1 SBAS Implementation in the Regions of ACAC and ASECNA FP7-GALILEO-2008-4.3.1 / FP7-GALILEO-2008-4.3.4 Project with Community research funding Application.

Slides:



Advertisements
Similar presentations
Agenda Item 6 GNSS Operations Ross Bowie, NAV CANADA Rapporteur, Operational WG Navigation Systems Panel Thank you… Good morning… I am ... and member.
Advertisements

Airport Planning and Design
Javier Perez Diestro Air Navigation International Director
Have you ever wondered how an aircraft can find a specific airport in a highly populated airspace?
1 Northeast Corridor Cost Benefit Assessment Status Mark Kipperman SAIC July 14, 2003.
GAGAN USER GROUP INTERACTION PROGRAM WITH HELICOPTER OPERATORS 10 th July 2014 Airports Authority of India New Delhi Airports Authority of India- FPD section1.
Continuous Climb Operations (CCO) Saulo Da Silva
1 #4295. Which frequency should you expect to use for Regional Approach Control, control tower, and ground control respectively at DFW when coming from.
The European Organisation for the Safety of Air Navigation BORYSPIL ACE & PLANNING STUDY Mariia Naumenko.
Recent Lighting and Marking Design Challenges/Trends
Approach Charts and Procedures
Protection Values for VOR-Defined ATS Routes
AIR LAW ARNOP Flight Dispatch course Minima. Precision approaches ARNOP Flight Dispatch course ILS - Instrument Landing System PAR - Precision Approach.
Aviation Benefits of GNSS Augmentation Workshop on "GNSS Applications for Human Benefit and Development“ Prague, Czech Republic September 2010 Jeffrey.
Mr. Hooper Harris FAA/JAA Annual Meeting Phoenix, AZ June 3 - 7, 2002
Airport Approach Simulation
CAR/SAM ATN GNSS SEMINAR VARADERO, CUBA 8 MAY 2002 PROCEDURES FOR AIR NAVIGATION SERVICES- OPERATIONS (PANS OPS ICAO DOC. 8168) Barry Billmann Federal.
277a_W00OCT03_CM FAA SATNAV APPROVALS ICAO CAR/SAM ATN/GNSS SEMINAR Presentation GNSS 7.3 by Hank Cabler Co-Chairman, SOIT.
Circle to Land.
Lecture 12:Approach Lighting System
Aviation Benefits of GNSS Augmentation Workshop on the Applications of GNSS Chisinau, Moldova May 2010 Jeffrey Auerbach Advisor on GNSS Affairs Office.
Stabilized Constant Descent Angle NPA’s
„ Fuzzy Expert” System for Determination of Runways in Use Case Study: Zurich Airport Fedja Netjasov University of Belgrade Faculty of Traffic and Transport.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 1 Aviation System Standards Flight Inspection Flight.
Study Continuous Climb Operations
Parts Part 1 – Definitions/Abbreviations Part 21 – Certification Procedures for Products/Parts Part 43 – Maintenance, Preventative Maintenance, Rebuilding,
VDA – Vertical Descent Angle
Air Berlin discovers GLS Marc Altenscheidt
India GAGAN – Adoption within Asia Pacific Region Plan/Opportunities.
6-1 Design of UAV Systems UAV operating environmentsc 2002 LM Corporation Lesson objective - to discuss UAV Operating Environments including … National.
1 SBAS Implementation in the Regions of ACAC and ASECNA FP7-GALILEO / FP7-GALILEO Project with Community research funding WP2- Service.
February EGNOS Safety of Life service demonstration for Civil Aviation Euromed GNSS II project/MEDUSA.
© 2011 The MITRE Corporation. All rights reserved. Advisory Vertical Guidance (Advisory VNAV) A Useful and Flexible Safety Enhancement S.V. Massimini,
1 SBAS Implementation in the Regions of ACAC and ASECNA FP7-GALILEO / FP7-GALILEO Project with Community research funding WP2- Service.
Slide 1 July 2004 – FALBALA/WP5/FOR3/D – CENA, DFS, EEC, NATS, Sofréavia & UoG WP2 Current situation analysis – Aircraft perspective Philippe Louyot (CENA)
