Justin Hardee, P.E. Lee County Engineer.  ALDOT Policy  Construction Process  Status  Lee County’s Bridge Inventory  2010 Bond Issuance for Bridges.

Slides:



Advertisements
Similar presentations
Emergency Response via the Web Two emergencies in August 2007 highlight the Internet as a dynamic communication tool.
Advertisements

Fairfax County Board of Supervisors Transportation Sub-Committee Briefing Federal Highway Administration Eastern Federal Lands Highway Division Robert.
TIGER PROGRAM LESSONS LEARNED Great PA/NJ Regional Trail Projects Presentation to the Circuit Coalition May 15, 2014 Chris Stanford, P.E., PTOE, PMP Michael.
SOUTHEAST PBES/ABC REGIONAL PEER EXCHANGE ARKANSAS STATE HIGHWAY & TRANSPORTATION DEPARTMENT FEBRUARY 26,
Wisconsin Transportation Finance and Policy Commission Freight Rail Day 2012 October 26, 2012.
Oklahoma Department of Transportation Susan McClune Regulatory Services.
Bridge over BNSF Railroad 7 km East of Windham - East Bridge Replacement Project Using Accelerated Bridge Construction.
County Transportation System Governor’s Transportation Advisory Committee September 14, 2012 Abbey Bryduck, AMC Policy Analyst.
6TH ANNUAL CONFERENCE.
SIXTH ANNUAL AMOTIA CONFERENCE Asset Maintenance in Louisiana Rhett A. Desselle, P.E. 10/03/2014.
Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5 The Slow Uphill Climb Matt Bullock, P.E. Chief District Engineer.
 Narrow roadway, with no shoulders  Poor pavement condition  AADT 405/150 – Low Traffic Volume  Ideal candidate for P.I.P.
DEPARTMENT OF PUBLIC WORKS BUREAU OF ENGINEERING & CONSTRUCTION STRUCTURAL DESIGN SECTION REPLACEMENT OF BRIDGE NO. B-0427 ON DAIRY ROAD OVER OWL BRANCH.
Local Highway Technical Assistance Council Joint Senate and House Transportation Committees January
NEW YORK STATE DEPARTMENT OF TRANSPORTATION South Cascade Drive/Miller Road (Formerly Route 219)/ Cattaraugus Creek Design-Build Project (PIN ,
Twenty-Fourth Annual Alabama Asphalt Pavement Conference MARCH 11, 2014 ALDOT HIGHWAY FUNDING UPDATE.
U.S. 421 Bridge DES# Thursday, July 17, :30 p.m. Frankfort Community Public Library 208 West Clinton Street, Frankfort, IN.
Dulles Corridor Metrorail Project 23-mile new Metrorail line branching off the Orange Line after East Falls Church 11 new stations 5 in Phase 1: East Falls.
S.R. 256 Road Reconstruction Project From City of Austin to S.R. 203 Thursday, February 6, 2014 Austin Elementary School 6:00 p.m.
ACEA Annual Conference PERDIDO BEACH RESORT ORANGE BEACH, AL MAY 12-13, 2015 TRAFFIC COUNTS AND RAILROAD AGREEMENT REQUIREMENTS BRAD LINDSEY, P.E. & ADAM.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Route 110 over Route 27 Design-Build Project (PIN , D900027) Town of Babylon, Suffolk County Request.
AGENDA  PROJECT HISTORY  NORTHERN SECTION UPDATE  SOUTHERN SECTION OVERVIEW  INTERCHANGES  PROJECT SCHEDULE  UPCOMING ACTIVITIES  OPEN DISCUSSION.
ABC/PBES COSTS by Mary Lou Ralls, P.E., Principal Ralls Newman, LLC (formerly Texas State Bridge Engineer)
MaSSENA LATERAL BRIDGE SLIDE CASE STUDY
THE FUTURE OF TRANSPORTATION FUNDING AN ALDOT PERSPECTIVE December 3, 2014.
Route CC bridge replacement over Caulk’s Creek. What is the problem? Large debris consistently collects on the upstream end of the bridge. This causes.
Fiscal Years Outlook Preliminary Six-Year Financial Plan and Six-Year Improvement Plan Strategy John W. Lawson, Chief Financial Officer Reta.
Gaviota Beach Road – Transportation Division County Project Summer Crossing – Pre 1997 Located west of Highway 101 Access to Gaviota Beach and Hollister.
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Alternatives Presentation.
Monroe County Transportation Projects 4 Local Agencies: Unincorporated Monroe County City of Key West City of Marathon Village of Islamorada District Six.
 Do you have an Interest in Math and Science?  Do you have good problem solving skills?  Do you approach problems in an analytical manner?  Can.
