Development of Pixel Phase 2 chip. Goals New Pixel Chip needed to go beyond the Phase 1 baseline chip – Should be the solution for Phase 2 pixel – Should.

Slides:



Advertisements
Similar presentations
Phase 2 pixel challenges  ATLAS and CMS phase 2 pixel upgrades very challenging  Very high particle rates: 500MHz/cm 2  Hit rates: 1-2 GHz/cm 2 (factor.
Advertisements

Report on INFN activities CHIPIX65 - project
Chip Developments of the Bonn Group Hans Krüger, Bonn University -1-
LHCb Upgrade Overview ALICE, ATLAS, CMS & LHCb joint workshop on DAQ Château de Bossey 13 March 2013 Beat Jost / Cern.
Jorgen Christiansen on behalf of RD53
Design Tools, Flows and Library Aspects during the FE-I4 Implementation on Silicon Vladimir Zivkovic National Institute for Subatomic Physics Amsterdam,
Status of 65nm foundry access for Aida June 2013 A. Marchioro CERN/PH-ESE.
ATLAS/CMS/LCD RD53 collaboration: Pixel readout integrated circuits for extreme rate and radiation LHCC status and outlook report June Jorgen Christiansen.
Status of opto R&D at SMU Jingbo Ye Dept. of Physics SMU For the opto WG workshop at CERN, March 8 th, 2011.
R. Kluit Electronics Department Nikhef, Amsterdam. Integrated Circuit Design.
1 Conceptual design adopts state-of-the-art silicon sensor techniques (compare ATLAS/CMS/ALICE inner tracker layers, BaBar tracking of B mesons). Design.
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 Michał Bochenek Work Package 3: On-Detector Power.
ATLAS – CMS RD collaboration: Pixel readout integrated circuits for extreme rate and radiation The “pixel 65” collaboration 1.
L1 Pixel Trigger: Is 20 us Latency Achievable? David Christian Fermilab April 29, 2015.
CHIPIX65/RD53 collaboration
TALENT Status and Future 16/07/14H.Pernegger, M.Capeans1.
M. Lo Vetere 1,2, S. Minutoli 1, E. Robutti 1 1 I.N.F.N Genova, via Dodecaneso, GENOVA (Italy); 2 University of GENOVA (Italy) The TOTEM T1.
Pixel hybrid status & issues Outline Pixel hybrid overview ALICE1 readout chip Readout options at PHENIX Other issues Plans and activities K. Tanida (RIKEN)
FF-LYNX (*): Fast and Flexible protocols and interfaces for data transmission and distribution of clock, trigger and control signals (*) project funded.
Work Package 3 On-detector Power Management Schemes ESR Michal Bochenek ACEOLE Twelve Month Meeting 1st October 2009 WPL Jan Kaplon.
CSC ME1/1 Upgrade Status of Electronics Design Mikhail Matveev Rice University March 28, 2012.
Advanced Semiconductor Technologies for SLHC A. Marchioro / PH-ESE.
Common ATLAS/CMS Electronics Workshop March, 2007 W. Dabrowski Atlas ABCNext/SiGe W. Dabrowski Faculty of Physics and Applied Computer Science AGH.
PHASE-1B ACTIVITIES L. Demaria – INFN Torino. Introduction  The inner layer of the Phase 1 Pixel detector is exposed to very high level of irradiation.
Jorgen Christiansen, CERN PH-ESE 1.  Spokes persons and Institute chair elected ◦ SP’s: ATLAS: Maurice Garcia-Sciveres, LBNL CMS: Jorgen Christiansen,
AMS HVCMOS status Raimon Casanova Mohr 14/05/2015.
M. Letheren, LECC 1 June 2001; Status of RD49 and COTS; objectives of one day review1 Status of RD49 and COTS and objectives of a one-day review RD49 -
65 nm CMOS analog front-end for pixel detectors at the HL-LHC
RD53 Status Report – July 2014 L. Demaria - Report on RD53 - CMSTK week
RD53 IP WG 1 Jorgen Christiansen / PH-ESE. IP WG agenda General Issues IP block matrix (no recent changes) General schedule Specifications of IP blocks.
BTeV Hybrid Pixels David Christian Fermilab July 10, 2006.
Special Focus Session On CMOS MAPS and 3D Silicon R. Yarema On Behalf of Fermilab Pixel Development Group.