Performance Based Navigation (PBN) Canadian Implementation Presentation to Air Transport Association of Canada 9 November 2010.
1 IATA / Airline Views on Performance Based Navigation Theo van de Ven/KLMAnthony van der Veldt/IATA Senior Manager Strategy & User ChargesAsst Dir Safety.
The Benefits of RNP-RNAV in Commercial Operations 4 th Steering Committee Meeting COSCAP-North Asia 2, 3 March 2005, Shanghai, PRC Captain Frank M. Hankins.
Wide Area Augmentation System Dan Hanlon WAAS Program Manager April 2, 2003.
1 GNSS National implementation plans. SIRAJ Workshop, Rabat, 28 May Index  Purpose of the plans  Content of the plans  CBA  Main outcomes.
Presented by: Roger Sultan, FAA, AFS-400 Date: August 8, 2012 Federal Aviation Administration FPAW Summer 2012 RVR/Prevailing Visibility Conversion and.
1 Introduction to Categorical Amendment Criteria (CAC)
1 SBAS Implementation in the regions of ACAC and ASECNA Project with Community research funding Al-Hoceima Demonstration.
SBAS Implementation in the regions of ACAC and ASECNA FP7-GALILEO / FP7-GALILEO Project with Community research funding.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
Satellite-based navigation system: a pan-African infrastructure for integration and economic development Stefano Scarda European Commission Africa-EU Infrastructure.
Overview of FAA Satellite Navigation Transition and Backup Strategies Int’l Loran Association October 28, 2002.
Lecture 7: INSTRUMENT LANDING SYSTEM (ILS)
Global SBAS Status Satellite Based Augmentation System (SBAS) Interoperability Working Group (IWG) November 2013.
1 SBAS Implementation in the regions of ACAC and ASECNA Project with Community research funding EGNOS System Definition and Benefits.
Federal Aviation Administration What’s New In Instrument Flight Procedures Jerry Lebar, Eastern Flight Procedures Office March 3, 2010 Hershey Airports.
Review Chapter 4-8. Departure and Arrival Charts DPs, STARs and visual approaches are routinely assigned by ATC DPs and STARs are issued to simplify clearance.
1 SBAS Implementation in the regions of ACAC and ASECNA Project with Community research funding PROJECT PRESENTATION.
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 1 Wide Area Augmentation System (WAAS) Dan Hanlon.
Potential Safety Benefits of RNP Approach Procedures
Worldwide Symposium on Performance of the Air Navigation System, Montreal, 29 March RNA and RNAV and RNP Strategy in Japan Yoshiki Imawaka Director.
1 EUROCONTROL S TRATEGIES FOR The ATM Strategy for the Years As from MATSE/6 decision (Jan. 2000): To cater for forecast increase in demand.
1 Introduction of EGNOS operations: the perspective of an Air Navigation Service Provider METIS Workshop Benefits of EGNOS in Civil Aviation Istanbul 18.
Vertical, lateral separations based on time / distance
Free Routing Airspace in Europe
Continuous Climb Operations (CCO) Saulo Da Silva
Association of California Airports Instrument Flight Procedures
AIR TRAFFIC CONTROL SERVICE
Kabul RNAV Visual & RNP-AR Process & Benefits
Summary of the results of discussions in the aviation panel
FAA SATNAV APPROVALS ICAO CAR/SAM ATN/GNSS SEMINAR Hank Cabler
Continuous Climb Operations (CCO) Saulo Da Silva
Workshop on preparations for ANConf/12 − ASBU methodology
Ops Specs The performance data for takeoff and landing an aircraft can be obtained from the aircraft's flight manual or pilot's operating handbook. The.
Presentation transcript:

1 SBAS Implementation in the Regions of ACAC and ASECNA FP7-GALILEO / FP7-GALILEO Project with Community research funding Application Business Cases Prepared by Egis Avia / Pildo /Navya Presented by Nga Bui (Egis Avia)

SIRAJ Final Workshop - Rabat 28th May 2012 ToC Objectives Context Preliminary analysis Methodology Context Results Conclusions 2 Application Business Case: Implementation of LPV approaches in 3 AD of the regions of ACAC and ASECNA SBAS Implementation in the regions of ACAC and ASECNA SIRAJ project

SIRAJ Final Workshop - Rabat 28th May 2012 Objectives and Development 3 Objectives: –To develop a specific business case for an AD where EGNOS APV approaches are to be implemented in the frame of SIRAJ project: –For ACAC: –Al-Hoceima Airport (Morocco) –Najran Airport (Saudi Arabia) –For ASECNA: –Dakar L.S. Airport (Senegal) Business Case Approach: For each of the considered airport: –A preliminary analysis is performed to determine baseline scenario –A Methodology of Cost-Benefit Analysis depending on the baseline scenario –Combination of different inputs coming from the Air Navigation Service Provider and the Airport Manager

SIRAJ Final Workshop - Rabat 28th May 2012 Preliminary Analysis Aims at analysing the airport in terms of: –Terrain characteristics –Approach characteristics: Radio Navigation Aids Procedure published Wind direction and intensity and Runway configuration –Meteo Analysis: Cloud Ceiling and Visibility constraints –Traffic Figures In order: –To analysis the current situation (baseline scenario) –To determine potential benefits of implementing APV approaches –To determine the Business Case Approach 4 Preliminary Analysis

SIRAJ Final Workshop - Rabat 28th May 2012 Context 5 Al Hoceima Airport Runway Characteristics: THR17 holds IFR procedures whilst THR 35 is currentlty only used for VFR operations. Casablanca AlHoceima RWYTORA (M)TODA (M)ASDA (M)LDA (M)

SIRAJ Final Workshop - Rabat 28th May 2012 Preliminary Analysis 6 IFR Approach Procedure in place for RWY17: ProcedureOCA (OCH) (ft) VOR/DME RWY17 STD MACG1030 (1010) MACG =4.0%760 (740) VOR RWY (2090) …with STD Missed Approach Climb Gradients, procedure DH is always above 1000 ft!! Al Hoceima Airport

SIRAJ Final Workshop - Rabat 28th May 2012 Preliminary Analysis 7 Al Hoceima Airport Traffic figures METEO analysis Cloud ceiling and visibility do NOT cause disrupted in the normal airport operation of the airport: VMC are met almost all the year. Small/ medium airport with low traffic figures Chance for growing… Airport too small for an ILS investment??

SIRAJ Final Workshop - Rabat 28th May 2012 Context 8 Najran Airport Runway Characteristics: RWYTORA (M) TODA (M) ASDA (M)LDA (M) RWY 06/24 can held IFR Non- Precision Approaches procedures

SIRAJ Final Workshop - Rabat 28th May 2012 Preliminary Analysis 9 IFR Approach Procedures in place for RWY 24 & RWY06: Procedure(M)DA ((M)DH) (ft) ILS RWY (200) VOR/DME RWY (718) VOR/DME RWY (662) Najran Airport ILS RWY 06 VOR/DME RWY 24 VOR/DME RWY 06

SIRAJ Final Workshop - Rabat 28th May 2012 Preliminary Analysis 10 Najran Airport Traffic figures METEO analysis Wind and Visibility do not represent a significant constraints on operations April-September is the period of time when the weather is cloudiest. The rest of the year is normally clear. Constant increase of operations and passengers ( ) Decrease from 2007 to 2010 (Operations, passengers, fret) APV Approach can contribute to improve operations and even increase capacity OperationsPassengers Fret

SIRAJ Final Workshop - Rabat 28th May 2012 Context 11 Dakar Léopold Sédar Senghor Airport Runway Characteristics: RWYTORA (M) TODA (M) ASDA (M)LDA (M) RWY18/36 can held IFR Precision Procedures RWY THR36 is the prevailing RWY most of the year.

