjet printer at Hewlett-Packard.

Lee et al. (1993) Inventories are kept in finished goods form. North American DC Inventories are kept in finished goods form. With factory localization, because of long lead time, the DCs had limited ability to respond to fluctuations in the demand for different versions of the product. With DC localization –a generic product customized at DCs- a reduction of 18% in total inventory investment was achieved. Vancouver Plant European DC 1 month 1 month Far East DC

Literature Review Lee (1994) showed that inventory savings are greater when the demands for different products are negatively correlated. Lee (1996) described a model for capturing inventory reduction in an adaptation of multi echelon system. The model assumes no buffer stocks, the inventory reduction comes from finished goods inventory.

Literature Review Lee and Tang (1997) developed a model which complements Lee’s(1996) model in the following ways: Holding inventories at different points is allowed Not only decrease in the finished goods inventory but also other factors (i.e. design cost, processing cost, inventory cost, lead times) were also examined Specific approaches such as standardization, modular design and process restructuring are examined.

Basic Approach Redesign Process for Delaying Product Differentiation Conditions for Effectiveness Standardization Design a part that is common to all products. Effective when the investment cost and incremental processing cost required for the standardization are low. Modular Design Divide a part into 2 modules-the first module is a common part and the assembly operation of the second module is deferred. The number of modules increases. However, this approach is effective when the incremental lead time, incremental processing cost and unit inventory holding cost are low. Process Restructuring: Postponement of Operation Divide an operation into 2 steps- the first step is common to all products and the execution of the second step is postponed Effective when the lead time of the common step is significantly longer than the second step that is being delayed. In addition, this approach is effective when the second step is a high value added activity Process Restructuring: Reversal of Operations Reverse the order of 2 operations. As a result, the first operation is common to all products. Effective when deferring the high value-added operation by reversing the operations

Literature Review Garg and Tang (1997) are first to examine delayed product differentiation with multiple points of differentiation. The effects of early and late postponements are examined in both centralized-single decision maker for WIP and finished goods- and decentralized control models. Product Differentiation Point T1 T2 T3 Family Differentiation Point

Multiple Points of Differentiation In centralized control model; Both early and late postponements results in inventory savings which increase as the amount of time by which the point of differentiation delayed is increased. Early postponement is preferred when the demand correlation is high. In decentralized control model; Lead times determines the decision of early or late postponement. If T2<T1, early postponement, if T3<T2 late postponement is beneficial. If T1>T2>T3 both early and late postponement are beneficial.

Literature Review Aviv and Federgruen (2001) examine the design for postponement concept under unknown demand distributions. Yan et. al. (2002) examine the effect of sequencing and merging operations on the reduction of safety stocks. Further research is welcomed on models covering other cost factors with less assumptions.

Proposed Model The model I propose incorporates both the benefits of delayed product differentiation and supply contracts. The product is shipped to the retailers without customization. The retailer is equipped with the customization knowledge and performs the customization step. The manufacturer takes the unsold goods back at the end of the period. The benefits of risk pooling are also put in use.

Proposed Model The manufacturer is supplied with full information on demand patterns. The centralized control benefits can be achieved with supply contracts. The returned goods to manufacturer can be shipped to another retailer or customized. Generic Products Manufacturer Retailers

Proposed Model The reliability between the retailer and the manufacturer should be high in order to prevent technology. The setup cost of customization should be small, customization step should be easy to perform.

Questions & Answers