Street Maintenance. The Town of Bayfield maintains centerline miles of road.
The American Recovery and Reinvestment Act of 2009 (ARRA) Federal Highway Administration Wisconsin Division January, 2010 Jason P. Spilak, PE, ARRA Engineer.
Current Construction Projects Major Projects Pinellas County.
SHRP 2 - FIRST DEMO PROJECT KEG CREEK, IOWA R04 – “BRIDGE DESIGNS FOR RAPID RENEWAL” Sandra Larson, P.E. Iowa Department of Transportation Research and.
 Coordinating construction related training  Following and gathering info for construction related performance measures  Follow Contract Modifications.
St Johnsbury BF 7000(20) Bridge 6 on VT Route 2B over the Lamoille Valley Rail Trail Presenter: John Byatt, PE Consultant Project Manager.
ABC POLICY DEVELOPMENT IOWA DOT Norman McDonald, PE Iowa Department of Transportation Office of Bridges and Structures MID-CONTINENT TRANSPORTATION RESEARCH.
ENGINEERING & CONSTRUCTION DIVISION GERALD N. BRINTON, P.E. COUNTY ENGINEER / DIRECTOR OF ENGINEERING & CONSTRUCTION VOLUSIA COUNTY PUBLIC WORKS DEPARTMENT.
STATE CROSSING SAFETY PROGRAMS & FEDERAL CROSSING SAFETY FUNDING CROSSINGS FOR THE 21 ST CENTURY SESSION AASHTO – SCORT MEETING March 14, 2011 – Washington,
“Get in, do it right, get out, and stay out.”
Beaver Dam Wash Bridge Project Introduction Nick Hont, P.E. Mohave County Flood Control District Engineer.
Dane County Department of Public Works, Highway & Transportation Jerry Mandli, P.E. Commissioner/ Director.
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Public Information Meeting.
Road work season begins Projects kick off in local counties May 19, 2012 By Jason Raiche - staff writer Daily
Regional Transportation Investments: Alaskan Way Viaduct / Seawall Port of Seattle Commission Policy and Staff Briefing March 14, 2006 Item No. xx Supp.
Colbert County Budget Solutions John Bedford, P.E. County Engineer 2012 ACEA Convention.
The Missouri Department of Transportation 2007 Update.
BRIDGE BREAKDOWN: EVALUATING THE ARCOLA BRIDGE ANNA GEORGE GRADE 12 METHACTON HIGH SCHOOL 3 RD YEAR AT PJAS.
USA Parkway Project Welcome Public Information Meeting to the
1 MnDOT Metro District Proposed Transportation Improvement Program (TIP) Amendment Metropolitan Council January 17, 2007.
Raw and Finished Water System Improvements April 22, 2014.
Mike McColeman, P.E. Assistant Maintenance Administrator Ohio Department of Transportation Defining Desired Outcomes Defining Desired Outcomes.
Metropolitan Council 1 Twin Cities Region Transportation Policy Plan Nacho Diaz Metropolitan Council Evaluating Economic and Community Impacts of Transit.
EAST CHEROKEE DRIVE PROJECT UPDATE CHEROKEE COUNTY ENGINEERING DEPARTMENT MARCH 31, 2016.
WEST VIRGINIA INDUSTRIAL ACCESS ROAD PROGRAM West Virginia Economic Development Council January 27, 2016.
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
1% Sales Tax Commission Board Meeting June 3, 2015.
ATRIP Status Update Edward N. Austin, P.E. Alabama Department of Transportation 2016 ACEA Conference May 11, 2016.
Region’s Core Services 202/17/2014 Integrity ∙ Excellence ∙ Respect Provide leadership, administrative support, procurement and budgetary and financial.
1 Camden County Road & Bridge Department Larry E. Lampe Superintendent This presentation will probably involve audience discussion, which will create action.
2009 CUMULATIVE BRIDGE PROGRAM Monroe County Highway Department April 14, 2009.
2009 Sales Tax Extension Project Status Update. 2 Background Sales Tax was extended via August 26, 2008 referendum. Sales Tax was extended for an additional.
Public Information Meeting St. George Road - Oak Hill Road Intersection Reconstruction Project.
The Alabama Transportation Rehabilitation and Improvement Program
Sandra Larson, P.E. Iowa Department of Transportation
ALDOT Pavement Preservation Policy
Issaquah-Fall City Road
State of SCDOT Feb 2019 Introduce Commission and Direct Reports.
November Bond Election
Presentation transcript:

Justin Hardee, P.E. Lee County Engineer

 ALDOT Policy  Construction Process  Status  Lee County’s Bridge Inventory  2010 Bond Issuance for Bridges  ATRIP Program

 In 2010, the Lee County Commission issued approximately $8.0 Million in Bonds for the purpose of replacing aging bridge structures in Lee County.  15 structures were originally selected to be replaced using these funds.  8 were completed with Lee County performing our own approach work before ATRIP was announced.

 The ATRIP Program was announced and Lee County focused on resurfacing for the first two rounds.  Round 3 we decided to utilize our bond funds to expand the impact we could have on our bridges.  Awarded 15 bridges in Round 3.

 Lee County committed to use our bond funds for design, right-of-way and all approach work to be performed by the county.  ATRIP was asked to fund 80% of the structure only.  Our Division expressed concerns about the County performing our own work and did not want to allow it.

 However, in just six (6) months, working with IP Bureau, County Transportation and the ACEA, a policy was established to satisfy ALDOT about the logistics of Lee County and the contractors working on the same project and handling the traffic control and erosion and sediment control from start to finish.

 Meanwhile, ALDOT restructured its Divisions into Regions and Lee County was transferred to the Montgomery Area of the Southeast Region.  So, our first bridge project was planned under one Division with construction and final closeout administered by the new Region under a new policy.

 Lee Road 10, Bridge over Chewacla Creek  AADT = 2,400 vpd, with 15.4% trucks  This bridge closure cut off interstate access for a quarry, a paving company and a local restaurant.  No onsite detour option available. Detour was 15 miles.  High priority project for Lee County.

 Road was closed on January 26,  Required bridge was a 115’ single span on drilled shaft foundations with 1,200’ of approaches.  On March 12, 2014, Lee County began the east approach after the contractor completed the east abutment.  County and contractor working simultaneously on the project.

 Contractor finished barrier rails on May 19 th.  Grooved the deck on May 20 th.  (This was their last item of work.)  Guardrail was placed by County’s local bid contractor on May 21 st.  ALDOT performed an inspection on May 22 nd.  Bridge was opened traffic two (2) days after the completion of the structure.

1 - Bridge Completed 3 - Currently Under Construction 1 - Project Under Contract 10 - Plan Design/Right-of-Way Acquisition

 Prior to our bond issuance and ATRIP our average sufficiency rating was a 65.  After we complete these bridges our average sufficiency rating will be an 81.

Contact Information: Justin Hardee, P.E. County Engineer Lee County Highway Department 100 Orr Ave Opelika, AL Ph: