Analysis of Sediment Yield from Unpaved Roads. Phase I: Unpaved Roads Inventory Field Data Collection  subwatershed scale  ~90 miles of roads  diversity.

Slides:



Advertisements
Similar presentations
Lolo Creek Watershed Project #
Advertisements

WATER QUALITY ANALYSIS for ANTIDEGRADATION
Session 4 Outline Overview of regulations needed. What should regulations address? What to look for in model regulations? Participation discussion on current.
CDOT WATER QUALITY PROGRAM
From US 17 to SR 11 and SR 11 to Cone Road FPID No
Trail Assessments: what are they and how do we do them? Mid-Atlantic Regional Partnership Committee October 15, 2005.
NPDES Phase II Storm Water Regulations: WHAT MUNICIPAL GOVERNMENTS NEED TO KNOW.
LAND AREA: 688 SQ. MI. – 3RD LARGEST IN OHIO 421 C/L MILES 393 BRIDGES (275 NBIS) 1,800 CULVERTS 5,000+ SIGNS 10 RAILROAD CROSSINGS (at grade) CURRENT.
Summary of First Sampling Effort for the Washington Roads Sub-Basin Scale Effectiveness Monitoring Project Presented by: Kathy Dubé.
2 A J B F 5 6 E 8 C G 10 4 I 26 H D N Legend Source drains into the ditch here. Data point directly.
CONSTRUCTION BEST MANAGEMENT PRACTICES (BMPs) CONSTRUCTION GUIDE TO CLEANER WATER Information compliments of: WaterWorks! WaterWorks! Center for Environmental.
Soil and Water Road Condition Index SDTDC Prepared by: Carolyn Napper 10/06.
MCM#6 Pollution Prevention/Good Housekeeping Part 4 Part 4 Municipal BMPs – Cleaning &Maintenance.
Building a Comprehensive IDDE Program Doyle Allen, Stormwater Manager SCASM Meeting May 8, 2007 Fort Jackson, SC Illicit Discharge Detection & Elimination.
LANE’S BALANCE Construction Phase - Sediment Delivery  Q + S ~ Q s + d s Post-Construction - Sediment Delivery  Q ++ S -- ~ Q s - d s + Incision.
Restoration of Chamberlain Creek Amy Clinefelter Riparian Wetland Research Program Restoration of Chamberlain Creek Amy Clinefelter Riparian Wetland Research.
EEP Watershed Planning Overview August 12, Ecosystem Enhancement Program Nationally recognized, innovative, non-regulatory program formed in July.
Project Manager: Tim Brown Project Editor: Tabatha Doughty Project Engineer: Drew Furry Project Engineer: Jim Walter.
Greg Stabach and Kim Adams Rogue Valley Council of Governments January 21 st, 2015 Rogue TMDL Meeting.
2014 CONSTRUCTION ESTIMATES Estimates Estimates 3 Point of the illustration? Document your assumptions.
IX. 1 See these resources: HDS6-01 (Section 9.3), HEC20-95 (Section 4.3 to 4.7), HDS1-78 (Section 11), TXDOT-02 (Section 4.4), FITD Class CD IX. Overview.
STH 29 and CTH O Construction Project Manager: Richard Simon Project Leader: Dave Julson.
1 Lake Tahoe TMDL Forested Upland Source Category Group Load Reduction Analysis Dr. Mark Grismer, UC Davis Michael Hogan & Kevin Drake, Integrated Environmental.
WVDOT GTI SECTION Status Update for Districts. AGENDA Introduction. Introduction. Status Update. Status Update. How to Spatially Enable Database. How.
DUNLEITH LANE DRAINAGE SYSTEM Justin Lyle and Cody Binder ET 493- Senior Design Advisor: Mohamed Zeidan Construction ET 10/08/2014.
Anne Wynn Ecosystems Investigations Program Geological Survey of Alabama Application of the Strategic Habitat Unit (SHU) Model in North River.
WVDOT GTI SECTION Status Update for Miss Utility.
1 ELEMENTS OF AN EFFECTIVE SEDIMENT CONTROL PLAN PLANNING APPROACH Issued May 2009 Level II: Introduction to Design Education and Certification for Persons.
Forestry BMPs OUR GOAL: To Protect Our Waters and Site Productivity Through the Proper Use and Application of Best Management Practices. (BMPs)
Georgia Adopt-A-Stream Introduction Georgia Adopt-A-Stream 2 Martin Luther King Jr. Dr. SW Suite 1462 East Atlanta, Georgia
The Corporation of the Town of Amherstburg Public Works Department 2013 CAPITAL BUDGET Presented to: The Heavy Construction Association March 20, 2013.
Municipal St rm Water Program. Storm Water Programs Industrial –bus maintenance yards Construction –addition of a gym Municipal.
PRESENTATION PAPER ON SMALL SCALE IRRIGATION TECHNIQUES ABOUT IRRIGATION INFRASTRUCTURE IN UGANDA BY BYARUHANGA K. GODFREY (COUNTERPART STAFF SIAD PROJECT)
Molalla River Knotweed Mapping, Outreach and Control Program Clackamas Soil & Water Conservation District.
