ACS 560 M ICROBLOG 911 P ROJECT S TATUS Kassie M. Bowman November 29, 2011
M AIN C MAP 2
I NCEPTION C MAP 3
E LABORATION C MAP 4
UML - C OMPONENT D IAGRAM 5
S TATUS S UMMARY – I NCEPTION P HASE Completed: Vision Document (v1) Application Architecture (v2) Software Requirement Specification (v4) FMEA (v1) Design Matrix (v2) Design Structure Matrix (v2) 6 Inception Phase Complete
S TATUS S UMMARY – E LABORATION P HASE Completed: Project Management Plan (v5) QFD House of Quality (v1) System Architecture (v2) In Progress: Software Design Description (v2) Component Diagram Class Diagrams Activity Diagram(s) Schedule (v2) 7 Elaboration Phase is on schedule
T HANK Y OU. Any questions?