SIRAJ Final Workshop - Rabat 28th May 2012 Preliminary Analysis 12 ILS Precision Approach Procedures in place for RWY36 IFR Non-Precision Approach Procedures in place for RWY 36 & 18: VOR-Based procedures – RWY 36 VOR/DME-based – RWY 18 RNAV GNSS (LNAV) Procedures – RWY18 & RWY 36 Dakar L.S. Airport Procedure(M)DA ((M)DH) (ft) CAT ACAT BCAT CCAT D ILS RWY (220) 300 (230) 310 (240) 320 (250) VOR/DME RWY (320) RNAV GNSS (LNAV) RWY (450)

SIRAJ Final Workshop - Rabat 28th May 2012 Preliminary Analysis 13 Dakar L.S. Airport Traffic figures METEO analysis Wind constraints a lot operations (RWY18 operates only Summer Time) Cloud ceiling do NOT cause disruptions where as visibility impacts operations. Medium airport with medium traffic figures Chance for growing… Limited use of RWY18 due to wind Limited use of RWY18 due to wind RVR meters 50 ≤RVR < ≤RVR < ≤RVR < ≤RVR < ≤RVR ≤2000 TOTAL (%)2,38%14,28%30,95%21,42%30,95% Northern traffic usually prefers to extend to RWY36 due to ILS (no direct RWY18 access) APV Approaches can offer back-up to ILS (RWY36), safer direct access to RWY18)

SIRAJ Final Workshop - Rabat 28th May 2012 Methology 14 Three different approaches depending on the current airport status

SIRAJ Final Workshop - Rabat 28th May 2012 Methodology 15 Al Hoceima Airport Comparison between conventional approaches and RNAV GNSS procedures Scenarios definition:

SIRAJ Final Workshop - Rabat 28th May 2012 Methodology 16 Najran Airport Comparison between conventional approaches and RNAV GNSS procedure- Scenarios definition:

SIRAJ Final Workshop - Rabat 28th May 2012 Methodology 17 Dakar L.S. Airport Landing conditions and case of “disrupted approaches” Recorded cloud ceiling Recorded visibility Threshold (50ft) (M)DA/DH Runway Required visibility Required cloud ceiling

SIRAJ Final Workshop - Rabat 28th May 2012 Methodology 18 Dakar L.S. Airport Estimation of reduction in “disrupted approaches” and % of operations gained 1) Total aircraft landings - 2) Non- ILS aircraft landings 3) Disruption probability per approach type 4) Aircraft NPA disruptions 5) Reduction in disruptions and % Operations gained According on input data available, dependant upon runway end distribution or upon airport ILS capability and tailwind – sets upper bound to potential benefits 6) Total benefits in airport fees Dependant upon estimated (m)DH, cloud ceiling & runway visibility Dependant upon landing aircraft capability and selected RNAV capability

SIRAJ Final Workshop - Rabat 28th May 2012 Methodology 19 Dakar L.S. Airport Definition of Scenarios Baseline scenario: RNAV (GNSS) NPA with LNAV minima are published for both runways, i.e. no change in the curent day situation Scenarios ranging from the less optimistic to the most optimistic: Scenario A (Pesimsitic)): APV SBAS approach is implemented for both RWY THR36/RWY THR18 with LPV around 350 ft for RWY18 which are nearly the same as current NPAs; Scenario B (Medium): APV SBAS approach is implemented for both RWY THR36/RWY THR18 with LPV around 300 ft which are lower than current NPAs; Scenario C (Optimistic): APV SBAS approach is implemented for both RWY THR36/RWY THR18 which is a trade-off between best LPV minima authorized and avoiding runway ugrade for RWY THR18.

SIRAJ Final Workshop - Rabat 28th May 2012 Methodology BaselineScenario A (Pesimsitic) Scenario B (Medium) Scenario C (Optimistic) RNAV ImplementationRNAV (GNSS) NPARNAV (GNSS) NPA, APV SBAS RWY THRTHR36THR18THR36THR18THR36THR18THR36THR18 APV SBAS DH (Ft)N/A 300Current Draft Design Dakar L.S. Airport Aircraft categories RNAV (GNSS) NPA LNAV capable APV SBAS capable Cat A100% Cat B100% Cat C100%10% Cat D100%10% Assumed Navigability Capacity Scenarios Assumptions

SIRAJ Final Workshop - Rabat 28th May 2012 RESULTS Scenario A. THR17 IFR; THR35 VFR Al Hoceima Airport

SIRAJ Final Workshop - Rabat 28th May 2012 RESULTS Scenario B. THR17 IFR; THR35 IFR Al Hoceima Airport