GPS GIS GIS in Campbell River GPS: Global Positioning System Originally designed for use by the military It is a satellite-based, radio navigation.
Chumstick Creek Salmon Habitat Conditions* Land development, road construction, and other human activities have affected channel migration and sediment.
Icicle Creek Salmon Habitat Conditions* Land Development has affected stream channel movement, off channel habitat, and LWD recruitment. Barriers to migration.
MDOT Storm Water Management Plan Module 1: Introduction to Storm Water Management Together… Better Roads, Cleaner Streams.
Oregon Case Studies Ryan Johnson. Studies  The response of impounded sediment to a culvert replacement project on Sutter Creek, a tributary of Honey.
1 Questions Addressed What are the options for reducing pollutant inputs to Lake Tahoe? Pollutant Reduction Opportunities.
La Moine River Ecosystem Partnership: Organizing for Success Dan Moorehouse & Jeff Boeckler.
San Pedro Creek: A Longitudinal Profile Study Andrew Georgeades Anne Jurek Mary Snow.
Recognition and reporting of water quality management problems on Michigan’s forest lands.
Rebecca Schneider, Nancy Trautmann, & Linda Wagenet Cornell University Roadside Ditches: A Watershed Curriculum Module.
IDEM 205(j) Grant February 27, Who are we? The Upper Wabash River Basin Commission (UWRBC) was established by State Legislature in 2001 (IC ).
MDOT Storm Water Management Plan Module 2: Best Management Practices
Project Constraints Maximum Expected Traffic Load: 2 twenty-ton, 2-axle trucks per week Channel Size: app. 6 ft wide x 5.5 ft deep Available Reinforcement.
Volunteer-collected data can provide important baseline information to assist with decision making and improve watershed management. In this study, data.
11-1 Water Resources Page 269. A. The Water Cycle 1. Water is a renewable resource. Why?
2015 Bond Rate Guidelines for the Calculation of Land Reclamation Bonds on Coal Mining Operations MRAB Meeting April 23, 2015.
An Overview of our Community’s Stormwater Management Program
1 Module 1: Refresh Your Perspective on the Storm Drain System Stormwater System Maintenance: A 4-Part Workshop Series.
Water Quality Effectiveness Evaluation (2015) The WQEE protocol has been implemented in DSS since Staff have now collected data from 161 sample sites,
Review The point of case studies. Case Study 4 The case of the flooded basements.
Diversity Outreach Program Fourth Session Surveying – Setting the Base for the Project January 20, 2015.
Conceptual Approaches for Short- and Long- Term Erosion and Sediment Control Big River State Park At Big River State Park, DPR and the State of California.
TWS/SELC Road Condition Study Two Duke University Nicholas School of the Environment, Masters Candidates and one Duke University, Undergraduate.
Bridges Reach analysis Fundamental tool for design
Indices of Road Erosion Bear Valley Watershed, Idaho
Development and Application of a GIS-based sediment budget model
Placer County Water Agency Middle Fork American River Project FERC Project No February 26, 2008.
Paradise Threatened: Land Use and Erosion on St
Measure A Financial Oversight Committee August 7, 2013
Road-Stream Interface:
Birch bay community park
Worksite Assessment Overview 1/31/2017 Starts at 9am
Source Document: Analyst: Date:
Federal-aid Highway Program
Module # 17 Overview of Geomorphic Channel Design Practice
Stream Crossing Replacement Policy
Presentation transcript:

Analysis of Sediment Yield from Unpaved Roads

Phase I: Unpaved Roads Inventory Field Data Collection  subwatershed scale  ~90 miles of roads  diversity of land use/cover  area of public buy-in  line and point features

Data Collection  Line Feature –Road  Point Feature –Culvert –Cross Drain –Wing Ditch –Bridge –Etc.

Data Dictionary: Road Segment

Data Dictionary: Culvert Stream Crossing

Slab Stream Crossings

Phase II: Sediment Yield Modeling Field Data Collection  On 10% of Inventoried Roads  Stratified Random Sample  Stratified by # of Lanes, Ditch Erosion  Results are Extrapolated to other Roads

Workshop Format  Introduction to Rivers  Importance of Roads & Sediment Delivery  WCRC  Road Construction & maintenance BMPs

Field Demonstrations  on site  partners  materials & equipment  site selection process

Discussion