Experience Fabricating the Storage Ring Vacuum Chambers for NSLSII

Slides:



Advertisements
Similar presentations
The Preassembling Installation Survey & Alignment Accelerator Center of IHEP Qu Huamin 2006 / 4 / 27.
Advertisements

11-13/10/2007 ILC BDS Kick-Off Meeting, SLAC, US 1 BDS Vacuum System Dr. Oleg B. Malyshev ASTeC Daresbury Laboratory.
M. Jimenez AT/VAC Room Temperature (LSS) Vacuum Systems M. Jimenez.
Vacuum & Cooling Systems Updates F. Makahleh On behave of Vacuum & Cooling Group TAC 2013, F. Makahleh, Vacuum & Cooling 1.
Multipole Girders - Alignment & Stability (Multipole Girder Alignment technology & R&D) S. Sharma ASD: J. Skaritka, D. Hseuh, V. Ravindranath, G. Miglionico,
Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.
Engineering Integration of the Double- Double Bend Achromat (DDBA) into the Diamond storage ring Jim Kay Diamond Light Source Low emittance ring 2013 workshop.
Vacuum Pressures at IR Contents Y.Suetsugu KEKB Vac. Group 1.Outline of Vacuum System at IR 2.Behavior of Pressures 3.Remedies for Heating of Vacuum Components.
BROOKHAVEN SCIENCE ASSOCIATES SR Chambers & RF Bellows ASAC Review, 3/26-27/ of 21 SR Chambers & RF Bellows H. Hseuh, Vacuum Group ASAC Review of.
FAC, 10/12/06 D. Schultz 1 Readiness for 2007 Startup Linac Injector Controls ARR David Schultz.
30/05-03/06/2007 LCWS2007 and ILC2007, DESY Hamburg Germany Vacuum System Specifications What needs to be specified in Vacuum Specification for ICL Damping.
1 Tetsuhiko Yorita JASRI/SPring-8 Acc. Div. SPring-8 Vacuum System Contents - Outline of Vacuum system - Pressure behavior - Some topics.
1 BROOKHAVEN SCIENCE ASSOCIATES Production of Vacuum Components H.C. Hseuh NSLS-II ASAC Review October 14-15, 2010.
1 BROOKHAVEN SCIENCE ASSOCIATES Vacuum Systems H.C. Hseuh, Vacuum Group Leader 8 th ASAC Meeting for NSLS-II Project May 10-11, 2011.
DR Vacuum Component Overview April 25, 2012 Joe Conway.
MQXF Cold-mass Assembly and Cryostating H. Prin, D. Duarte Ramos, P. Ferracin, P. Fessia 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014.
SR Vacuum Systems and Front Ends
NSLS-II ASAC Review, 10/9-11/06 H-C. Hseuh,…, SR Vacuum Systems Storage Ring Vacuum Systems H-C. Hseuh, C. Foerster, J. Hu, G. Mahler, S. Pjerov, S. Sharma,
1 BROOKHAVEN SCIENCE ASSOCIATES S.Sharma 10/11/2006 NSLS-II Mechanical Subsystems Accelerator Systems Advisory Committee Review October 10-11, 2006 Sushil.
1 BROOKHAVEN SCIENCE ASSOCIATES EFAC Review – May 11, 2007 S. Sharma NSLS-II Frontends and Canted Wigglers Options Sushil Sharma.
BDS 11 Vacuum System for BDS [Completeness of RDR] Y. Suetsugu J. Noonan and P. Michelato Design principle Basic design Cost estimation.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
Polarized GaAs photo cathode development and the preparation of Gatling Gun cathodes at BNL The Single Cathode Activation Chamber.
Technical Challenges and Concerns S. Sharma and R. Alforque, R. Beuman, C. Foerster, E. Haas, E. Hu, P. Montanez, P. Mortazavi, S. Pjerov, J. Skaritka,
LCLS-II cryomodule alignment. 2 Wednesday meeting, 6/17/2015 Topics Alignment of Components inside the CM Tunnel Network Tolerances LCLS-II cryomodule.
Orbit Control For Diamond Light Source Ian Martin Joint Accelerator Workshop Rutherford Appleton Laboratory28 th -29 th April 2004.
BROOKHAVEN SCIENCE ASSOCIATES 0 Top-Off Safety Yongjun Li ASAC Meeting October 22, 2009.
SuperKEKB Vacuum System - for the positron ring - Y. Suetsugu KEKB Vacuum Group Outline Design and production status of key components Beam pipes for arc.
F. Mazzolini Vacuum Systems for Synchrotron Light Sources Barcelona, September 12– Front-end vacuum system F.Mazzolini.
Matthew Cox VSSLS Workshop Barcelona Sept SLIDE 1 1 Diamond Light Source Vacuum Systems Matthew Cox
NLC - The Next Linear Collider Project NLC Beam Delivery Lehman Review, May 1999 Vacuum System Cost Model Presentation by Leif Eriksson.
G5 Beam Line Vacuum System. G5 Beamline Vacuum System Design  Bakeable and Particulate free to Class 100 Clean Room quality Require Clean room QA and.
ALBA Vacuum System, E. Al-Dmour Vacuum Systems for Synchrotron Light Sources 12 th -13 th Sep ALBA Vacuum System ALBA VACUUM SYSTEM E. Al-Dmour On.
Beam Line Layout – Cooling Section There seems to be two options for energy measurement: at the 180 dipole and/or in a diagnostic branch at the end of.
Low Energy RHIC e - Cooling Meeting Minutes – 11/19/14 1. Cooling Section Magnets and Power Supplies –Most of power supplies will be from ERL (R. Lambiase).
41 st IUVSTA Workshop, Brdo pri Kranju, 21/06 – 24/06/2004 L. Schulz SLS Vacuum System Lothar Schulz Theo Bieri Nazareno Gaiffi Martin Steinacher.
Abstract Storage Ring Vacuum and Interface to Magnets Hsiao-chaun Hseuh, NSLS-II Project This presentation provided a quick overview of the storage ring.
Booster and Collider SC magnets. Design & prototyping of UHV and cryostat systems for Booster and Collider A.Smirnov JINR, Dubna, Russia NICA Machine Advisory.
Low Energy RHIC e - Cooling Meeting Minutes – 11/5/14 1.J. Tuozzolo will schedule a visit to NSLS next week to evaluate available magnets, power supplies,
NSLS Vacuum Experience Eugene J. Hu National Synchrotron Light Source Brookhaven National Laboratory Upton, NY USA September 12-13, 2005 (prepared.
Accelerator Vacuum Systems at DESY M.Seidel, DESY Workshop on Vacuum Systems of Synchrotron Light Sources Barcelona,
56 Mhz Vacuum Mike Mapes Mhz Insulating Vacuum TURBO PUMP WITH GATE VALVE AND GAUGE SET MOUNTED ON TANK SIMILAR TO RHIC CRYOSTAT & VALVE.
Low Energy RHIC e - Cooling Meeting Minutes – 11/5/14 1.Funding is available to purchase magnets. 2.Comment during presentation of attached slides: 180.
SKEKB Mini Work SKEKB Vacuum System – Arc Section – Contents Y.Suetsugu KEKB Vacuum Group 1.Beam Chambers 2.Pumps: Pump, Pressure,
Low Energy RHIC e - Cooling 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity.
Overall Layout 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity.
BROOKHAVEN SCIENCE ASSOCIATES SR Vacuum Systems ASAC Review, 7/17-18/ of 21 Storage Ring Vacuum Systems H. Hseuh, Vacuum Group ASAC Review of NSLS-II.
Low Energy RHIC e - Cooling Meeting Minutes – 12/23/ Cooling Section: –LF Solenoids:  At PPM, G. Woods has assigned buyer, SOW will be revised,
Canadian Light Source Commissioning Progress CLS Annual Users Meeting –
1 BROOKHAVEN SCIENCE ASSOCIATES Accelerator Systems Installation F. Willeke, ASD Director 6 th ASAC October 22-23, 2009.
Vacuum, H-C. Hseuh January 4, 2007 RHIC II Project Internal Cost Review H.-C. Hseuh Vacuum Systems January 4, 2007 Project Overview.
Overall Layout 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity Booster Cavity and Gun move (next slide)
F. Mazzolini for the ELETTRA Vacuum Group OLAV CERN, April 11– The ELETTRA vacuum system F.Mazzolini, L.Rumiz, J.Miertusova, F.Pradal, E.Mazzucco,
ASTRID2 Niels Hertel Nov 2012 AARHUS UNIVERSITET ASTRID2 – Status ESLS XX Berlin 2012 Niels Hertel ISA, Aarhus University, Denmark 1.
1 BROOKHAVEN SCIENCE ASSOCIATES 12th International Workshop on Accelerator Alignment September 10-14, 2012 Fermilab, Batavia, Illinois, U.S.A NSLS-II Girder.
LHC Beampipes Ray Veness / AT-VAC FP XII 08Beam Vacuum- R.Veness.
1 BROOKHAVEN SCIENCE ASSOCIATES Beam Stability Overview NSLS-II CFAC Meeting May 8, 2007 S. Krinsky.
2008/12/10 INFN R&D on Low Impedance Beam Chamber and Components Y. Suetsugu, for KEKB Vacuum Group Contents Introduction Beam Chamber Components Connection.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
RAMI Paul Aden. RAMI Analysis Reliability Visual inspection during each shutdown Service schedule for necessary components Majority of components to have.
Operated by JSA for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Y. R. Roblin, NUFACT 2012, July JEMMRLA Jefferson.
Summary of Presentation 1. Tolerances i. Vertical tolerances on BPMs (rf-BPM: ± 0.2μm, user BPMs: ±0.1μm, and X-BPMs: ± 0.1μm) ii. Tolerances on magnets’
Report Technical Director Storage-Ring-Installation Completed
Vacuum System P. Chiggiato TE-VSC
George Mahler, Steven Trabocchi, J. Tuozzolo, Stephen Brooks
Challenges of vacuum chambers with adjustable gap for SC undulators
R. Kersevan, TE-VSC-VSM 30/06/2016
CEPC Vacuum System Dong Haiyi 2017/11/5.
The Storage Ring Control Network of NSLS-II
CEPC Vacuum Systems Design Consideration
Presentation transcript:

Experience Fabricating the Storage Ring Vacuum Chambers for NSLSII Prepared by: Charles Hetzel July 12th, 2011

Facility and Cell Overview. Pumps and Valves. Outline Facility and Cell Overview. Pumps and Valves. Instrumentation and Absorbers. RF bellows. Chamber Cross Sections and Fabrication. Chamber Assembly and Production Status. Vacuum Instrumentation Rack Overview.

30 cells (DBA) in 5 pendants Ring circumference: 792m 6 Facility Overview Nominal energy: 3GeV Nominal current: 500mA 30 cells (DBA) in 5 pendants Ring circumference: 792m 6 5 6 6 4 3 1 1- Accelerator Tunnel 2- Experimental Floor 3 - 200MeV LINAC 4 - Booster (C=158m) 5 - RF Building, liquid He Plant 6 - Service Buildings 5 pendants 30 cells LINAC booster 2 6 6

Short straight section Typical Cell Layout Each section of the cell is composed of girders assemblies. 3 focusing and 2 bending segments (DBA). Alternating long and short straights (9.3m and 6.6m). Photon extraction takes place at S3 and G6. The ring is divided into 60 vacuum sections. Sectors can be isolated with RF gate valves. Design pressure (beam on): 10-9 torr. ID photon extraction Dipole and 3PW photon extraction Extraction points Gate valves S2 Multipole S3 Dipole S4 Multipole S5 Dipole Fast corrector S6 Multipole Long straight section RF gate valve 3 pole wiggler (3PW) Short straight section RF gate valve

100 l/s ion pump TSP cartridge Turbo pump cart 18 units Typical Cell Layout – Pumps 100 l/s ion pump TSP cartridge Turbo pump cart 18 units NEG strips (St707) 1500m Turbo cart rough pump Ion pumps over absorbers (large gas load due 2 sync rad) St707 SAES Getters Distributed NEG pumping 200 l/s ion pump (8” or 6”) TSP cartridge Right angle valve

All metal gate valves used in transport lines and font ends. Typical Cell Layout – Valves All metal RF gate valves isolate cells and ID straights. Double position indicators (to vac PLC and to EPS PLC). Radiation resistant and bakeable. Two first articles received. Additional RF gate valves used to isolate SC cavities. All metal gate valves used in transport lines and font ends. Right angle valves Rough pumping. Instrumentation isolation. RF gate valve 62 units All metal GV - DN100 4mm bow 2mm gap Returned to VAT for investigation All metal gate valve 40 units Right angle valve 270 units

Gauge tree with isolation valve. Typical Cell Layout – Instrumentation Instrumentation located in dipole chambers. CCG and RGA in S3 CCG and TCG in S5 Gauge tree with isolation valve. Typically scan and trend 7 on the 11

Intercepting surfaces are made GlidCop Al15. Typical Cell Layout – Absorbers Absorbers intercept unused dipole fan radiation. Intercepting surfaces are made GlidCop Al15. Stick absorber 20mm, 22mm, 25mm 130 units < 700W (< 5 W/mm2) Glidcop: 130°C, Tube: 119°C Flange absorber 21mm X 64mm 90 units < 200 W (< 16 W/mm2) Most sticks @ 25mm, 20mm for DW and RF Zero opening crotch 90° knife edge Crotch absorber 21mm 60 units < 1800W (< 57 W/mm2) GlidCop: 180°, Tube: 127°C

Angular deviation: +/-10 mrad Low impedance RF Shielded Bellows Water cooled flange Requirements: Misalignment: +/- 2 mm Stroke: +10/-15 mm Angular deviation: +/-10 mrad Low impedance Sleeve (316L) Bellows weldment (316L) RF fingers (GlidCop) Coil spring (Be-Cu) Contact springs (Inconel 718) Outside finger design (SPEAR 3) Weldment purchased Assy @ BNL Finger retainer (316L) Storage ring will require ~ 220 units 100 piece order in process Weldment purchased, assembly @ BNL

Fast corrector section Vacuum Chambers Multipole cross section Dipole cross section Almost all aluminum extrusion with bimetal flanges 3 channels extruded into the profile (cal rod) Fast corrector inconel sheet 1mm thick. Beam channel and the ante chamber extraction slot S4A cross section Fast corrector section

Only 2 vendors were willing and able to produce our extrusion. Extrusion fabrication – Mutlipole and Dipole Only 2 vendors were willing and able to produce our extrusion. 180 multipole extrusions. 140 dipole extrusions. Extrusions were fabricated over ~18 months. Incoming extrusions were inspected. Dipole chambers. Bent into shape. Thermally cycled. Re-measured. Packaged and shipped for machining. Large size (12.5” x upto 240” long) and the weight (~16#/ft) Low volume and the challenging tolerance (features but the straightness and twist requirement) 2 vendors one MP one DP All extrusions have been received. Dipoles required quite a bit more work. Bent using a press brake Thermally cycled to relax the extrusions before machining

Support to prevent collapse Several cycles per extrusion Dipole bending Support to prevent collapse Several cycles per extrusion Everyone bent different Bent to accommodate 6° angle in dipole Success rate improved dramatically (~80%)

2 machine shops were qualified Close vicinity to Argonne Chamber Machining 2 machine shops were qualified Close vicinity to Argonne Mounting feature machined with the rest of the chamber. Hi-Tech used some cleaver fixturing (losing registration) Walco machined the entire part in one setup. (167” [4.2m] x 108” [2.7m] x 56” [1.4m] 33,000#)

Welding of flange-adapter sub assemblies. Out of tolerance flanges. Chamber Welding at Argonne Welding of flange-adapter sub assemblies. Out of tolerance flanges. Sub assemblies to chamber welding. Bake out and vacuum certification. Leaky flanges (21 flanges, 10 chambers) Currently producing 10 chambers per month. All welding done at Argonne National Lab Critical tolerances, problems with Atlas flanges, leaky flanges Flange – transition sub assembly Sub assy to chamber (S6 exit port to chamber) Additional side ports, water fittings After welding, chambers cleaned, instrumentation and pumps. Bakeout and conditioning Vac certification prior to shipment Note: Pictures taken at Argonne National Laboratory