SIRAJ Final Workshop - Rabat 28th May 2012 RESULTS Scenario C. VOR/DME decommission Al Hoceima Airport

SIRAJ Final Workshop - Rabat 28th May CONCLUSIONS –Despite METEO conditions allow the operation almost all the year, it is important to complete the implementation of IFR procedure in all RWY ends (if possible, with vertical guidance). –It is highly recommended to push towards the implementation of APV SBAS procedures. –It is not recommended to invest in ILS systems due to its very high cost. Above everything, an airport with low traffic figures cannot afford the expenses linked to the ILS maintenance. –APV SBAS procedures provide an excellent performance “ILS-alike” with a very low investment and negligible Operational Cost –APV SBAS procedures are safer than VOR/DME non-precision approach procedures, by:  Reduced procedure minima (DH)  Reduced pilot workload  Reduced controller workload  Improved track keeping –In the long term, with a full GNSS airspace structure, it could be evaluated the decommission of the existing VOR/DME (ALM) saving important costs related to its maintenance. Al Hoceima Airport

SIRAJ Final Workshop - Rabat 28th May 2012 RESULTS Scenario A. Najran Airport (in SAR) Scenario B.

SIRAJ Final Workshop - Rabat 28th May 2012 RESULTS Scenario C. Najran Airport (in SAR) Scenario D.

SIRAJ Final Workshop - Rabat 28th May 2012 RESULTS Scenario E. Najran Airport (in SAR)

SIRAJ Final Workshop - Rabat 28th May 2012 RESULTS Najran Airport Scenarios CAPEX (in SAR) OPEX (in SAR) Scenario A A A Scenario B B B Scenario C C C C Scenario D D D Scenario E E E To select the correct scenario, analyzing price and capability, a study over 15 years have been done.

SIRAJ Final Workshop - Rabat 28th May CONCLUSIONS –It has been demonstrated that APV SBAS approaches are less expensive on implementation and maintenance than ILS and VOR/DME systems. –Number of flights operating with vertical guidance approach procedures will not vary if APV SBAS is used instead of ILS approach. –It is has been demonstrated that it is preferable to push towards the implementation of APV SBAS procedures rather than other possibilities taking into account the economical advantages of APV compared to VOR and ILS.. –It is not recommended to invest in a new ILS system due to its very high cost compared to APV. Above everything, an airport with low traffic figures cannot afford the expenses linked to the ILS maintenance. –It is recommended to substitute VOR/DME by APV because APV SBAS approaches improve the level of service with vertical guidance and better lateral accuracy than VOR/DME approaches with less CAPEX and OPEX expenses. –APV SBAS procedures provide an excellent performance “ILS-alike” with a very low investment and negligible Operational Cost. –APV SBAS procedures are safer than VOR/DME non-precision approach procedures, by: –Reduced procedure minima (DH) –Reduced pilot workload –Reduced controller workload –Improved track keeping Najran Airport

SIRAJ Final Workshop - Rabat 28th May 2012 RESULTS Scenario A. Dakar L.S. Airport

SIRAJ Final Workshop - Rabat 28th May 2012 RESULTS Scenario B. Dakar L.S. Airport

SIRAJ Final Workshop - Rabat 28th May 2012 RESULTS Scenario C. Dakar L.S. Airport

SIRAJ Final Workshop - Rabat 28th May CONCLUSIONS Dakar L.S. Airport DH Range (Feet) CAT ACAT BCAT CCAT D RWY THR18250 to to to to 380 RWY THR36250 to to to to 404 –It has been demonstrated that APV approaches in Dakar L.S. can bring quantitative benefits when they are implemented at both RWY TRH 18 (300 ft LPV Minima ) & RWY THR 36 (Between 250 and 300 ft LPV Minima ) –Positive NPV and Benefit to Cost ratio –The APV procedure currently designed on RWY THR18 (around (350 ft LPV Minima ) can to improved to lower DH, then decrease RVR and gain operations. –Depending on the margins taken on the APV SBAS procedure, the calculated minima can range as follows:

SIRAJ Final Workshop - Rabat 28th May 2012 THANK YOU FOR YOUR ATTENTION QUESTIONS? 34