INFN Activities on Pixel Phase 2 Electronics L. Demaria on behalf of INFN institutes: Bari, Padova, Pavia/Bergamo, Perugia, Pisa, Torino 1/28/2014 L.Demaria:
EUDET-MICELEC Status Report October 2007 A. Marchioro / CERN-PH.
Links from experiments to DAQ systems Jorgen Christiansen PH-ESE 1.
Round Table discussion We prepared single slides covering –Power –Control/links –Tracker Architectures –Technologies –Trigger/DAQ –Design Libraries –Frameworks.
ASIC Building Blocks for Tracker Upgrade A. Marchioro / CERN-PH-ESE October, 2009.
WP3 Microelectronics and interconnection technology
CERN MIC Support for HEP Microelectronics Designers A. Marchioro / CERN-PH EUDET Meeting - December 14 th 2005.
EMCal Sensor Status (* M. Breidenbach*,
Electronics Preparatory Group 6 June Events which happened  Meeting of all the conveners of working groups 
Electronics for HL-LHC trackers NB: Only considering silicon trackers Jorgen Christiansen CERN/PH-ESE Acknowledgements to all my tracker colleagues from.
Opto Working Group Meeting Summary Tuesday 8 March 2011 Tobias Flick and Francois Vasey.
MUX-2010 DISCUSSION : W HAT DO WE NEED NEXT IN HEP.
Geoff HallLECC LHC detector upgrades Introductory comments on electronic issues Organisation of this short session.
VMM Update Front End ASIC for the ATLAS Muon Upgrade V. Polychronakos BNL RD51 - V. Polychronakos, BNL10/15/131.
Jorgen Christiansen, CERN PH-ESE 1.  EPIX ITN proposal did not get requested EU funding ◦ CERN based proposals did very bad this time. ◦ I better not.
Status report Pillar-1: Technology. The “Helmholtz-Cube” Vertically Integrated Detector Technology Replace standard sensor with: 3D and edgeless sensors,
Jorgen Christiansen, CERN PH-ESE 1.  Finally officially part of CERN grey book: Recognized experiments  Spokes persons and Institute chair elected 
Microelectronics for HEP A. Marchioro / CERN-PH-ESE.
RD53 1.  Full/large demonstrator chip submission ◦ When: 2016 A.Early 2016: If chip must have been fully demonstrated in test beams for TDRs to be made.
R. Kluit Electronics Department Nikhef, Amsterdam. Integrated Circuit Design.
LPNHE - Serial links for Control in 65nm CMOS technology - 65nm CMOS - Higher density, less material, less power - Enhanced radiation hardness regular.
The BTeV Pixel Detector and Trigger System Simon Kwan Fermilab P.O. Box 500, Batavia, IL 60510, USA BEACH2002, June 29, 2002 Vancouver, Canada.
Elia Conti on behalf of the RD53 Collaboration RD53: status and main activities for 2016 ACES 2016 – Fifth Common ATLAS CMS Workshop for LHC Upgrades –
R. Kluit Nikhef Amsterdam ET Nikhef Electronics Technology TGL Ruud Kluit 118-Apr-16.
H. Krüger, , DEPFET Workshop, Heidelberg1 System and DHP Development Module overview Data rates DHP function blocks Module layout Ideas & open questions.
R&D for SLHC detectors at PSI and Geneva CHIPP workshop on the high-energy frontier of particle physics Zürich 6. September 2006 R. Horisberger (Paul Scherrer.
FE-I4 chip development status ATLAS Upgrade, R.Kluit.
Verification Environment for a Simple Pixel Chip Model Pixel Phase 2 Electronics Meeting during TK Week – E. Conti *, P. Placidi *, S. Marconi.
Technology and R&D Summary and next steps Burkhard Schmidt.
RD53 status and plans. Pixel readout integrated circuits for extreme rate and radiation 4th LHCC status report Jorgen Christiansen and Maurice Garcia-Sciveres.
Possible contribution of Pisa on pixel electronics R&D
Design of the 64-channel ASIC: status
WP microelectronics and interconnections
Access to 65nm Technology through CERN
Valerio Re (INFN-Pavia) on behalf of the RD53 collaboratios
SVT – SuperB Workshop – Frascati Sept. 2010
Perugia SuperB Workshop June 16-19, 2009
Presentation transcript:

Development of Pixel Phase 2 chip

Goals New Pixel Chip needed to go beyond the Phase 1 baseline chip – Should be the solution for Phase 2 pixel – Should be ready for use at a Layer 1 replacement of Pixel Phase 1 detector This will have to be decided ~2016 – Requests: Improved radiation hardness ~ 1 Grad Improved data rate capability of the ROCs ~ 1 GHz/cm 2 Increased granularity, i.e. smaller pixels~(25-50)x100 um 2 Considering New trigger functionalities: – Selective readout or self-triggering

New Pixel Chip Development Baseline technology CMOS 65nm CMS Groups (present) – Torino, FNAL, CERN started – Perugia, Pisa starting – Interest of: Bari, Genova, Lisbona, Padova (via EPIX) Short Timeline – MPW submissions FALL 2013: first submission on analog  TORINO+FNAL (?) – Final prototype for 2017 Sinergies and fundings – EU Initial Training Network (ITN): EPIX -answer in April Financed a total of 40 man years CMS with 12 man years (of which INFN: 9 – R&D collaboration with ATLAS Pixel Torino only INFN covering analog electronics – PRIN 2012: H-TEAM

65nm technology – Frame contract in place ~end March – Defining multi-party NDA agreement Allowing designs to flow between: Foundry Broker CERN Institutes (EU) Institutes (US) – Then Design kit development with VCAD, Digital libraries (with ~1 at layout level) Rad rad memory generator Rad tol tests – New extended test structures back from production – Radiation test program for 1Grad/ Neu/cm 2 to be discussed with pixel phase 2 community Test structures can be given to institutes ready/willing to make radiation test 65nm designs – Clic pix has just gotten back a 64x64 array of 25x25um pixel prototype chip (analog + digital). 6 weeks turn-around ! Testing of chip plus test with sensor planned for coming months – High speed serializer prototype System Verilog training at CERN in the planning 4 CERN news/status/plans

First attempt to get ATLAS and CMS Phase 2 hybrid pixel Readout ASIC communities to work/talk together – Very similar requirements: Rates, radiation, pixel size, triggering, possible ROI, readout – Using same ASIC technology: 65nm CMOS – Both communities short of chip design resources (manpower and money) – Agrees that it is better to work together where possible/appropriate. 2 day Workshop: – Very good and interesting exchange between the two communities. – We want to have such a workshop again: ~ every year – Potential for common work: Technology and radiation qualification: Very good – Booth communities “worried” about radiation qualification up to 1Grad. Analog: – Pixel front-end: Possible but not obvious – Other blocks (DACs, monitoring ADC, PLL): Possible Digital: – Possibility for common architecture simulation and verification framework Common chips: Common submissions of test chips: Yes – Common final chip: Unlikely but time will show – Investigating option of making R&D collaboration on electronics (ASIC’s) for very high rate pixel detectors: ATLAS, CMS and possibly CLIC EPIX funding will make such a collaboration easier – Agenda: 5 ATLAS – CMS pixel 65nm workshop