Flange ~ 70°C End adapters ~ 90°C Chamber Welding ~ 8”/min A-joint = 3.5-4 minutes Exit port = 10-11 minutes Flange ~ 70°C End adapters ~ 90°C All welds single pass except for pump ports

Target Avg. Measured Values Dipole Measurements Measurement description Target Avg. Measured Values Absorber flange to beam center 290.6mm 289.0 +/- 1.5mm Flatness of machined surface +/- 1mm +/- .6mm (1.8mm max) Flange angle perpendicular to the orbit plane 9 mrad max +/- 3 mrad (7 mrad max) Transition flange twist +/-3 mrad (7 mrad max) Minimum wall thickness in machined area 3mm 2.5mm (1.9mm min) After the chambers are welded and returned to BNL Measure and confirm that they meet our requirements.

Target Avg. Measured Values Multipole Measurements Measurement description Target Avg. Measured Values Absorber flange to beam center 252.0mm 251.5 +/- 1.4mm Chamber flatness near magnet pole cut outs +/- 1mm +/- .56mm (1.4mm max) Flange angle perpendicular to the orbit plane 9 mrad max +/- 3 mrad (10 mrad max) Transition flange twist +/- 5 mrad (6 mrad max) Exit port survey point X 332.2mm 332.4 +/- 1.5mm Exit port survey point Y 7.1mm 7.1 +/- .5mm

BPM rf shield NEG assembly Bake out and conditioning Cal rod heater Chamber Assembly BPM rf shield NEG assembly Bake out and conditioning Cal rod heater Currently assembling 10 chambers/month Assembly work performed in class 1000 clean room (Clean room picture) Install gauge tree (RGA, CCG) and small 20lps ion pump. Bake out (cal rod): Leak check, bake 150°C for 6 hours Activate NEG (50A for 2 min, 35A for 20 min). Valve off turbo when P <10-8 RGA scan for 12 hours to confirm gas species are stable. (Ozone treatment if necessary) Bleed up with N2 and seal. Ozone 400ppm in oxygen at 70°C for 6 hours. Ultimate pressures of low 10s – high 11s torr.

400ppm ozone in oxygen @ 70°C for 6 hours. Ozone Treatment Removal of surface contamination. 400ppm ozone in oxygen @ 70°C for 6 hours. NEG activation 35 A@120 C. Cool down and reprocess. Treatment performed on 9 out of 90 chambers. P = 1.3 x 10-9 Torr 3X bake 6 h@120 C. P = 8.5 x 10-10 Torr Proven to be very effective

Chamber Ordered Machined Welded Assembled Production Status – Multipole and Dipole Chambers Chamber Ordered Machined Welded Assembled S2 34 32 (94%) 30 (88%) S4 33 18 (54%) 16 (47%) S6 24 (71%) 12 (35%) 35 mm Dipoles 62 62 (100%) 36 (58%) 27 (44%) Totals 163 136 (83%) 98 (60%) 85 (52%)

Install after magnet pre-alignment (100µm). Girder Integration Install after magnet pre-alignment (100µm). BPMs positioned using laser tracker (mechanical center). Adjustment may be required after magnetic alignment (30µm). Pumps and bake out wiring added after final alignment. Final leak check and vacuum signoff. Mechanical centers pre-aligned w Hamar laser Next magnets split so the vac chamber can be installed. Pre installed vibrating wire tube Survey uses laser tracker to position the BPM to mechanical center BPM position did not change when fixtures were removed. Magnets are closed environmental room for magnetic alignment. Depending on adjustments chamber may need to be repositioned Final positions of BPMs stored in survey file. Pumps (ion and TSP), bake out wiring, final leak check and signoff.

Three racks/cell located on mezzanine Vacuum Instrumentation Rack Overview Three racks/cell located on mezzanine IPPS, TSP power supplies Gauge controllers (CCG, Pirani) PLC chassis, MOXA Cables: Low smoke, zero halogen, tray rated Computer system w touch screen

Gao-Yu Hsiung and June-Rong Chen (NSRRC) Acknowledgments Joe Gagliano, George Goeppner (APS) Vacuum techs C. Longo S. Sharma L. Doom V. Ravindranath T. Dilgen B. Kosciuk Gao-Yu Hsiung and June-Rong Chen (NSRRC) Many others in and out of NSLS-II