Forming Groups: – CMS : Torino, Perugia, Pisa, Padova, Fermilab, CERN, PSI – ATLAS: NIKHEF, Bonn, CPPM-Marseille, LBNL, UCSC ATLAS and CMS phase 2 pixel readout ASIC have many communalities: – Hybrid pixel based on 65nm CMOS technology. – High hit rate pixel detector ( ~2GHz/cm 2 ) – High radiation tolerance: 1Grad, Neu/cm 2 over 10 years – Pixel size: ~25mm x 100mm – Measurement of deposited charge per pixel with 4 – 8bits resolution. – Use of local pixel regions (2x2 to 4x4) to share logic functions and buffering. – Digital architecture with intelligent pixels cells/regions with data buffering and triggered data extraction. – High-speed serial readout compatible with the use of the second generation radiation hard link from CERN (LPGBT). – On-chip power regulation/conversion to get optimized low mass power distribution system. RD pixel 65 collaboration – Initial endorsement from ATLAS and CMS (on-going) – RD proposal submission to LHCC this spring (encoraged to go along with this) Initial 3 year R&D plan with clear objectives and contributions: – Technology radiation test and qualification – Pixel building blocks – Global architecture design, simulation and verification (tools) – Shared prototype submissions – Open to other communities but 100% driven by ATLAS/CMS phase 2 pixel upgrades !. Not a generic 65nm ASIC or generic pixel collaboration – Strong correlation with EPIX ITN on the 65nm technology. 6 CMS-ATLAS 65nm collaboration

An EU Initial Training Network (ITN) proposal coordinated by CERN – Novel high rate pixel detector electronics – 3 pixel technology work-packages: 65nm ASICs, Interconnect and Fast readout  Total manpower requested: ~40 man years – 12 Early Stage Researchers (ESR = ~PHD students) – 2 Experienced Researchers (ER = ~post doc) – CMS: 4, ATLAS: 4, LHCb: 1, ALICE: 1, CLIC: 2, Other Companies: 2, Plus div. Associated partners  High rate radiation hard pixel ICs: 65nm for ATLAS/CMS pixels CERN-CMS: Modelling and optimization of intelligent and fault tolerant very high rate pixel architecture INFN Perugia-CMS: Design and optimization of very low power pixel region logic INFN Torino-CMS: Development of very low power small size analogue electronics for high rate pixels INFN Padova-CMS: Radiation hardness assessment of 65nm technology Bonn-ATLAS: Radiation hard mixed signal chip design in 65nm Nikhef-ATLAS: Radiation hard timing circuits in 65nm CPPM-ATLAS: SEU tolerant memories and registers Associated partners: Perugia, Pisa, MAPRad, LBNL, Fermilab High density and low mass interconnect and packaging CERN–CLIC: High density interconnect for pixel detectors and X-ray imaging CERN–ALICE: Low mass and low cost interconnect solutions for pixel detectors IZM–ATLAS: 3D interconnect for hybrid pixels. Advacam - CLIC: Ultra-fine pitch Cu pillar flip-chip interconnect Associated: Rockwood, Mergenthaler High speed readout and characterization: LHCb + commercial pixel systems: CERN–LHCb: High bandwidth data interface for pixel detectors ASI: Readout and characterization system for pixel detectors imXPAD: Pixel chip simulation, readout and calibration system Associated: Agilent EU funding result in ~April Can be the catalyser to get ATLAS and CMS to work together on phase 2 pixel R&D !. 7 EPIX: Enabling Pixels for Innovative eXperiments

Possible Pixel Phase 2 Detector layout Pixel Phase 2 – Layout step 1 = CMS Pixel Phase 1 layout Possible extention to very forward disks

Activities on-going CERN: – Interested on Digital architecture / verification – Generic / statistical study done (with E.Conti- PG) – Moving soon to System Verylog Torino: – Working on very front end analog electronics – 65nm TSMC installed – Now working on: fast comparator, ADC, ToT – Schematics, simulation, starting layout, post-layout simulations – Objective: MPW in autumn with full analog FNAL – test structures for rad-hard studies in: 130nm, 65nm – Studying solutions for pre-amplification / shaper stage to be design in 65nm – Interested to make a small chip for R&D sensor studies in 130nm Discussion at next TK Upgrade week Perugia – Installing 65nm, System Verilog

Status and prespective Lot of things are starting up – 65nm design more advanced at CERN (2-3 people working on it) Full learning curve at Torino and FNAL – R&D collaboration Most important the rad-hard studies – Advanced tools for chip architecture (digital) Courses of System Verilog – First studies on Trigger contributions On CMS – INFN side – New groups welcome to contribute